Cookware Accessory

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1000 Piece/Pieces Negotiable pc
Supply Capability:
60 Ton/Tons Per Month Negotiable pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Casting Stainless Steel Cookware Accessory --Panhandle

Materials:304, 316, 316L

Surface Treatment:Stain & Mirror Polish

 

 

Cookware Accessory

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the curtain wall materials to do? The beginning of the time
Curtain wall works include: 1, curtain wall works to complete the map, structural calculations, design instructions and documents; 2, the architectural design unit of the curtain wall engineering design confirmation documents; 3, the curtain wall works with a variety of materials, hardware accessories, components and components of product certification, performance testing reports, admission inspection records and re-inspection report; 4, the curtain wall works of the silicone structure of the identification of the certificate and the inspection certificate, the import of silicone structural adhesive business certification, silicone structural adhesive compatibility and peel adhesion report, stone sealant with the pollution test report ; 5, post-embedded pieces of the field tensile strength test report; 6, the wind wall of the wind pressure deformation performance, airtight performance, watertight performance and other design requirements of the performance test report; 7, glue, curing the environment temperature, humidity records, two-component silicone structure of the mixing test of plastic and pull test records; 8, lightning protection device detection burn; 9, hidden engineering acceptance documents; 10, the curtain wall components and components of the production of burning, curtain wall installation construction records; 11, tension rod cable prestressed tension record; 12, water test records;
Q:Curtain wall design documents review how qualified newspaper supervision
You should say is the curtain wall of the drawings review certificate. Do not need any format, do not have a separate inspection, copy a copy of the supervision to the OK. The The And the original should be given to the Party
Q:Building energy efficiency acceptance of what documents
Technical documents 1.1 through the review of the agency to review the energy-saving design and related technical documents (such as energy-saving design, energy-saving design calculations, etc.); 1.2 exterior wall, roof and hot bridge parts of the insulation construction practices or construction program design and construction plans; 2 Building and insulation materials for the manufacture of specimens 2.1 wall samples: If the ordinary clay hollow brick wall should be asked about 60 ordinary clay hollow brick, such as small hollow block (190 × 190 × 390) wall should obtain 14 blocks and seven small pieces of small hollow block ; Roof test specimen: 0.20 cubic meters of concrete material should be obtained; 2.2 sand: about 200 kg; 2.3, cementing material (cement 30 kg, lime cream 10 kg, etc.); 2.4 insulation materials and installation of insulation materials annex (calculated by 1.5 square meters); 2.5 plaster material and finishes (in 1.5 square meters).
Q:Bidding documents are glass curtain wall, the party has to check the aluminum alloy window, how to do?
Should be agreed by the contract, if the contract is not agreed, that is, according to the actual settlement of the two sides resolved.
Q:What are the contents of the curtain wall energy conservation project quality acceptance?
Curtain wall energy-saving construction of the following parts or projects should be hidden project acceptance, and should have a detailed text and the necessary image information: 1 is the thickness of the insulation material and insulation material is fixed; 2 wall around the wall and the joints of the insulation material filling; 3 construction joints, settlement joints; 4 steam layer; 5 hot bridge parts, heat sink nodes; 6 joints between the curtain wall panels; 7 Condensate collection and discharge structures; 8 curtain wall ventilation device.
Q:Stainless steel sheet approach to provide any proof of quality documents
There are many types of curtain walls, such as glass curtain wall, dry hanging stone curtain wall, aluminum-plastic curtain wall, etc., which there are a number of detailed classification, I have some information on hand, I do not know which corresponds to your needs, please add specific requirements
Q:Whether the civil tender contains the curtain wall and does not contain the curtain wall
If not included, that the curtain wall to a separate tender, not included in the total package management, that curtain wall bid to issue a separate bid notice, the top of the tender to do the chapter, curtain wall units and owners signed a contract, the record is to take both sides of the contract and curtain wall Successful notice of the record.
Q:How many calculations for a square meter of material?
Curtain wall material calculation points: 1. Panel: panel ratio of expansion area * utilization (general 1.03) 2. keel: linear density * per square meter length * utilization (generally 1.05 ~ 1.15, according to material specifications) 3. Attachment: use per square meter (weight or volume number) * Utilization rate (general 1.03) 4. Low-value consumables: 15 ~ 25 (yuan / m2, according to the type of curtain wall to consider) 5. Labor costs: market decisions
Q:What is the construction process of the point glass curtain wall?
First measure whether the steel structure and drawings in line to see if there is no deviation. If there is no deviation in the steel structure on the line to set the location of the mother, the location should be as accurate as possible. And then welding to the mother base. The welding is completed and then the jaw pieces are mounted on the female base, and then the splice fitting is mounted on the hole of the glass, and then the hook is hung up and the screw is tightened. Out of place.
Q:Residential stone curtain wall design height of not more than 50m to demonstrate it
Not more than 50 meters, do not need expert argument.
We make every step strictly, especially for testing. We have spectroscopy analysis, metallographic microscope, tensile, hardness, impact and X-Ray test, liquid penetrant, magnetic particle test and NTD inspection. The interpretation of the data from these test facilities could promise the best quality of our raw casting, any required test report of process should be attached before delivery of all the casting parts of each.

1. Manufacturer Overview

Location Guangdong,China (Mainland)
Year Established 2008
Annual Output Value
Main Markets North America
South America
Eastern Europe
Southeast Asia
Oceania
Mid East
Eastern Asia
Western Europe
Company Certifications ISO 9001:2000;ISO 9001:2008;QS-System nach EN 764-5, Abschnitt 4.2, und AD 2000-Merkblatt W O

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range