Waterproof Recycling Low Labour Cost Climbing Formwork System CB210

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Waterproof Recycling Low Labour Cost Climbing Formwork System CB210


Waterproof Recycling Low Labour Cost Climbing Formwork System CB210


CB210 has main platform with width 2100mm, compare with CB240, it will be cost effective in some condition.

CB210 climbing system is mainly used for concrete pouring in the wall and the core wall. They guarantee simple handling, fast concreting cycles and problem-free adjustment to different wall configurations.


Competitive Advantage:

1. High bearing capacity

The high loading capacity of the brackets allow very large scaffold units. This saves the number anchor points required as well as reducing climbing times.

2.Simple moving procedure by crane
Through the strong connection of formwork together with the climbing scaffold, both can be moved as a single climbing unit by crane. Thus valuable time-savings can be achieved.

3. Fast striking process without a crane
With the retrusive set, large formwork elements can also be retracted quickly and a minimum of effort.

4. Safe with work platform
The platforms have assembled firmly with bracket and will be climbing together, without scaffolding but can work safely in spite of your high location.

5. The inclination of formwork is adjustable by means of adjustable brace.

The brace is connected with formwork and bracket and the main function is guaranteeing the verticality of formwork by adjusting its length.

Applications:


Waterproof Recycling Low Labour Cost Climbing Formwork System CB210

Waterproof Recycling Low Labour Cost Climbing Formwork System CB210


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is a new construction technology, new technical information
EPS expansion polystyrene board: is a volatile liquid blowing agent containing polystyrene (eps) beads, preheated by heating after the mold in the mold, with fine closed-cell structure characteristics The difference between the two is: First, the extruded plate than the polystyrene board thermal conductivity is low In the selection of thickness than polystyrene board has a great advantage Second, the extruded plate than the polystyrene board compressive strength or high compressive strength, so the extruded board commonly used with the roof insulation and basement and floor insulation Third, the squeeze Danan liver test Philippine surprised ten super-ginger than polystyrene board of the shortcomings are: density, compact structure, brittle, airtight, and the surface is smooth, without interface treatment, difference
Q:I am in urgent need of emergency contingency plans
What are the sub-items of the general project that should be prepared for the special safety program? What should be included in the special programming? The best risk of the preparation of the following: the following dangerous part of the sub-projects and temporary electricity equipment in 5 and above or the total capacity of equipment in the 50kW and above the construction site of temporary electricity construction, the construction unit should prepare a special program The Excavation works of earth and rock
Q:What kind of scaffolding is the building divided into? Where to use it
Now the framework of the roof approach is the case, should be classified as traditional practices.
Q:High price seeking truth! ... capacitive BCD-232M refrigerator price ... who answered, I asked him to breathe oxygen ...!
First of all you have to see what you are learning, want to learn anything, no matter what the most basic three views, and the operation is ordered Ding Dan Chi stalk 佾 flying when the twitch is the same, this you can next CAD tutorial learn
Q:Construction safety inspection standards (JGJ59-2011) a total of several inspection items, respectively, what
The actual score of each item in the checklist should be calculated as follows: A1 = B * C / 100 where: A1 - the summary table is the actual score of the sub-item; B- Full score; C-check the score score.
Q:Construction safety management system should be clearly defined what the content
We first come to understand what is the scaffolding is what
Q:Will the door scaffolding norms who knows ah? Can you teach me?
559 Lightning protection In order to avoid the lightning protection, the main structure of the tower crane, the motor base and the metal shell of all electrical equipment, the metal protection tube of the wire should be reliably grounded and its grounding The resistance should not be greater than 4Ω
Q:Brief description of what is the danger source of the squad leader
Scaffolding in the structure, vertical and horizontal vertical scissors, even wall pieces, horizontal scissors support, vertical pole, horizontal spacing, horizontal bar step, steel pipe connection, fasteners, pole base, vertical, sweeping the ground, etc , JGJ130-2011 "construction of fasteners steel scaffold safety technical specifications" on the complete provisions In addition to meet the structural requirements, the calculation of the body of the frame must meet the requirements
Q:What is the difference between the inside and outside of the car
First, the basic structure of the wall system: the basic structure of the basic wall system ① adhesive layer ② insulation layer ③ fixed ④ ​​protective layer ⑤ decorative layer ⑤ reinforced concrete wall concrete hollow block clay clay porous brick wall clay brick wall Gas concrete wall base wall should be consistent with national standards; Pleasant Hercules adhesive mixture, coated plate thickness of 5mm-7mm, depending on the wall flatness, and the wall paste thickness of 2mm-4mm; Plastic polystyrene insulation board or foam polystyrene insulation board
Q:What are the main points in the inspection of building safety data?
Better with styrofoam, that is, can be insulated and heat.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range