Excavator CE 15ton with Isuzu Engine
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Excavator CE 15ton with Isuzu Engine
Product Details
Basic Info.
Model NO.:w2150
Type:Crawler Excavator
Usage:GM Excavator
Transmission:Hydraulic Transmission
Drive Type:Internal Combustion Drive
Bucket Capacity:0.5~1.0m³
Size:Medium-Sized
Certification:CE, ISO9001: 2000
Condition:New
CE Standard Excavator:Hydraulic Excavator
Operation Weight:13600kg
Engine Power:100HP
Engine Brand:Isuzu
Hydraulic Pump:Kawasaki
Main Valve:Parker
Cabin:Air Conditioned
Export Markets:Global
Additional Info.
Trademark:WORLD
Packing:Roro
Standard:ISO CE
Origin:China
HS Code:84295212
Production Capacity:5000PCS/Year
Product Description
Ce standard Excavator
W2150 is a 15ton middle size excavator with 0.53 cubic meters bucket. The excavator adopts the original ISUZU BB-4BG1TRP engine which can supply 72.7kw power at the rated speed of 2200rpm. Automatic idle speed prevents unnecessary fuel consumption. The well known Kawasaki brand hydraulic pump supplies larger displacement to ensure the excavator stronger power and higher efficiency. Parker brand valve, Doosan brand travel motor and Sungbo brand swing motor match the pump perfectly. It is really a economic machine with high quality. It was widely used in urban construction and building.
Specifications:
Engine System | |
Brand & Origin | ISUZU(Japan) |
Model | BB-4BG1TRP |
Rated Power | 72.7/2200 kw/rpm |
Max. Torque | 337.6/1600 Nm/rpm |
Idling Speed | 1000rpm |
Engine Displacement | 4.329 L |
Cylinder No./-BorexStroke | 4-105mmx125mm |
Engine Oil Capacity | 13.2L |
Fuel Tank Capacity | 240L |
Fuel Consumption Rate | 240 g/kw.h or less |
Working Specifications | |
Operating weight | 13600(Kg) |
Bucket capacity | 0.53(m3) |
Max. breakout force | |
(1)Bucket digging force | 91.8(KN) |
(2)Arm digging force | 65.3(KN) |
Max. digging height | 8640(mm) |
Max. dumping clearance | 6139(mm) |
Max. digging depth | 5532(mm) |
Max. vertical wall digging depth | 5102(mm) |
Max. digging reach | 8330(mm) |
Min. front swing radius | 2500(mm) |
Max. pulling force | 113(kN) |
Max.travel speed(double modes) | 3.1/5.3(km/h) |
Max. grade ability | 70% |
Overall dimensions | |
Length(with bucket on ground) | 8330(mm) |
Width | 2490(mm) |
Bucket width | 854(mm) |
Ground length (in transportation) | 7718(mm) |
Height(To the top of the boom) | 2800(mm) |
Height(To the top of the cab) | 2705(mm) |
Counter weight ground clearance | 885(mm) |
Track gauge | 1990(mm) |
Tail swing radius | 2380(mm) |
Min. ground clearance | 392(mm) |
Rotating platform width | 2490(mm) |
Counter weight height | 930(mm) |
Crawler teeth thickness | 25(mm) |
Reach from swing center to tail | 2380(mm) |
Crawler ground length | 2840(mm) |
Standard arm length | 3132(mm) |
overall length of crawler | 7525(mm) |
- Q:I remember I read from somewhere you can't use though and then finish with because in a sentence.
- Ehh, I'd have to see the sentence. Shooting from the hip, it doesn't sound right. I didn't really need these two points but I wanted to see what you were asking. As I said on scratch paper which I keep by the computer, it doesn't look right but that's just a scribble to eyeball it. You might be able to use although. Like, Although most people are complaining about rising gas prices, it is because they don't maintenance their cars at the recommended intervals and lose mileage. See that's borderline. So you need a sentence. Now that I've typed and scribbled, yes I should get the two points.
- Q:Hi does anyone knows how is a wheeled excavator steered? Is it a mechanical steering like other wheel loaders. Seems impossible because the excavator cab can do 180 about the undercarriage. I thought it must be hydraulically operated or skid steered, but my CAD teacher asked it to mechanically couple the wheels with the steering wheel. Haven't been able to figure out as to how to do it yet. Any suggestions?
- Often times they articulate in the middle. In other words the vehicle is actually 2 half's. Each half joined in the middle,hydraulics actuating the articulation, thereby steering the vehicle.
- Q:everyone says that if you open 6 first it will excavate it before the other ones. i always open excavator 6 1st but the excavator nevers turns on or it does #11. plz help
- Where the excavator breaches is largely based on luck, but it is more likely that it will breach tunnels you have opened already. I have also found that opening to the power room at round one will cause the excavator to breach at round one sometimes. Hope this helps!
- Q:I was just curious how this would be done. I mean some people have ponds that are 4 acres or more on their property and I was wondering how that is achieved. I mean it's not like they dig a hole in an afternoon, grab their garden hose and let it fill up. Also how much would such a thing cost?
- Well basically yes. You hire a 20 ton excavator for a couple of days and dig a big hole. Of course that might cost $100 an hour... More likely they find a natural hollow or channel and build a dam across it. Might only need to be 6 ft high to dam up quite a big area thats 2 to 5 ft deep. It can get more technical depending on the soil structure, and the level of your water table, but with our local terrain and volcanic soil structure I could give you a 4 acre pond in an hour with a decent excavator. Ian
- Q:How about Carter excavator model?
- will be different. In 320D, for example, there are 2.5 and 2.9, two commonly used bucket (small arm) can be selected, bucket in the country with 1 and 1.2 more, and at the same time with heavy bucket, rock bucket, heavy rock bucket is more common. Special conditions can be selected to widen track, guard board, cab protection device, low temperature starting device and so on. Basically, most of the working conditions can be well matched.
- Q:What is the weight of the 8O excavator?
- Close to 8 tons.Now the type of excavator (except Carter, Kubota), other excavators model size, it means that the tonnage of the excavator.For instance:60 excavator: weight approaching 6 tons80 excavator: weight approaching 8 tons90 excavator: weight approaching 9 tons150 excavator: weight approaching 15 tons200 excavator: weight approaching 20 tons
- Q:How interested are you in the following hydraulic excavator improvements? ?Ability to Measure Machine Productivity (Payload, Cycles) ?On Machine Operator Coaching/Assistance ?Machine Protection Improvements ?Machine Security Improvements
- Whoever wrote that meant in, not on. So that choice reads: How interested are you in machine operator coaching/assistance. Hope that helps.
- Q:I scrapped the goodies out of a house while an excavator was demolishing it. Dusty work.
- bir ekskavat?r onu y?kan ederken ben bir evin goodies d??ar? hurdaya. Tozlu ?al???r.
- Q:I currently live in Ireland and drive a digger and I am going to Australia on a working Visa and wanted to find out how I would go about getting a ticket to drive one there
- A recent ad for a course, I saw it for about $A2500 which is roughly 1500 Euro. If you are being sponsored see if your employer will pay for one, it could be cheaper for them.
- Q:our company is badly in need of bucket teeth, good quality,competitive price.
- I work part time as a heavy equipment operator for my families construction buisness and we have tried a couple buckets but we never had luck with them the only buckets we use now are hensley buckets.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Excavator CE 15ton with Isuzu Engine
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords