Mini Jib Tower Crane with Competitive Price

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Descriptions of our tower crane:

1.QTZ50 (5010) Max Load 4 ton Stationary Crane 


2.Construction Usage 


3.Workshop Usage 


4.Container Usage 

 

5.Mineral Are Usage 

 

 

Features

 

1.Mechanism: Variable frequency

 
2.Surface treatment: Shot blasting X


3. Paining: Three layers, primer, top coat and anti-rust painting

 
4. Electrical Components: Scheider Brand

 

Advantage of our tower crane:

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Independent height (m)

31.5

Max height with attachment (m)

110

Working range can be adjusted(m) 

38/43/48

Min working range(m) 

2.25

Max lifting capacity(t)

4

Tip load @ 48m(t)

0.8

Hoist mechanism

Falls

2

4

Lifting capacity(t)

1

2

2

2

4

4

Speed(m/min)

70

35

7

35

17.5

3.5

Motor

YZTD225M2-4/8 /32    15/15/3.5KW

Trolleying mechanism

Speed(m/min)

20/40

Motor

YDEJ100-4 /8   2.4/1.5KW

Slewing mechanism

Speed(r/min)

0-0.6

Motor

YD132S-6/8  2.4/1.8KW

Climbing speed(m/min)

0.4

Counterweight(t)

7.6

Mast section size(L×W×H)m

1.4×1.4×2m

Working temperature

-40-+60°C

Total power (KW)

23

Power supply requirement (KVA)

115KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

25mm2(3+2, 5 cores)

Startup voltage & current

380V×95%=361V       180A

Rated working voltage & current

380V                   65A

 

TC4808 with CE ISO certificate top kit 4T types of tower crane price for sale

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is tower crane a tower crane?
It is tower crane, tower crane, commonly known as tower crane, tower crane --- tower crane. Ha ha, hope to adopt.
Q:What is the allowable range of vertical deviation for tower cranes?
The verticality deviation range of ZOOMLION tower crane is allowed within 4/1000.
Q:Under what circumstances are winches used and under what circumstances tower cranes are used?
1, this depends on the specific construction organization design, the general height of less than 20 meters, all with the hoist.2, the framework of the structure, four, 18 meters, construction area, if large, with tower cranes, of course, labor-saving, time-saving and rapid progress, if the construction side agrees, it is best to use tower cranes.3, artificial wages are too high, the project is big, with the winch is not worthwhile, progress can not catch up, workers are also big grievances. The track type tower crane is usually used in shipyard or fixed freight yard.
Q:What kind of equipment must be installed on luffing trolley of horizontal luffing tower crane?
It must be installed:To prevent the trolley cable broken car slip away;The car must have a support wheel to prevent the trolley from hanging in the middle.
Q:What are the components of a tower crane? What are its main technical parameters? What is lifting torque?
2 tower cranes (tower crane) referred to as tower cranes, also known as tower cranes, originated in Western europe. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..Has a good safety device 3, tower crane, such as lifting weight limiter, amplitude limiter, height limiter and load torque limiter limiting device, and travel limit switchestower lights wind instrument, wind clip rail device ladders athletic supporter circlewalkways and railings. The driver's cab is comfortable, easy to operate, with good vision and perfect communication facilities.
Q:What should the sub contractor do before the installation of the bridge crane in the workshop?
Baidu search [tower crane tower demolition, lowering section safety technical disclosure]. If it is installed, remove the "two words" to "installation", and other contents are adjusted slightly.
Q:What is the calibration value of a tower crane?
Three, gravity moment MThe product of amplitude L and the corresponding lifting objects called Q gravity lifting moment, the unit is kN - M.Tower crane capacity is based on lifting moment representation. It uses the product of the maximum working range and the corresponding maximum lifting load as the calibration value of the lifting moment.Four 、 lifting height HIt refers to the vertical distance from the surface to the parking level of the crane sling allows the highest position. The unit is m.Five, work speed1. lifting speed (down) Vn - stable state of motion, the vertical displacement velocity of the rated load. The unit is m/min.2. crane (CART) running speed of Vk, stable state of motion, the running speed of the crane. The operating speed of a crane with rated load on the horizontal (or horizontal rail) surface, at the height of 10m away from the ground, and when the wind speed is less than 3m/s.
Q:How about the installation and disassembly of the tower cranes?
Authorized by the national security inspection department, the local special operations training school or the technical quality supervision bureau, after the study, assessment, qualification and graduation permit, will give you special operations installation, removal operation certificate.
Q:What windproof devices should be set up for crane work?
4. windproof anti-skid safety deviceThe utility model is a safety device for preventing the crane of the open-air work from sliding along the track under the action of strong wind, and the outdoor working track type crane shall be installed. The safety function of the utility model is that when the crane encounters the maximum wind force in the non working state, the crane is not blown to prevent the crane from overturning at the end of the rail. Common windproof devices include rail clamps, anchoring devices, and iron shoes.(1) rail clamping device: it is widely used in all kinds of outdoor track crane, its working principle is to use the two sides of a clamp rail head, the crane is fixed on the track through the combination of the clamping force, the crane can not slip. The design requirements of rail clamp, clamping force of rail clamp must be greater than the crane sliding force, to ensure that the local maximum wind, crane stays closed; rail tongs should rely on device components own weight or spring, and should not only rely on the driving effect of the power of the driving device, to to prevent the power supply is interrupted, the rail clamping device does not work; power driven rail clamping action should be behind the operation mechanism of brake action violently to eliminate possible crane brake.(2) anchor device: it uses a bolt or a flashboard device, a chain or a top pole to connect the crane and the track foundation into one body, and is used for fixing the crane in the big storm when not working. Since the anchor device can only be located in a certain position of the track, the crane can be anchored to this position, which is not suitable for immediate weather protection in an emergency.(3) iron shoes: it is a wedge device, when used, the wedge-shaped tongue inserted between the wheel tread and rail top surface, the iron shoes of the slope constitute the resistance to sliding wheels.
Q:Where can I get the tower crane manufacturing permit?
This is the permit of the Bureau of quality supervision

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range