MET COKE of 40 -- 100 mm

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
100 m.t.
Supply Capability:
3000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


1. Structure of MET   COKE   of   40  --   100  mm    Description:

Coke is made by high temperature metallurgical coke for blast furnace smelting, casting and gasification. Occurring in the process of coking after recovery and purification of coke oven gas is a high calorific value of fuel, is an important industrial raw material in organic synthesis.

Coke is mainly used for blast furnace ironmaking and used for copper, lead, zinc, titanium, antimony, mercury and other non-ferrous metal smelting of blast furnace, reducing agent, compound and the function of stock column frame. 

Blast furnace with Coke instead of charcoal, which laid a foundation for the large-scale of modern blast furnace, is a major milestone in the history of metallurgy.

2. Main Features of the  MET   COKE   of   40  --   100  mm        :

• Quality assurance

• Mutual benefit

• Preferential price

3.MET   COKE   of   40  --   100  mm    Images:

 

MET   COKE   of   40  --   100  mm

MET   COKE   of   40  --   100  mm

MET   COKE   of   40  --   100  mm

MET   COKE   of   40  --   100  mm


4. MET   COKE   of   40  --   100  mm         Specification:

Parameters

Guarantee

Moisture (ARB)

5% max

Ash (DB)

12.50% max

Volatile Matter (DB)

1.4% max

Sulphur (DB)

0.7% max

Phosphorus (DB)

0.035% max

CSR

60% min

CRI

28% max

M40

82% min

M10

8% max

Size 30-90 mm

90% min

+90 mm

5% max

-30mm

5% max

Mean Size

52 mm

5. FAQ

We have organized several common questions for our clients,may help you sincerely:

1) How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

2) What are coke's main physical properties?

The average heat capacity is 0.808 kj/(KGK) (100 ), 1.465 kj/(KGK) (1000 )

Thermal conductivity is 2.64 kj/(MHK) (room temperature), 6.91 kj/(MHK) (900 );

Ignition temperature (air) is 450-650 ℃.

3) How about your company?

Our company began to export coke when China cancelled 40% of coke export tariffs and quotas on January 1, 2013. We export many kinds of coke, such as CSR60 % and CSR 62% metallurgical coke (met coke), the NUT coke of 20 to 50 mmcoke breeze of 3 to 6 mm, and so on.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Various types of coal coke are the main test items
The basic instrument of coal laboratory of these conventional indicators required are: calorimetry, sulfur detection apparatus, muffle furnace (Gao Wenlu), or when the microcomputer controller temperature controller, drying oven (oven), instrument, glial layer measuring instrument, the ash melting point determination of caking index, in addition to auxiliary equipment: crusher, pulverizer, electronic balance, vibration sieve machine, two points etc.. The above is the coal test indicators by Hebi Huanuo coal testing equipment factory to provide, I hope to help you.
Q:What is the essential difference between coal and coke?
(1) power coal(2) coking coal (bituminous coal)(3) coal used in coal chemical industry, which mainly includes gasification coal, coal for low temperature carbonization, hydrogenation of liquefied coal and so on.
Q:How coke is involved in steelmaking,
To be exact, you don't need coke for steelmaking, you say that it's iron making
Q:Coke is how to make it? What is the use?
Coke production has prepared the material into the coal charging car from coal tower, were sent to the furnace chamber. The gas produced by the dry distillation is sent to the chemical product recovery workshop for processing. After a coking period (from charging to pushing the required time is generally 14 to 18 hours, depending on the carbonization chamber and the width), a pusher will mature by refining coke coke machine into the coke car; coke quenching, coke is discharged into the cold coke; then screening and storage (Figure 4).The coking plant is generally composed of two coke ovens. The two coke ovens are arranged on the same central line, and a coal tower is arranged in the middle. A furnace with coke oven machinery -- corresponding charging car and coke machine, machine coke, coke quenching car and motor vehicle; also equipped with a set of facilities including coke quenching, coke quenching tower, coke quenching pump, coke powder and coke powder sedimentation tank grab, arranged in the end furnace group. The center of the coke quenching tower is not less than 40 meters from the center of the carbonization chamber. If dry coke quenching, coke oven station. The coking plant is also equipped with the necessary piping and reversing system.
Q:The chemical composition of coke m10.m25 refers to?
M10 refers to the wear resistance of coke, M25 refers to the crushing strength is the mechanical strength. Mainly the cold strength of coke. Coke is also the most important indicator is the hot state, CRI thermal reaction and CSR reaction intensity. In blast furnace production, both cold and thermal strength are important.
Q:Coke indicators are divided into grades
The index of pore structure is mainly expressed by the porosity rate (the percentage of the total volume of coke), which affects the reactivity and strength of coke. Different uses of different coke porosity index requirements, the general requirements of metallurgical coke porosity in the 40 ~ 45%, 35 ~ 40% in coke, coke export demand in about 30%. Coke crack degree and the porosity level, and the coking coal has a direct relationship, such as coal based coke refining, crack, high porosity, low strength; with coal as the foundation of the coal refining coke crack less, low porosity and high strength
Q:Coke can be used to do what carbon black can be used to do?
1 coke is used to restore the iron ore, coal through pressure, isolated air and high temperature dry distillation, and the by-product of coal gas and coal tar is an important chemical products;
Q:What is the difference between coking coal and coke
Coking coal is an essential raw material for the production of coking coal, coking coal is one of the main uses of coke, coke is full of coking coal, coking coal is necessary for coke.
Q:How much coke oven gas is produced?
From the production equipment and technology of the popular view, a ton of coke oven gas produces about 400 cubic meters, of which about 200 cubic meters of coke oven returned through the pipeline used for coking heat source, the remaining more than and 200 cubic meters was emptying, "or the lantern".
Q:What is the use of coke
A definition of English Name: Coke, coke metallurgical coke blast furnace coke, coke, iron alloy coke and non-ferrous metal smelting coke ". Since more than 90% of metallurgical coke is used for blast furnace ironmaking, it is often referred to as coke. Coke is a special and molten iron cupola coke. Coke is the main fuel cupola molten iron. Its role is to melt the burden and make the hot metal overheating, the support column to maintain good ventilation. Therefore, the foundry coke should have large blocks, low reactivity, porosity is small, with impact crushing strength, low ash and sulfur enough.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range