• House Prestressed Purlin Forming Machine System 1
  • House Prestressed Purlin Forming Machine System 2
  • House Prestressed Purlin Forming Machine System 3
  • House Prestressed Purlin Forming Machine System 4
House Prestressed Purlin Forming Machine

House Prestressed Purlin Forming Machine

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
5 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

House Prestressed Purlin Forming Machine


1.   Structure of House Prestressed Purlin Forming Machine:


House Prestressed Purlin Forming Machine is our special developed products as results of our engineers research, with which 60%steel material will be saved compared with traditional revolving die method .Efficiency can be improved 3 to 5 times compared with conical die method, these machine are easy for operation and convenient for maintenance, products from these machines are in good quality, smooth appearance and accurate in size.

 

 2.   Main Features of House Prestressed Purlin Forming Machine: 


• One machine can make one slab lower cost, high Wear-resistant, long service life.

• In case of quality problem the company provide free replacement.

• Provide technical support for free.

• Provide consumers with regular visits

• Simple structure, easy operate, less wear parts

 

3.  House Prestressed Purlin Forming Machine Images:

House Prestressed Purlin Forming Machine

House Prestressed Purlin Forming Machine


House Prestressed Purlin Forming Machine

 

4.  House Prestressed Purlin Forming Machine Specification:

 

Product name

Type

Productivity

Hole number

Concrete purline  machine

60*120*140*

1.3-1.5m/min

4

Concrete purline  machine

60*130*150*4

1.3-1.5m/min

4

Concrete purline  machine

60*140*160*4

1.3-1.5m/min

4

Concrete purline  machine

70*150*170*2

1.3-1.5m/min

2

Concrete purline  machine

80*160*180*2

1.3-1.5m/min

2

Concrete purline  machine

60*110*130*4

1.3-1.5m/min

4

  

Production Process


Rebar tensioning

House Prestressed Purlin Forming Machine

Raw materials preparing

House Prestressed Purlin Forming Machine

Molding

House Prestressed Purlin Forming Machine

Certificates


House Prestressed Purlin Forming Machine


5. Packing & Delivery


•  Wire cables are used for fastening the machine on the trailer or inside the container.

•  Machine covered with plastic film.

•  Machines can be packed in tarpaulin or wooden case according to customer’s needs.


House Prestressed Purlin Forming Machine


6. FAQ:


We have organized several common questions for our clients, may help you sincerely:

•  What information we need to confirm with you before send a formal offer?

What kind of slab you want to make, wall panel, roof panel, lintel or something else?

Do you have exact slab size (slab thickness and width)? If not, please tell us the slab span, we will give you suggestion.

•  Have you use this kind of machine before? 

Our machine is totally different from European machine. Please don’t follow their instructions.

•  How long can we receive the product after purchase?

In the purchase of product, within 20 working days we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 35 working days can be served.

 

7. Why choose us:


•  30 years manufacturing experience.

•  Constitutor of the.

•  More than 10 patents.

•  Passed ISO9001:2000 quality system certificate.

• More than 10 types of machine and over 100 models for choose.

Supply complete set of technology and equipment solution.

• We can design and manufacture all kinds of concrete forming equipment according to customers' demands. Meanwhile we can even more provide our customers a complete set of technology and solution for all producing flow.


8. Our Service:


•  We supply the technical supporting all the time.

•  We supply one year warranty for whole machine.

•  We supply free quick wear parts. 

•  We supply low charge continue maintenance when warranty is expired.

•  We supply free training to end-users

 

 


Q:What was the last thing that prevented you from driving or operating heavy machinery?
A broken foot stopped me from driving for some weeks.
Q:I know the basics - clear cut the trees, put explosives in the mountains, blow the mountain up, separate coal from waste, fill up valleys and then plant some grass. What I want to know if more about the machinery used - some sites talk about a quot;dragline,quot; but don't have any more info than quot;it is used in MTRquot; What kind of explosives are used? How do they gather/separate the coal from the mining waste?
Draglines okorder /
Q:please explain at 1 or 2...or 3. no current experiment please like knockout mice.
1. Griffith: injected mice with R cells mixed with dead S cells to prove bacteria can transform 2. Hershey Chase: used radioactive sulfur and phosphorous to mark proteins and DNA. injected bacteriophages in e li cell and found phosphorous entered cell, proving DNA is genetic material.
Q:Does anyone know of any cnc machinery apprentice programs in michigan?
Focus Hope has an awesome program. The first five weeks are free to see if you like it. I know ppl there now. I have passed all the entrance stuff and start in the fall. www.focushope.edu/education/mti.htm
Q:I just wanna know how much sea duty will they get and how much shore duty will they get? Is there a possibilty that they can get more shore duty? And yes i know i know when you are in the navy you're going to be on the sea thank you i heard that so many times lol!!!! But any answers will be great!!Thank you all and god bless
The biggest difference is that the Navy Reserve generally work 1 weekend a month and 2 weeks a year with the Navy. Active duty Navy is on duty 24/7. There are some reservists that serve with the active duty Navy full time, mostly these are officers. This is done due to the limited amount of active duty officers the USN can have at one time and Reservists do not count towards this limit. You will see them listed as USN(R)
Q:What would happen if machinery is sold for less than book value?
You record a loss: Say you sell PPE for $5 but book value is $13 (say you bought it for $20 and have accumulated depreciation of $7). You would record: Cash $5 Acc Dep $7 ______Loss on Sale of PPE $8 ______PPE $20 This loss decreases your net income and also shows up as an add-back in your statement of cash flows from operations.
Q:How long would it take a farmer to harvest crops in a 1 mile radius with out machinery?
It depends on what crop you have in mind. With a scythe a farmer can harvest hay or grain quite rapidly. Indeed, that was the way it was done for many many years. If he was digging potatoes or picking strawberries it would take a bit longer.
Q:What is the best way to develop abs quickly without using any machinery?
lose all your belly fat and then do abs and leg raises
Q:Why won't the machinery implement an optic pie?
mmmmm pie
Q:technical feasibility study for a theme parkabout machineriesand equipment
How about what it will take a rollercoster that is fun and safe?

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords