Tower Crane TC5613 Construction Equioment Building Machinery

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC5613 Description:

1.CMAX Tower Crane TC5613  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC5613  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC5613 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC5613  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC5613  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC5613  Parameter:

 Max. working range 56m, tip lifting weight 1.3T and Max. lifting weight 8T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 46

Max height with attachment (m) 150(200)

Working range can be adjusted (m) 44、50、56

Min working range (m) 2.5

Max lifting capacity (t) 8

Tip load @ 50m (t) 1.3 


Tower Crane TC5613   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC5613 Diagram:

Tower Crane TC5613 Construction Equioment Building Machinery

Tower Crane TC5613 Construction Equioment Building Machinery

Tower Crane TC5613 Technical Sheet:

Tower Crane TC5613 Construction Equioment Building Machinery

Tower Crane TC5613 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC5613 for example, the first two letters “TC” means Tower Crane, “56”means jib length is 56meter, and the last two letter “13” means the tip load is :1.3 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to subdue an injured crane?
Thow a blanket over the entire bird, beak and all, and push it to the ground, making sure the beak does not come out. Tuck the feet and legs underneath the bird through the blanket, and grasp the neck through it. Then pick up the birds body in the blanket (carefully, because it has to move its chest to breathe) and place it in an appropriate sized plastic animal carrier or large cardboard box with a lid. That is how you transport a crane to anywhere. You MUST control the head because he will gladly put your eye out with his beak.
Q:it says theres cranes bill in my primer???!!!?
Omg! What primer is it? That sounds really fishy...
Q:How do you kill crane flies? ew i hate them so much?
This Site Might Help You. RE: How do you kill crane flies? ew i hate them so much? They like fly on peoples face, i dont know why they come up on the face and it creeps me out, i have no idea why it comes inside of the house in the first place?
Q:what is the ground bearing capacity required for a crane weighing 300t 100t lift.?
This depends on the angle of the lift and the distance away from centre of the crane. With the lift at tipping range all 400t will be distributed along the outer half of the pad or on the extreme legs. Rule of thumb is all the load is placed under the one pad. so one pad is 9 sq metres and the load is 400 tonnes so the bearing capacity must exceeds 400/9 tonnes per square metre. 44.44444t/m^2
Q:Chinese poems about Mandarin ducks or cranes?
this one is about cranes We thought they were gulls at first, while they were distant- The two cranes flying out of a natural morning, They circled twice about our house and sank, Their long legs drooping, down over the wood. We saw their wings flash white, Frayed at the black tip, And heard their harsh cry, like a rusty screw.
Q:Effects of whooping crane?
There would be no more whooping cranes for one thing. There would be a gap in the food chain and whet ever feeds off of them could go extinct if they have to have them. What ever the cranes ate might over breed if not held in check and if they are harmful might cause an epidemic that could upset the balance of power in the ecosystem of Florida. All this is speculation but anytime any species disappears it is gone forever and anything can happen.
Q:Is Fireplace Crane a modern term for the swing-out metal arms that hang over a fireplace...?
Apparently that IS what they were called. Who knew? I would have guessed something a little more poetic like Dragon's Tail because it's long and straight, swings on a pivot and frequently has notches along to top for latching the bails of cooking pots and the like. Crane sounds so... so... ordinary.
Q:Notice of tower crane
Please refer to the technical regulations for the safety of installation, disassembly and use of tower cranes in construction;The following is copy:3 installation of tower cranes3.1 conditions for installation of tower cranes3.1.1 tower crane installation unit must have the construction administrative departments issued the contracted professional qualification and heavy equipment installation engineering construction enterprises safety production license. Tower crane installation units must be engaged in the installation of tower cranes within the scope of qualification permit.In addition to the professional and technical personnel who have the qualification standard, the installation units of 3.1.2 tower cranes shall also have professional personnel who are in line with the project. The person in charge of the project, the project manager and the full-time safety management personnel shall have the certificate of safety production inspection. Tower cranes, installers, electricians, drivers, signal engineers, cable operators should have special construction operation qualification certificates.3.1.3 construction units shall sign professional contract for installation engineering with the installation units, and make clear the responsibility of both sides for safety in production. In case of general contracting of construction, it shall be signed by the general contractor and the installation unit.
Q:Tower crane technical condition GB/T 9462-1999 has been cancelled? If so, what is the new standard?
This standard applies to tower cranes defined in GB/T 6974.3.This standard does not apply to mobile cranes equipped with tower cranes. This standard compares with the 5 standards such as GB/T 9462-1999, the main change is as follows:- redefining the type identification principle of tower cranes and eliminating the parameter series in JG/T 5037-1993;
Q:How crane can hold huge counter weights? Why CG is not changing while adding counter weight on cranes?
Usually the counterweights can move back and forth on an arm. They are moved toward the crane when there is no load and away from the crane when there is a load. If the counterweights can't move, then the crane must be designed to hold (at least) the minimum counterweights in their fixed location. As the crane gets loaded, the net moment decreases, and then increases in the other direction as more and more load gets added. It is still likely that the maximum design moment when loaded far exceeds the moment due to the counterweights on an unloaded crane.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range