Tower Crane TC6014 Construction Equipment Building Machinery Distributor Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC6014 Description:
1.CMAX Tower Crane TC6014 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC6014 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC6014has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC6014 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC6014 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC6014 Parameter:
Max. working range 60m, tip lifting weight 1.4T and Max. lifting weight 8T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 46
Max height with attachment (m) 138
Working range can be adjusted (m) 48、54、60
Min working range (m) 2.5
Max lifting capacity (t) 8
Tip load @ 50m (t) 1.4
Tower Crane TC6014 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC6014 Diagram:
Tower Crane TC6014 Technical Sheet:
Tower Crane TC6014 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC6014 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “14” means the tip load is :1.4 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q:Tower crane driver simulation exam which website?
- This also needs to imitate exam? When you go to the training, the teacher will read the outline.
- Q:I don't really believe that the wish will be granted.Anyways I've really been into Origami and I remember reading in my Heroes book (slash the show) that a certain number of cranes means a wish. But before I start making all these cranes, I want to know if it's 100 or 1,000.So if you haven't gotten it in your head yet the question is:Is it 100 or 1,000 cranes to get a wish
- 1000 Cranes Wish
- Q:crane signals?
- There are hand signals which are used by men not operating a larger crane for hoisting,lowering,stopping, holding and slow. There are more but you would get a better idea in the link below. Scroll to pictures. 2nd link is a place to purchase placards or magnetic backed visuals.
- Q:I just seen pics of a crane fly and not sure if I see crane flies in my house or mosquitos now. And do crane flies bite?
- Really easy: A crane fly has no long piercing mouthpart: they feed mainly on nectar Female mosquitos have long piercing mouthparts, males are smaller and have shorter mouthparts for sucking nectar from flowers. Common crane flies are almost always bigger than a mosquitos.
- Q:Do they come all the way down?
- They are Union workers, so they never work more than 10 minutes a day, so it really is no problem.
- Q:You know those big cranes that sometimes hang above constructed buildings. I usually thought a crane is used to build that crane but then how is that first crane that built the crane get there in the first place?
- from the ground up
- Q:Ever since a few weeks ago, these retarded giant mosquitos thingys keep on flying into my house from somewhere and they always come into my office and bother me, so im wondering what month they come and what month they leave?
- Crane flies tend to live in wooded areas and open fields, but they can live nearly anywhere, including snowy northern climates and desert lands. In order for their eggs to hatch and larvae to grow into adults, they require either water or damp, decaying material in which to lay their eggs, depending on the species. Crane fly larvae and pupae can be found in damp sod or compost piles, or under the decomposing leaves on the banks of rivers, streams, ponds or lakes. Crane fly larvae and pupae feed on decomposing material, grass and the roots of many plants. This makes them a beneficial insect, as they assist in the cycle of decomposition. Once they emerge in late winter or early spring as adults, after maturing over the winter, their primary purpose is to mate and lay eggs.
- Q:What should i do to solve tower crane collapse?
- i couldn't figure it out either. try the castle catapult instead.
- Q:How do you jump a crane? I know you jack it up but how is that done?
- I have no idea what you mean by jump a crane? What type of crane? Truck mounted, overhead, pedestal?
- Q:Is there an effective utility for estimating the required size of a crane? I’m an estimator for a mechanical contractor, and it seems we never allow enough money for crane rental. How can I effectively adjust my estimates?
- The only effective way to estimate the size of a crane when needed is to know, without a doubt the weight of the heaviest thing that you have to lift, and allow at least a 20% margin for safety. This is standard practice in building bridges, in particular - the weight of EVERYTHING is clearly marked, or just generally known. If there are bridge segments to load on a barge, for example and the heaviest segments are 220 tons, then a 300 ton crane is used. Always err on the side of safety.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane TC6014 Construction Equipment Building Machinery Distributor Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords