JL5510 Topkit Tower crane for construction site
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description:
Description of TOWER CRANE JL5510
1) JL5510 tower crane has competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;
3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator
SPECIFICATION of TOWER CRANE JL5510
Max. working range 55m, tip lifting weight 1.0T and Max. lifting weight 6T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 42
Max height with attachment (m) 200
Working range can be adjusted(m)55/50/44/38
Min working range(m)2.5
Max lifting capacity(t) 6
Tip load @ 42m(t)1.0
Packaging & Delivery of TC4808
40HQ container
25~30days after deposit
- Q:Where are cranes mostly found in the world?
- Most cranes for building are in China I have seen Sandhill Cranes (birds) by the thousand flying north in South Dakota.
- Q:Please help. I need real answers.
- About Ichabod Crane, the school master, Washington Irving writes in A Legend of Sleepy Hollow: He was, in fact an odd mixture of small shrewdness and simple credultiy. His appetite for the marvellous, and his powers of digesting it, were equally extraordinary; and both had been increased by his residence in this spellbound region. Ichabod Crane digests Cotton Mather's (a Puritan preacher) History of New England Witchcraft, a book in which he firmly and most potently believes. He spends many hours reading Mather's work, and fluttered by his excited imagination he believes that he is struck with a witch's token at times. To drive away the evil spirits, he sings psalm tunes. Nevertheless, Crane still delights in the supernatural, so he spends winter evening with the old Dutch wives who exchange tales of ghosts and goblins around the fire. In turn, Ichabod entertains them with Mathers's reports on witchcraft, as well as predicting what the sounds in the winter air portend.
- Q:I need to draw an injured crane (the bird) with an arrow in its wing, lying on the ground...preferably with a splayed wing.How do I draw this? Sketches would help.Thanks.
- Why do you want to draw an animal that is suffering? Draw something that is positive.
- Q:heres a picture of one
- There are a few types. Some more modern cranes jack themselves up and then back down after wards. There is a large mis-conception about tower cranes. Many people think they can handle larger loads than portable jib cranes. This is not the case. The advantage of a tower crane is its cost and ability to see. The ones that are not capable of jacking themselves up are erected and taken down by large jib cranes with many times the lifting capacity and cost.
- Q:Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane, if each were to unload the same ship alone. How long does it take for each crane to unload this ship?
- If an answer of -4 hours is expected, pl. excuse. The practical difficulties of the faster cranes are constraints - the loading to / unloading from any crane is tricky, time consuming are with practical problems. The ship. yard where it is angered, the type of the cargo also decide the swiftness of unloading ; so it is not simple ratio !
- Q:What are the safety devices in a tower crane?
- Moment limiting torqueWeight limit; weight LimitedThe car looks for car restrictions limitFrom the ceiling to prevent hoistingThe slewing limit is limited to Slewing
- Q:What type of tower crane does not include tower crane in variable amplitude mode?
- Tower crane, tower crane.Tower crane according to its different types, there are the following classification methods.(1) divided by structure type of fixed tower crane by connecting a fixed tower in the foundation or structure, tower crane lifting operation.
- Q:He has to be in his 30's to 40's but I can't find anything that gives me a definite age.
- Okay Well, You havent specified in what, but presuming you mean in the comics, and baring in mind he was the psychologist when Thomas Elliot and Bruce were only 7-8, then the bare minimum he could have been then was 21, though he was likely older. THEN presuming Bruce is around 35, though he also is probably older, then the bare minimum Crane could be is 48. that being said, he is likely between 48-60. He just looks good for his age ;). this of course is in the comics, however. The movie is different.
- Q:Im hearing this like every day theres more going down..why is it happening? A terrorist plot perhaps? I say we send some troops to stand guard and prevent another tragedy!
- These are dangerous peices of equipment, they endure high stress and are at times pushed to the physical limits. I have on occassion worked with and under them and always had a lot of respect and always felt safer when away from them. Construction cranes in particular are more dangerous because they are forever changing in height,position, amount and type of load. Cranes in permanent installations are ususlly carrying same or similar loads. Construction sites are hazardous due to many factors but just about everything on site gets handled by the crane at one time or another. Inspection,inspection, and re-inspection with concurrent correction/adjustment are the only preventative measure availble beside the assurance of competency of the operator. There are plenty of laws about them already but this is not to say new ones might be justified as new hazards become apparent. Most terrorists are too dumb or lazy to get involved with cranes--why bother when so many easy targets are out there !!!!!!!!
- Q:I have a vessel 40 feet off the ground in a platform, and the crane can get to within 30 feet of it (from the side). I'm more curious of the process for sizing them though.
- It okorder and view some of the product guides and review the performance data and load charts. It also depends on what type of support soil or foundation that is capable of supporting the crane.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
JL5510 Topkit Tower crane for construction site
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords