Stainless Steel Glass Clamp Holder

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
100 Pieces pc
Supply Capability:
100000 Pieces per Month pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Material:Stainless steel 304 or 316

 

2.Surface: Satin or mirror surface treatment

 

3.Type:Stainless steel two way arm spider

 

4.Application:Used on handrail or balustrade

 

5.Certificates:International testimonials of ISO9001:2008,CE&PED of TUV

 

6.Delivery:By ship,by plane or by express

 

7.We can also accept ODM or OEM service

 

8.We have our own lost-wax casting and machining factories,we can make sure that the material component and quality are totally up to your requirements

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the curtain wall materials to do? The beginning of the time
Curtain wall works include: 1, curtain wall works to complete the map, structural calculations, design instructions and documents; 2, the architectural design unit of the curtain wall engineering design confirmation documents; 3, the curtain wall works with a variety of materials, hardware accessories, components and components of product certification, performance testing reports, admission inspection records and re-inspection report; 4, the curtain wall works of the silicone structure of the identification of the certificate and the inspection certificate, the import of silicone structural adhesive business certification, silicone structural adhesive compatibility and peel adhesion report, stone sealant with the pollution test report ; 5, post-embedded pieces of the field tensile strength test report; 6, the wind wall of the wind pressure deformation performance, airtight performance, watertight performance and other design requirements of the performance test report; 7, glue, curing the environment temperature, humidity records, two-component silicone structure of the mixing test of plastic and pull test records; 8, lightning protection device detection burn; 9, hidden engineering acceptance documents; 10, the curtain wall components and components of the production of burning, curtain wall installation construction records; 11, tension rod cable prestressed tension record; 12, water test records;
Q:Curtain wall design documents review how qualified newspaper supervision
Upstairs that is also OK, but I think the best to play an A4 table, followed by a certificate sent in the past better, so it seems more formal, but the certificate to his copy is on the line.
Q:Building energy efficiency acceptance of what documents
First of all, you are where the department is responsible for energy conservation acceptance, and then to the relevant departments of the department to understand what specific documents need, because different regions, different time periods of different content of the project acceptance is often different, and government agencies, first Find out the current requirements, do not work with experience, we are ate losses.
Q:Bidding documents are glass curtain wall, the party has to check the aluminum alloy window, how to do?
Should be agreed by the contract, if the contract is not agreed, that is, according to the actual settlement of the two sides resolved.
Q:What are the contents of the curtain wall energy conservation project quality acceptance?
Curtain wall energy-saving construction of the following parts or projects should be hidden project acceptance, and should have a detailed text and the necessary image information: 1 is the thickness of the insulation material and insulation material is fixed; 2 wall around the wall and the joints of the insulation material filling; 3 construction joints, settlement joints; 4 steam layer; 5 hot bridge parts, heat sink nodes; 6 joints between the curtain wall panels; 7 Condensate collection and discharge structures; 8 curtain wall ventilation device.
Q:Curtain wall energy-saving project acceptance of the general project which
Curtain wall thermal construction requirements, including insulation material installation, steam layer, curtain wall and wall joints, structural joints, structural joints, hot bridge parts, heat sink joints, unit curtain wall plate joints, condensate set Row structure and so on.
Q:What is the classification of building materials?
Generally have: progress, quality, safety, cost
Q:Whether the civil tender contains the curtain wall and does not contain the curtain wall
If not included, that the curtain wall to a separate tender, not included in the total package management, that curtain wall bid to issue a separate bid notice, the top of the tender to do the chapter, curtain wall units and owners signed a contract, the record is to take both sides of the contract and curtain wall Successful notice of the record.
Q:Department of Construction and Construction (2017) 38 on the construction of glass curtain wall what are the requirements
Glass curtain wall should adopt laminated glass, homogeneous tempered glass or ultra-white glass. The use of tempered glass should meet the existing national standard "building doors and windows curtain wall with tempered glass" JG / T455 requirements.
Q:What is the construction process of the point glass curtain wall?
The curtain wall is the outer wall of the building, is not bearing the weight, just like the curtain hanging. At present, many large and high-rise buildings commonly used in light walls are used this.
We make every step strictly, especially for testing. We have spectroscopy analysis, metallographic microscope, tensile, hardness, impact and X-Ray test, liquid penetrant, magnetic particle test and NTD inspection. The interpretation of the data from these test facilities could promise the best quality of our raw casting, any required test report of process should be attached before delivery of all the casting parts of each.

1. Manufacturer Overview

Location Guangdong,China (Mainland)
Year Established 2008
Annual Output Value
Main Markets North America
South America
Eastern Europe
Southeast Asia
Oceania
Mid East
Eastern Asia
Western Europe
Company Certifications ISO 9001:2000;ISO 9001:2008;QS-System nach EN 764-5, Abschnitt 4.2, und AD 2000-Merkblatt W O

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range