JL6013-8ton Topkit Tower crane for construction site

Ref Price:
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

 

Description of  TOWER CRANE JL6013

1) JL6013 tower crane has competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator

 

 

SPECIFICATION of  TOWER CRANE JL6013

  • Max. working range 60m, tip lifting weight 1.3T and Max. lifting weight 8T.

  • Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

  • Trolleying mechanism can provide two operation speeds.

  • Free standing height (m) 50

  • Max height with attachment (m) 200

  • Working range can be adjusted(m)60/56/50/44/38

  • Min working range(m)2.5

  • Max lifting capacity(t) 8

  • Tip load @ 60m(t)1.3


Packaging & Delivery of TC6013

40HQ container

25~30days after deposit







Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Who is responsible for the construction of the pile foundation of the tower crane?
1, the pile foundation of the pile and tower crane foundation pile is not the same item, cannot pile foundation pile and tower crane foundation pile together to talk about.2, you did not say who is tower crane?. Who is responsible for the tower crane installation, including tower crane foundation construction.3, but, in fact, in most cases, the mechanical leasing company only provides technical requirements, providing tower crane foundation section. Piling and foundation concrete are the responsibility of the contractor.4, if the contract does not have a definite agreement on the construction of the tower crane foundation, the general contractor shall be responsible for the cost of piling the tower crane foundation. The piling Team can be the construction unit of the pile foundation, and also can be found by the general contractor.5, in the future tower crane foundation construction program should be clear about this matter, avoid controversy.These are only personal opinions.
Q:Is it difficult to test tower cranes?
See the ability of individuals, the first ticket 650 yuan graduation card ID card (copy) medical certificate according to 3 inch 3 days learning theory exam two days of practice examination through 15 days notice thank you hope to adopt licensing
Q:What is a tower crane without a collector?
Without the collector, the main cable of the tower crane directly reaches the power distribution cabinet after turning.
Q:All types of jack up cranes. How is the maximum lifting torque converted?
The moment of the tower crane is set up by the factory, and can not be changed. How do you want to convert it?If the nominal torque is converted to kn tons, 1 tons is equal to 9.8 kn.
Q:What is the torque limiter of the tower crane A: the lift is stopped when the lifting torque is exceeded. B: over gravity
The torque limiter acts as follows: (a)In lifting process, when the weight of the lifting object moves ahead of the trolley when the lever force exceeds the moment limiter, the hook rises, the motor and the trolley forward motor are stopped at the same time, and the utility model has the safety function.
Q:Who invented the tower crane, please?
In 1923, a prototype of modern tower crane was built. The first relatively complete modern tower crane appeared in the same year. Our tower crane started from Shanghai in 1950.
Q:In the case of tower crane operation, the operation should be stopped
In case of six or more gales, heavy rain, heavy fog, heavy snow or tower crane, you should stop working
Q:What is the difference between a tower crane and a jack up tower crane?
The jack up tower crane is a tower crane (that is an internal climbing tower crane) that is added and reduced by its own special device, namely, the standard section of the tower (that is, the attached tower crane) or the whole climbing tower itself.
Q:How much more than m of tower crane jib winch point height should be equipped with anemometer
The use of 4.0.15 tower crane height of more than 30m should be equipped with obstacle lights, jib root hinge height of more than 50m should be equipped with anemometer.
Q:When the tower crane foundation is found, what should be discontinued?
The settlement, inclination and cracking of tower crane foundation can affect the stability of tower crane and should be stopped

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range