High Efficiency QTZ40 Tower Crane for Sale,Tower Crane Price

Ref Price:
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

The topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, saves on labor cost, providing excellent safety features and efficient work. It is also suitable for crossover work with other cranes without the tower cap and pull rod, the safety will be increased when there is crossover work. Our Cranes are suitable for the special requirement involving height, such as nearby airport, tunnel, workshop, and construction sites with high-tension cables. Also suitable for the construction site that has crane boom requirements, it can be used as an internal climbing crane in a high-rise buildings, irregular roofing or small areas. Convenient for dismounting in restricted construction site, dismounting each crane boom at a time manually. The topless tower crane also contains steel structure for crane booms causing long life usage and high safety standard. The crane boom is perfectly applicability, for high-usage, the design of the topless tower crane boom is easy for realizing the serialization and standardization.

Product Features:

·         Widened equipment capacity and working scope.

·         Suitable for the groups of tower cross framework.

·         Noise relief stability with and combination amplitude range.

·         Can sustain height adjustment for occasional exceptional height construction procedures.

·         Large weight capacity, effectively solving high steel structure construction lifting capacity requirements.

 

Independent height (m)

40

Max height with attachment (m)

121

Working range can be adjusted(m) 

40/50

Min working range(m) 

2.5

Max lifting capacity(t)

6

Tip load @ 48m(t)

1.3

Hoist mechanism

Falls

2

4

Lifting capacity(t)

1.3

-

3

3

-

6

Speed(m/min)

9

38

80

4.5

19

38

Motor

YZTD225L2-4/8 /32-24/24/5.4KW     

Trolleying mechanism

Speed(m/min)

20/40

Motor

YZTDE132S-4 /8-3.3/2.2KW  

Slewing mechanism

Speed(r/min)

0.6

Motor

YZR132M2-6-3.7KW

Climbing speed (m/min)

0.5

Counterweight (t)

11

Mast section size (L×W×H)m

1.6×1.6×2.5m

Working temperature

-40-+60°C

Total power (KW)

34

Power supply requirement (KVA)

180KVA for generator

Cable type (<30m from site power source to lower electric box of tower crane)

50mm² (3+2, 5 cores)

Startup voltage & current

380V×95%=361V       285A

Rated working voltage & current

380V                   65A

 

 

Product Specifications:

Minimum Order Quantity:

1 unit

Unit:

unit

Loading Port:

China main port

Supply Ability:

100 unit/month

Payment Terms:

TT OR LC

Package:

unit

 

 

Product Images:

High Efficiency QTZ40 Tower Crane for Sale,Tower Crane Price

High Efficiency QTZ40 Tower Crane for Sale,Tower Crane Price

High Efficiency QTZ40 Tower Crane for Sale,Tower Crane Price

High Efficiency QTZ40 Tower Crane for Sale,Tower Crane Price

High Efficiency QTZ40 Tower Crane for Sale,Tower Crane Price


High Efficiency QTZ40 Tower Crane for Sale,Tower Crane Price

FAQ:

Q1: What is shipment procedure?

A1: You can put two sets of wheel loaders in one 40HQ container. The spare parts are packed with boxes. Also can be delivery within 20 days.

 

Q2: How is your service?

A2: With our company we hold our client’s needs as top property. We have first rate professional technology and provide excellent after-sales services.

 

Q3: What is your after sales service?

A3: We provide Preventative Maintenance and After Sales Service. We strongly feel the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer a one year warranty to our customers. .

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Which kind is better, gantry crane or tower crane?
Each has advantages, the use of different conditions, the use of different cranes, tower cranes can not move, but the lifting height can be very high, the door machine has tracks can be vertical and horizontal movements, lifting height, tower crane is not high.
Q:How difficult is white crane boxing?
It dosen't matter if it is hard or not, just practice lots and you will be good it. Training in any martial art will be hard at first and the first few months will be HELL. If you can survive three months of suck you will stay, and after a year you will see major progress in your skill and fitness. I never did kung fu but i did karate, taekwondo, boxing, brazilian jiu jitsu and japanese jiu jitsu so i know stuff about this. when finding an instructor try to find a non profit place, they don't look to steal your money and they teach because the have a passion for their martial art. if you don't have any non profit then find a quality gym. if it looks like **** the that could be the quality of the instruction but watch the classes anyway. if instruction looks good and the students preform well join the gym. you can find a school with google
Q:why is the crane an important invention?
A crane allows us to place light or heavy loads with precession and safety; on top of buildings, across water ways, down mine shafts and over obstacles. Building a pyramid today would be done with cranes, instead of building ramps to slide the massive stone blocks up. Cranes speed up any construction project. Cranes eliminate a lot of manual labor. Cranes prevent injuries by doing the hard work. One example, we used a crane to lift off an entire house roof, in one piece. We then built a second story and then used the crane again to put the roof back on. Without a crane, it would have taken several days to tear off the shingles, remove the roof sheeting and the trusses, not to mention the money saved. The building codes do not allow the reuse of wood trusses, yet not taking the roof apart, allowed use to reuse the trusses, a savings of hundreds of dollars. Wingman
Q:what would you wish for if you had 1000 paper cranes?
I would wish for immortality.
Q:Ever felt like a paper crane?
A thousand paper cranes will grant your wish (or so the legend goes). But a piece of paper can also be used to draw a picture - which is worth a thousand words. Which one do you think I would choose to be?
Q:Where can I find the short story Cranes on the internet?
If okorder.com In the search bar there, select the books category, then type the title of the story into the bar, and click go. You will be linked to the page where you can purchase the book very cheaply -- about $5.00. Also, there is a review of the story describing its plot. Additionally, you can type into the search bar of your computer: short story Sadako and the Thousand Paper Cranes; on the page you receive will be a link to Wikipedia where the plot is explained. If you are looking for a story simply titled Cranes, I was unable to discover that one. Sorry!
Q:What is a tower crane without a collector?
Once again, because the collector is using carbon brush and copper ring contact, the tower crane work in the sway of the impact is too large, easy to cause carbon brush and copper ring arc between burning. Combined with this reason, today's tower cranes do not use collector. The drawback is that the tower crane can not be one-way one-way rotation. So now the use of rotary limiter, set the tower one-way rotation can only turn 540 degrees, want to turn, can only turn in the opposite direction.
Q:I have so many crane flies this spring. Why?
cranes leave their habitat because the first reason was the climate , second its mating season and lastly scarcity of food in their habitat during winter .
Q:airsoft gun crane stock to full stock switcharoo?
Ok, I can help. The first step is to take the crane stock off. To do so, extend the stock fully. Then, take the tab you use to extend it, and instead of pushing up to extend it, pull it down and slide the stock off. It make take some force. Be careful of any wires and that you don't break them! Next: take the buffer tube out. Take a long phillips head screw driver and stick it down the shaft. Remove the screw. The whole tube should come out. Don't lose the screw! Next: Install your stock. Next: Screw the screw back in to secure the stock. Done! Make sure the wires are still ok and that they are not pinched!
Q:How high the tower crane needs to be installed with the wall pole. How is it stipulated in the national standard?
The construction of tower crane installation, operation and dismantling safety technical regulations "(JGJ196-2010) design provisions in article 3.3 attachment device of tower crane: when the tower crane attachment for use, attachment device settings and free height should comply with the provisions of the instructions; when the attachment level distance, attachment spacing does not meet the the instructions should be carried out, design calculation and drawing the map produced and written instructions; the attachment device and embedded parts shall be the original component manufacturer or made with the corresponding ability of the enterprise; the attached device design, the main structure of the building to support the checking.The regulations on the supervision and administration of the safety of building cranes (Ministry of Construction No. 166th) states: "it is prohibited to install the standard sections and attachments of non original manufacturing plants on the free construction lifting machinery.".The independent height of the tower crane is determined by the manufacturer's manual. The independent height of the tower cranes of different manufacturers and different types is different. The installation of the tower crane needs to be installed with a wall rod. The specifications are stipulated in the instruction. The national standard requires the instruction of the manufacturer's manual.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range