• steel scaffolding frames/portable scafolding/adjustable work System 1
steel scaffolding frames/portable scafolding/adjustable work

steel scaffolding frames/portable scafolding/adjustable work

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Reliable performance
2. Corrosion resistance
3. Durable finish standards

 

 

Size

(more customized size available)

Length(mm)

Width(mm)

Thickness(mm)

1930

1219

2/2.2

1700

1219

2/2.2

1524

1219

2/2.2

1700

914

2/2.2

Material

Q235 carbon steel

Surface treatment

Hot Dip Galvanized(HDG); cold galvanized; powder coated; dip painted

Color

Orange, dark red, blue, or as you required

Welding technique

CO2 arc Welding

Certification

SGS;EN12810

MOQ(Minimum Order Quantity)

1x20ft container

Payment

T/T

Delivery time

20days after deposit

Package

Without outer packing or as you required

Production capacity

50 tons for each day

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Q:What are the special construction proposals for the construction project?
In order to prevent the occurrence of production safety accidents at the construction site, improve the emergency working mechanism, in the event of the project accident, the rapid and orderly emergency rescue work to carry out the accident, rescue the rescue project The wounded, reduce the loss of the accident, the development of this plan
Q:How far should the tower crane be from the outer wall?
1: it is best not to use this, this program in the construction, curing, use, life will bring a lot of problems. 2: hanging net and plaster is formalism, is not considered the consequences. 3: If you want to use tiles to decorate the wall, especially the sandwich panels, the size of the use of small. I have seen a tile wholesale owner home decoration, the 800X800 cut into 800X200 with, it seems good results.
Q:Rt, 3ks, as far as possible Please ask questions: is the construction site, there are other sites? More
As the external scaffolding (including the bridge scaffolding and the basket) to withstand the limited load capacity is limited, so generally do not use the tower directly to the outer scaffolding supply; when the use of its supply, the need to take specific conditions, respectively, the following measures: (2 to 3 layers, with tower crane installation); 2) the use of small groups of small containers, the overall lifting of the lifting of the body , Respectively, to the operating site; 3) in the scaffold set on the small hopper (need to add appropriate support), the mortar were unloaded in a small hopper When using other vertical transport facilities, trolleys (tricycles, two-wheelers and all kinds of special trolleys) are generally used for horizontal transport Its carrying capacity depends on the number of cars can be loaded at the same time as a unit of time to enhance the number of times Installation conditions The location of the vertical installation shall be fitted with suitable installation conditions, such as a reliable foundation, structural ties and horizontal transport conditions equipment performance must be considered to meet the construction needs and give full play to the effectiveness of equipment When the vertical phase of the construction phase of the phase difference between the poor, should be set up and adjust the vertical transport equipment in phases, the timely removal of equipment has been unnecessary the full use of equipment to make full use of existing equipment, if necessary, the acquisition or processing of new equipment The prospects for future use should be taken into account when acquiring or processing new equipment The use of equipment should be considered in the use of Bi after the change can be used
Q:What kind of scaffolding is the building divided into? Where to use it as
Now the framework of the roof approach is the case, should be classified as traditional practices.
Q:March 20 Beijing-Zhuhai high-speed explosion, occupying the emergency lane of the car all the firefighters with forklift shovel high-speed, insurance does not lose money.
Ice in the water like the food market has seen a lot of frozen fish should not be expensive
Q:My family bought a, introduced under the performance, with the same comparison, better ...! More
rice husk: rice husk loose loose material, wide origin, easy to local materials, cheap, and has a good thermal insulation properties
Q:Wanzhou District housing notarized brick structure is how much money per square meter
Is the set of quotas, there will be poor material adjustment. Now this process is generally not set quota. Both sides follow the market to discuss the price
Q:What is the maximum lifting capacity of the tower crane What is the maximum weight of the tower crane?
The position of the two adjacent rods should be staggered, should not be set in the synchronization, the synchronization of a vertical separation of the two joints in the height of the side of the length of the function of the population can not be less than 0
Q:Why is all the civil safety information, there is no special decoration safety information? More
Test thermal conductivity is generally chosen to test the heat flow meter
Q:What is a new construction technology, new technical information
I think you can not send a copy of the top of the usurpation of a single person who would like to give you a water, to Google search, you can say that you can not think of, there is no there. If you do not understand Hi me.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords