Steel Profile Drywall Track & Stud from China

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
10000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


Drywall Metal Profile

 Drywall ceiling Channel is galvanized metal structure  used in non-bearing partition systerm .

Drywall steel frame system is a popular way to be used to divide the space,especially using in commercial buildings.

HUILON Drywall Steel Frame System is made of galvanized steel sheet with good rust-Proof function.A variety of frames are ready for customers' demands and designers' choice for different purposes and places. One of our merits is the special hole for channel on C-stud in per 6Ocm which is easy for workers to install the electric lines and water tubes.CH and IH type of studs are the special type we developed to solve the hard work situation in elevator ventilator and offer a better protection of workers' safety.

Our dry wall steel frames are covered with HUILON magnesium fireproof boards and fulfilled with material which is heat insulation and noise-proof mineral wool between two layers of boards. It will create a better living environment than the traditional building materials.

Suspension ceiling structure,Galvanized metal structure which is the vertical metal framework used in non-bearing partition system.


Specification for middle east:

Main Channel

38x12 mm

Furring Channel

68x35x22 mm

Wall angle

25x25 mm

C stud

50x35 mm

C Stud

70x35 mm

C stud 

75x35 mm

U track 

52x25 mm

U track 

72x25 mm

U track  

75x25 mm


 Specification to Australia:

top cross rail

25x21x0.75 mm

25x21x0.75 mm

Furring Channel

28x38x0.55 mm

16x38x0.55 mm

Furring Channel track

28x20x30x0.55 mm

16x20x30x0.55 mm


64x33.5x35.5 mm

76x33.5x35.5x0.55 mm


92x33.5x35.5x0.55 mm

150x33.5x35.5x0.55 mm


51x32x32, 64x32x32x0.55 mm

76x32x32x0.55 mm


92x32x32x0.55 mm


Specification to Europe, Russia, UKrain, Georgia. etc

C Stud

60x27 mm

U track

28x27 mm

C stud

50x50 mm

C stud

75x50 mm

C stud

100x50 mm

U track


U track

75x40 mm

U track

100x40 mm


Trade Shows


Main Markets:

15.60% Southeast Asia

13.2% Eastern Europe

12.3% Eastern Asia

12.00% North America

11.80% Mid East

10.8% Africa

9.50% South America

7.60% Oceania

6.70% Western Europe

Total Annual Sales Volume:

US$10 Million - US$50 Million

Export Percentage

51% - 60%

 Advantages and features:

1. Galvanized Steel Profiles raw material is high quality hot dipped zinc galvanized steel strip, absolute damp proof , heat insulation and high durability , high rust resistance.

2. Hot dipped zinc galvanized steel strip zinc coating is 60-180g/m2.

3.Warm sales in Middle East , Africa , Australia, Malaysia ,and America , which have enjoyed an excellent reputation with high quality and services.

4. The specification can follow up customer requirements.

5. Advanced equipment can make sure exactly size, high quality products.

6.High quality cold rolled continuous hot galvanized plate as raw materials which makes sure it is anti-corrupt and anti-rusty

7.drywall steel profile adopts excellent manufacture equipment,advanced production process, scientific and detecting method.                

 8. Steel profile has beautiful surface, medium hardness! Good quality *competitive price large quantity *honesty *good after-service

Certificates  ISO 9001:2000 Quality management system


Product Show


Steel Profile Drywall Track & Stud from China

Steel Profile Drywall Track & Stud from China

Steel Profile Drywall Track & Stud from China



1.Sample: small sample can be offered by free

2.OEM: OEM is accepted

3.MOQ: small order is ok

4.Test: any third party is accepted to test

5.Factory: Can visit factory any time

6.Delivery Time: small order is within 7days or according to your order




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Gypsum board wall above the good paint glass?
Gypsum board partition wall construction operation process: (1) According to the design drawings, in the already done walls, floors, the ground release off the line, the door hole edge. (2) according to the design drawings and the actual size, with a wheel cutting machine cutting keel and classified stacking. (3) according to the line has been put away and the door edge, with nails or expansion bolts to the ground keel fixed on the ground floor, nail or expansion bolt spacing 600mm. The top of the keel into the wall of the reserved hole 100mm, and then use cement mortar packing fixed, or with nails, expansion bolts to the end of the handle along the top keel fixed to the wall. (4) According to the cut line and the edge of the door, according to the size of the file size layout, painted in the edge, along the top keel, less than the modulus should be placed in the partition with the wall at the first board. (5) According to the document mark will be cut in advance of the length of the vertical keel in turn inserted along the edge, along the top keel groove, the flange towards the direction of the proposed panel to be installed. Adjust the vertical, positioning accuracy, with rivets fixed. The vertical keel on the wall is fixed to the wall with a nail or expansion bolt, and the distance between the nail or the expansion bolt is 1m. (6) the installation of doors and windows to strengthen the installation of the keel: the first installation of the hole on both sides of the vertical reinforcement keel, and then install the hole up and down to strengthen the keel, and finally install the big hole on both sides of the upper and lower reinforcement keel and bracing. (7) Install the cross brace and support card. The vertical keel fastened, so that the entire partition keel has sufficient strength and stiffness.
Q:Light steel keel gypsum board partition design should pay attention to what the problem
In order to be able to make decoration more perfect, it is recommended that you choose the decoration manufacturers, to be careful, we must choose the same brand of all products. The
Q:Light steel keel + gypsum board wall and other wall joints how to strengthen?
Are generally used to deal with the patch to prevent the brush at the brushing of latex paint, keel and wall connection more than a few nail fixed
Q:Light steel keel wall can be installed sliding door
Can press, but the wall material is not good, no, can pull the wall bad
Q:How to remove the gypsum board cut off
Partition may be a metal structure, can not be sparks in the environment, can not use cutting machine, can not use metal hit metal. Can not use the fire.
Q:I would like to have a toilet in the house, bathroom with mineral wool board cut off or light steel keel gypsum board line?
These two estimates are problematic, you can use light steel keel cement pressure plate nail steel wire mesh paint, do waterproof post-paste wall tiles, the following also do waterstops
Q:Lightweight wallboard light steel keel how to construction
Wood keel installation to keel cross-sectional area and vertical and horizontal spacing should meet the design requirements, lightweight partition plate skeleton horizontal, vertical keel should be used to open half a tenon plus glue, plus nail connection. Before installing the panel, the keel should be fire-treated, the wall should be in accordance with the design requirements, along the ground, the wall top wall and the width of the wall line, the width of the wall should be consistent with the thickness of the wall should be clear, Accurate, the installation of vertical keel should be vertical, keel spacing should meet the design requirements.
Q:100 square light steel keel wall how many pieces of heaven and earth keel
Heaven and earth keel accurately depends on the length of the wall, the dragon than the dragon multi-hole size. Usually can be doubled the length of the wall to remove the door. Vertical spacing is usually 400, the door has to strengthen the vertical keel, wearing a keel to see the height of the wall, you can 1, but also two. Depending on the specific design. If the height of 3m, heaven and earth keel to 67m-several door size.
Q:Light steel keel wall cheap or cheap red brick
Now steel is more expensive! Red brick a 4 corner 2 points! It's cheaper to look at yourself!
Q:Wood keel can be used to ceiling, can be used to do the wall? Light steel keel can be used in what place?
Wood keel is best used, one is poor fire, the second is easy to produce pests, and now the ceiling are gradually replaced by light steel keel keel.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range