JL5510 Topkit Tower crane for construction site

Ref Price:
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
100 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

 

Description of  TOWER CRANE JL5510

1) JL5510 tower crane has competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator

 

 

SPECIFICATION of  TOWER CRANE JL5510

  • Max. working range 55m, tip lifting weight 1.0T and Max. lifting weight 6T.

  • Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

  • Trolleying mechanism can provide two operation speeds.

  • Free standing height (m) 42

  • Max height with attachment (m) 200

  • Working range can be adjusted(m)55/50/44/38

  • Min working range(m)2.5

  • Max lifting capacity(t) 6

  • Tip load @ 42m(t)1.0


Packaging & Delivery of TC4808

40HQ container

25~30days after deposit




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:in the videogame the bully how do you get past the task where your in a pit with jonny and a magnetic crane?
What you have to do is knock out all of Johnny's friends who are above you shooting things down at you. Use your sling shot to knock them out. It will take 2-3 shots for each guy. This will allow your friend to run around to the magnetic crane and start it up for you. Once Johnny goes under the crane, he will lose his bike. Then he'll be on foot, and will be a little easier to kill. Try to make sure you keep as much energy as you can while you're getting rid of Johnny's friends (run around alot so what they shoot at you won't hit you), because you'll need the energy to finish off Johnny. Good luck!!
Q:I have some cranes in our field next door and I was wondering do they eat chickens? I live in Wisconsin.?
Ha ha ha, You have nothing to worry about!
Q:Any opinions on camera cranes?
Camera okorder.com/
Q:in the karate kid 1984 is the crane kick something they just put in the movie and not real ?
The Crane kick is an actual Martial Arts move it is done in some Hung Ga Kung Fu forms but differently than the one in the movie because it is done without jumping and is much faster the crane kick in the Karate Kid is just a figment of the director and screen writers imaginations.
Q:How do you calc the size crane u need for lifting something if the only info given is ft high x ft over % wt?
I am not sure that you are giving us sufficient information. I presume that your crane truck has the boom hinged quite close to the ground, but I am sure that the specified lifting weights will not be achieved until the boom makes an angle of at least 45 degrees with the ground. The 115 foot boom will then sweep a circle of 115 x cos(45) = 81.3 feet, and lift a maximum of 115 x sin(45) = 81.3 feet above the hinge. If the boom is elevated to a 60 degree angle, the circle swept will be only 57.5 feet, but it will lift 99.5 feet. If the boom is lowered to 30 degrees, the circle swept enlarges, bt the distance lifted drops, and the weight lifting capability will also be derated. If the crane has a tower and the weight rating is for a horizontal boom, the maths are quite different.
Q:What is the allowable range of vertical deviation for tower cranes?
The verticality deviation range of ZOOMLION tower crane is allowed within 4/1000.
Q:how do they get cranes off of skyscrapers when there done?
Tower okorder.com... Roof top cranes can remain or be dismantled and removed by several different means including smaller jib cranes or even by helicopter. The jib crane can remain or else also be dismantled and removed.
Q:How Do You Build A Hydraulic Crane?
The first (visible in the first link) is the boom angle pistons. These are mounted to the rotating section and to the boom. The second hydraulics are inside the boom arm. The boom actually has several sections that telescope (like a motorized car antenna). Each section has a hydraulic piston that pushes the section out of the end of the boom. The cable that hangs off the end is wound onto a large cable reel that is on the rotating section. This cable reel is also gear driven, but is usually just run by two standard spur gears. E-mail me with more details as to how big you want this project and I can help out more from there. Make sure your account is set up to allow e-mails.
Q:what year did ichabod crane die?
Ichabod Crane is a fictional character in Washington Irving's short story The Legend of Sleepy Hollow
Q:How to improve tower crane industry in china?
Powerful okorder.com) manufacturing standards according to the rules of tower crane industry market economy.    Manufacturing industry is a huge system, the formation of a broad face, not one or two companies can do a good job. Powerful alliances to promote the group is a good idea, but it can not Arbitrarily arranged association, we must do things according to the market economy laws. A lot of problems are not necessarily be resolved by the professional industry, you can use the cross-industry solution.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range