Stainless Steel Fin Spider for Glass Curtain Wall
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Piece/Pieces pc
- Supply Capability:
- 60 Ton/Tons Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Intruduction:precision casting,investment casting,304/316 stainless steel,building hardware,glass spider,building curtain wall
2. Size:100mm,120mm,150mm,160mm,200mm,210mm,220mm,250mm,300mm.
3. Material201,202,301,304,316,316L/304 and 316 material are popular in the market
4. Each type include the 4 arms,3 arms,2 arms,90.2 arms,108.1arm long and 1 arm short
5. The surface can be coated with paint of different colors
6. Package:carton package or can do as the requirement of our clients with your logo
7. The payment is T/T or L/C 30% down payment should be paid first and others should be paid after your get the B/L
8. You can order the full set including the routels and the connector or only the spider
- Q: Curtain wall design documents review how qualified newspaper supervision
- You should say is the curtain wall of the drawings review certificate. Do not need any format, do not have a separate inspection, copy a copy of the supervision to the OK. The The And the original should be given to the Party
- Q: Department of Construction and Construction (2017) 38 on the construction of glass curtain wall what are the requirements
- The new glass curtain wall should take into account the urban landscape, the surrounding environment and the nature of the building and the use of functions and other factors, in accordance with building safety, environmental protection and energy saving requirements, reasonable control of the glass curtain wall type, shape and area. Encourage the use of lightweight energy-saving decorative materials, from the source to reduce the glass curtain wall security risks.
- Q: What is the construction process of the point glass curtain wall?
- First measure whether the steel structure and drawings in line to see if there is no deviation. If there is no deviation in the steel structure on the line to set the location of the mother, the location should be as accurate as possible. And then welding to the mother base. The welding is completed and then the jaw pieces are mounted on the female base, and then the splice fitting is mounted on the hole of the glass, and then the hook is hung up and the screw is tightened. Out of place.
- Q: Stainless steel sheet approach to provide any proof of quality documents
- The simplest is the material certificate slightly, generally large steel mills are made of stainless steel material certificate. If your product needs environmentally friendly, then the use of stainless steel on the need for environmental certification, like ROSH certification.
- Q: What is the classification of building materials?
- Generally have: progress, quality, safety, cost
- Q: Curtain wall energy-saving project acceptance of the general project which
- Construction and installation requirements, including insulation material fixed, partition thermal bridge, steam layer, ventilation equipment, glass installation, shade installation, condensate set system installation.
- Q: What are the contents of the curtain wall energy conservation project quality acceptance?
- The curtain wall is the external wall of the building, not load, like the curtain hanging up, it is also known as the "curtain wall", is a modern large and high-rise buildings with decorative effect of light wall. By the panel and the supporting structure of the system can be relative to the main structure of a certain displacement or have their own ability to deformation, do not assume the role of the main structure of the building outside the envelope or decorative structure. Curtain wall energy-saving projects used in the installation of insulation materials should be taken to protect moisture, water and other protective measures.
- Q: Bidding documents are glass curtain wall, the party has to check the aluminum alloy window, how to do?
- Should be agreed by the contract, if the contract is not agreed, that is, according to the actual settlement of the two sides resolved.
- Q: What are the curtain wall materials to do? The beginning of the time
- Curtain wall works include: 1, curtain wall works to complete the map, structural calculations, design instructions and documents; 2, the architectural design unit of the curtain wall engineering design confirmation documents; 3, the curtain wall works with a variety of materials, hardware accessories, components and components of product certification, performance testing reports, admission inspection records and re-inspection report; 4, the curtain wall works of the silicone structure of the identification of the certificate and the inspection certificate, the import of silicone structural adhesive business certification, silicone structural adhesive compatibility and peel adhesion report, stone sealant with the pollution test report ; 5, post-embedded pieces of the field tensile strength test report; 6, the wind wall of the wind pressure deformation performance, airtight performance, watertight performance and other design requirements of the performance test report; 7, glue, curing the environment temperature, humidity records, two-component silicone structure of the mixing test of plastic and pull test records; 8, lightning protection device detection burn; 9, hidden engineering acceptance documents; 10, the curtain wall components and components of the production of burning, curtain wall installation construction records; 11, tension rod cable prestressed tension record; 12, water test records;
- Q: Fire aluminum glass is what glass where to sell
- This involves more, you can special check, of course, you need to be specific communication
1. Manufacturer Overview
Location | Guangdong,China (Mainland) |
Year Established | 2008 |
Annual Output Value | |
Main Markets | North America South America Eastern Europe Southeast Asia Oceania Mid East Eastern Asia Western Europe |
Company Certifications | ISO 9001:2000;ISO 9001:2008;QS-System nach EN 764-5, Abschnitt 4.2, und AD 2000-Merkblatt W O |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b) Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Stainless Steel Fin Spider for Glass Curtain Wall
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Piece/Pieces pc
- Supply Capability:
- 60 Ton/Tons Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords