Stainless Steel Curtain Wall Spider
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 100000 Pieces per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Manufacturer
2.Lost-wax casting
3.Stainless steel 304 or 316
4.Satin or mirror surface
5.OEM or ODM is ok
We are a professional manufacturer of glass clamp, balustrade and handrail fittings,pipe fittings and curtain wall spiders,including wall bracket,end cap,tube base,flange,elbow,tee,rail support,crossbar holder,wall spider,also we can supply the whole set of handrail and balustrade series etc.
We have our own lost-wax casting and machining foundries,have high-qualified workmen with advanced experience,examination,equipment and quality-guaranteed system.
1.one-arm spider
2.two-way spider
3.three-way spider
4.four-way spider
5.route is also available
6.Material: SS304 (AISI304
7.Surface: satin/brushed finish or mirror/polished finish;
8.Certificates:international testimonials of ISO9001/2008,CE & PED;
9.Payment: T/T 30% paid in advance as deposit, 70% balance to be paid upon receipt of copy of B\L.
10.Delivery time: 35-45 days upon receipt of deposit;
11.Terms of delivery: By ship, by plane or by express;
12.Packng:Each one is wrapped in EPE bag,6 pcs are put into a small white box,ten boxes makes a outer carton;
13.100% guarantee on the highest quality,the material is analyzed by German Spectrometer for each furnace.
14.Reputation: We enjoy a good reputataion from home and abroad,so far we have not received any complaints;
15.ODM and OEM: Our R & D department is able to offer technical support for customers on the basis of your sample or drawing. A mould cost will be paid back if your order reaches a specific quantity.
- Q:How many calculations for a square meter of material?
- Curtain wall material calculation points: 1. Panel: panel ratio of expansion area * utilization (general 1.03) 2. keel: linear density * per square meter length * utilization (generally 1.05 ~ 1.15, according to material specifications) 3. Attachment: use per square meter (weight or volume number) * Utilization rate (general 1.03) 4. Low-value consumables: 15 ~ 25 (yuan / m2, according to the type of curtain wall to consider) 5. Labor costs: market decisions
- Q:Whether the civil tender contains the curtain wall and does not contain the curtain wall, behind the owner and the general contract of the contract agreement What is the difference
- If not included, that the curtain wall to a separate tender, not included in the total package management, that curtain wall bid to issue a separate bid notice, the top of the tender to do the chapter, curtain wall units and owners signed a contract, the record is to take both sides of the contract and curtain wall Successful notice of the record.
- Q:Building energy efficiency acceptance of what documents
- Technical documents 1.1 through the review of the agency to review the energy-saving design and related technical documents (such as energy-saving design, energy-saving design calculations, etc.); 1.2 exterior wall, roof and hot bridge parts of the insulation construction practices or construction program design and construction plans; 2 Building and insulation materials for the manufacture of specimens 2.1 wall samples: If the ordinary clay hollow brick wall should be asked about 60 ordinary clay hollow brick, such as small hollow block (190 × 190 × 390) wall should obtain 14 blocks and seven small pieces of small hollow block ; Roof test specimen: 0.20 cubic meters of concrete material should be obtained; 2.2 sand: about 200 kg; 2.3, cementing material (cement 30 kg, lime cream 10 kg, etc.); 2.4 insulation materials and installation of insulation materials annex (calculated by 1.5 square meters); 2.5 plaster material and finishes (in 1.5 square meters).
- Q:What is the construction process of the point glass curtain wall?
- First measure whether the steel structure and drawings in line to see if there is no deviation. If there is no deviation in the steel structure on the line to set the location of the mother, the location should be as accurate as possible. And then welding to the mother base. The welding is completed and then the jaw pieces are mounted on the female base, and then the splice fitting is mounted on the hole of the glass, and then the hook is hung up and the screw is tightened. Out of place.
- Q:Bidding documents are glass curtain wall, the party has to check the aluminum alloy window, how to do?
- Should be agreed by the contract, if the contract is not agreed, that is, according to the actual settlement of the two sides resolved.
- Q:What is the classification of building materials?
- Construction technology information according to its nature is divided into seven categories: The first category: construction project legal construction procedures necessary documents; Category II: Integrated management information; The third category: engineering quality control information; Including: acceptance of information Construction management information Product quality certification documents Inspection Report Construction record and inspection report The fourth category: engineering safety and functional inspection data and the main function of the record; The fifth category: inspection batch quality acceptance records; Category 6: Construction log; The seventh category: the completion of the map;
- Q:Curtain wall energy-saving project acceptance of the general project which
- Construction and installation requirements, including insulation material fixed, partition thermal bridge, steam layer, ventilation equipment, glass installation, shade installation, condensate set system installation.
- Q:Department of Construction and Construction (2017) 38 on the construction of glass curtain wall what are the requirements
- The new glass curtain wall should take into account the urban landscape, the surrounding environment and the nature of the building and the use of functions and other factors, in accordance with building safety, environmental protection and energy saving requirements, reasonable control of the glass curtain wall type, shape and area. Encourage the use of lightweight energy-saving decorative materials, from the source to reduce the glass curtain wall security risks.
- Q:What are the contents of the curtain wall energy conservation project quality acceptance?
- Curtain wall energy-saving project quality acceptance includes the following: 1) hidden acceptance requirements. 2) curtain wall materials, accessories, accessories, components of the quality, including insulation materials, glass, shade components, unit curtain wall panels, seals, insulation profiles. 3) materials, accessories, accessories, components witnessed sampling, re-inspection requirements. 4) curtain wall air tightness requirements, laboratory inspection requirements. 5) curtain wall thermal construction requirements, including insulation material installation, steam layer, curtain wall and wall joints, structural joints, structural joints, hot bridge parts, heat sink joints, unit curtain wall between the joints, Water drainage structure and so on. 6) construction and installation requirements, including insulation material fixed, partition thermal bridge, steam layer, ventilation equipment, glass installation, shade installation, condensate drainage system installation.
- Q:Residential stone curtain wall design height of not more than 50m to demonstrate it
- Not more than 50 meters, do not need expert argument.
1. Manufacturer Overview |
|
---|---|
Location | Guangdong,China (Mainland) |
Year Established | 2008 |
Annual Output Value | |
Main Markets | North America South America Eastern Europe Southeast Asia Oceania Mid East Eastern Asia Western Europe |
Company Certifications | ISO 9001:2000;ISO 9001:2008;QS-System nach EN 764-5, Abschnitt 4.2, und AD 2000-Merkblatt W O |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Stainless Steel Curtain Wall Spider
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 100000 Pieces per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords