Product Description:

Steel Coupler Rebar Scaffolding Tube High Quality

1.Description of Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube:

Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required. 

The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.

The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.

Steel Coupler Rebar Steel Tube as High Quality

Steel Coupler Rebar Steel Tube as High Quality

2.Advantages of Steel Coupler Rebar Lift Scaffolding Galvanized Scaffolding Tube: 

Advantages of Cut and Bend Services

Rebars are cut and bent to exact specifications, ensuring precision and consistency.

Cut and bend reinforcement bars do conform to BS 8666.

Material wastage is controlled and reduced.

Lesser on-site labour is required.

Better utilisation of on-site space, logistics and reduction of inventory on-site.

In-house processes and procedures that ensure traceability down to the order level

Weather independent

The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.

3.Available sizes of Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube:



Delivery Term: FOB / CFR / CIF available.

Delivery Time: 15 days or less after order confirmed.

5.Why choose us?

Technical Expertise

Experienced Management

Stringent Quality Control

Exemplary Service

On-Time Delivery

Wide Product Range

Competitive Pricing

Huge branch network capable of catering worldwide


Why Us?

We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the main safety problems when dismantling the scaffold
1, all the rods and fasteners in the demolition of the separation, not on the rod attached fasteners or two rods connected to the ground.2, all the feet of the hand, should be erected from the outside of the handle, in order to prevent the feet and garbage from falling.
Q:scaffold, where to buy?
heres there are many different sizes and kinds of scaffolding , buy what best suits your needs...
Q:Can I get an industrial/scaffold piercing pierced with 2 separate bars?
Yep, some piercers prefer to do it that way. Just make sure you let them know that that's what you want when you go into the shop and they can accommodate you. No cartilage piercing is healed enough to remove in 6 weeks. Cartilage piercings can take anywhere from 6-12 MONTHS to fully heal.
Q:Exterior wall scaffold construction plan?
Vertical pole:Double row scaffolding pole, pole top high eaves 1.5m structure. Single tube base for vertical rod bottom. The vertical rod joint is connected with a butt fastener, and the vertical rod and the large cross bar are connected by a right angle fastener. When the joint is staggered, the two adjacent column joints are avoided to be in the same span, and the distance between them is not less than 50cm; the distance between each joint center and the main node is not greater than 60cm.
Q:Do I twist my scaffold piercing?
Why are you using Claire's crap? You need to be doing sea salt soaks twice a day for 5-10 minutes each soak with 1/4th of a teaspoon of non-iodized sea salt to 8oz of hot water. Don't twist them as that drags in crust and bacteria and tears up the inside of the piercing. Stop trying to pick stuff off from your ear and go have a reputable piercer check out the scabbing, it could be crust it could be something wrong. If your piercer didn't tell you to do sea salt soaks to keep it clean go to a better piercer.
Q:Key points for safety of portal scaffolding
4, grade six and above six winds and rain, snow, fog should stop the scaffolding erection, demolition and construction operations.5, during the construction of the following shall not dismantle the rod: 1) cross support, horizontal frame; 2) even wall pieces; 3) reinforcement rods: such as scissors, horizontal reinforcement bar, sweeping pole, sealing rod, etc.;
Q:people who have an industrial/scaffolding piercing?!?
I for barbells. They have some pretty epic lightnight bolt ones and zigzags and they are like 3 bucks!!!! You can never find them in the mall like that :P lol. Anyway, i deff. think you should get the piercing. It's worth the pain. It'll be over in 2 seconds lol. Good luck :D
Q:In the calculation of the bearing capacity of the scaffold, what is the axial force produced by the "N g2k" - the standard value of the component?
Is to produce weight between each vertical rod scaffolding force
Q:Bowl buckle scaffold inspection and evaluation
Bowl buckle scaffold should be checked and accepted as follows:(1) access to the site of the bowl buckle frame fittings shall have the following information:
Q:When scaffolding is erected on the base of the permanent structural concrete
5.2.5 scaffolding engineering A. structural parts (1) structural parts selection and calculation basis

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range