• High Quality Grinding Glass Spheres System 1
High Quality Grinding Glass Spheres

High Quality Grinding Glass Spheres

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1000 Kilograms kg
Supply Capability:
500 Tons per Month kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing
Detailed Product Description

Grinding Glass Spheres

strong hardness

new glasses for material

Round ratio above 85%

ISO, CE

Grinding Glass Spheres

High Quality Grinding Glass Spheres

III. Hardness

 

HV, Loading 100g, residence time: 12s

 

the average of five point: 5270Mpa

standard

code(HV): ≥ 5000Mpa

 

IV. percentage of damage

1. test condition

(1)shot peening Target:Thickness:1.2mm (steel plate)

(2)air pressure of the nozzle:0.3Mpa

(3)the space between the nozzle and the Target: 200mm

(4) time of shot peening:5min

(5)the diameter of the glass beads: 250 microns

(6)Gross Weight of the tested glass beads: 1020g

(7) the weight of the damaged

glass beads after shot peening: 1.02g

2.percentage of damage of the test : 0.1%

 

V. Application

 

They are mainly used for the disperser, grinding media of industries, such as coloring, paint, ink, coatings, resins, chemical engineering, with the advantages of smooth surface, even size, high hardness, good chemical stability. Thanks to the characteristics of heat-resistant, wearable, compression strength, the filling-type bead could be used to improve glass fibre reinforced plastic, rubber, and so on.

 

 

Q:Requirements of waveform guardrail column piling skills training program and training program.
B, anti blocking blocks, wave beam, end installation(a) after installing the upright column, the bracket (block block) can be installed. The bracket (stop block) is fixed between the wave beam and the upright post through the connecting bolt. The bracket (block) shall be adjusted to make it in place before tightening the connecting bolts.(b) the wave beam is spliced with each other by a splicing bolt and is fixed by a connecting bolt bracket (an anti blocking block), and the direction of the overlap of the roadbed guardrail and the corrugated beam is the key of the installation, and the installation is carried out in strict accordance with the drawing. The direction of overlap shall be consistent with the driving direction. The wave beam should be adjusted continuously during the installation. Therefore, the connecting bolts and the splicing bolts should not be tightened too early so that the long holes in the corrugated beam can be adjusted in time during the installation process so as to form a smooth alignment and avoid local irregularities. When the alignment of the guardrail is considered satisfactory, the bolt can be screwed at last. The connecting bolt between the bracket (stop block) and the wave beam should not be screwed too tight, so that the temperature stress can be adjusted by using a long round hole.(c) the end beam is spliced with standard section guard bars through splicing bolts. The construction method of the end beam is basically the same as that of the wave beam.
Q:Is the spiral pile driver still being dug? Is it easy to operate? How many people do you need?
Shandong strong pile driver without manual shovel, the operation panel is very simple, a day will be able to operate skillfully, an operator can work, save worry and effort.
Q:How many hours will it take for the 200 piles and the 1 pile drivers?
200 piles of 1 piling machine is generally need 19 day time is finished, also need 152 hours to complete.
Q:What's the special use of a pile driver?
In addition to see how much power head in the face of tricyclic sticking case, two start if exceeds the rated current of it easily after all, a burning motor, power head is not cheap, suggest to consider all hydraulic power head, the power head is three was a bit expensive, but in the face of the card when drilling, two times can start easily and smoothly, the impact of the power grid is very small.
Q:I heard that the operation of the pile driver can make about ten thousand a month, is it possible? It sounds a bit dodgy. Who knows about this job? Please tell me how much you can make it for a month
Generally similar, but if the site is more, then more than this money
Q:What is the maximum CPU of a pile driver? What about the performance of graphics will be piling machine CPU?
AMD pile driver FX8350 performance similar to 640 graphics cardsAMD's new series, CPU, has a core code called Bulldozer, and the Chinese translation is bulldozer.
Q:My family is in the countryside, and now more than 100 meters behind the house in the pile is the kind of shock, our house is built in 99 years, has been very good. Since the piling, I have been shaking the door, the construction party every day for more than 8 hours, has been more than 10 days, and now I have a lot of cracks in the floor. What's the influence of our family, please? Are there any rules for investigating what should be done before piling?
The best co-ordination, not to consult the Construction Planning Bureau
Q:Want to mortgage a hydraulic pile driver?. Excuse me, what brand, what tonnage is more competitive?.Could you introduce the profit, expense, cash flow of piling machine, the more detailed, the better.
Qingyuan Xin Feng Machinery Factory production of 2 Taiwan good ~ we are the brand ~ I just listen to my father said that the specific amount should be 200 thousand ~ a ~ details of your advice of high manager soldiers accounted for ~ should Baidu can be found in the.
Q:How many meters per day can a foundation shovel in Luoyang be 80 centimeters in diameter? Is it easy to damage?
Often it is easy to wear stone blade but this thing a shovel blade is dozens of pieces of money I play this machine for many years I was in Jiangxi Ganzhou Hebei Shun Machinery Factory bought machine but then buy is 60 cm in diameter of the machine is very good quality basically not straight holes emptying the shovel in my experience this machine is vulnerable parts of the wire rope and hoist brake belt and motor belt but these are very cheap hardware stores are sold. 80 cm I have not used but I use 60 cm hit a ten meter hole in 40 minutes the course you have to hoist operation very skilled ah Hey this is my actual experience you want to help
Q:What type of machine is needed for highway foundation piling machine? Price?
This series of drilling machines is a new type of pile foundation construction machinery, which adopts hydraulic walking, electric control and long auger drilling. Hydraulic drive chassis can achieve 360 degrees of full swing, in place, move, tune, equal action, fast and accurate. The utility model can be used for carrying out the drilling operation, and the steel cage can be lifted by itself and the grouting operation can be carried out by adopting two electric control winches. The output shaft of the power head is hollow, and besides the general long spiral dry method, the deep mixing method can also be applied.
The company has wide experience and offers a range of equipments, expertise and services to the road marking industry. The products range from road marking equipments, reflective materials, pile driver, traffic signs, traffic barrier as well as undertaking turnkey projects. Our company will be further committed to contributing to the designing, R&D, manufacturing, and providing high quality products, customer care, prompt services as well as strong technical support to both domestic and overseas customers. .

1. Manufacturer Overview

Location Liaoning, China (Mainland)
Year Established 2000
Annual Output Value
Main Markets North America
South America
Eastern Europe
Southeast Asia
Africa
Mid East
Eastern Asia
Western Europe
Company Certifications ISO:9001:2000

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage 31% - 40%
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size: 5,000-10,000 square meters
No. of Production Lines 6
Contract Manufacturing OEM Service Offered
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords