Scaffolding Parts-Prop Plate with black color

Ref Price:
$0.70 / kg
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of Prop Plate

Packaging Details:

Export worthy or as   per client request

Delivery Detail:

As per schedule

2. Prop Plate Products pictures:


Scaffolding Parts-Prop Plate with black color

Scaffolding Parts-Prop Plate with black color

3. Prop Plate Specification:

Made from Low Carbon Steel/ Mild steel

1) Surface: natural or galvanizing,or painting
2) Sizes:150x150x5mm ~120x120x5mm
3) Process of manufacturing:Sheet Metal
4) Samples are available

5.FAQ

 We have organized several common questions for our clients, may help you sincerely:

1) How is the Packaging Details?

In bags or as the requirement of customers.

2) How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Find the demolishing scheme of scaffold
Removal of scaffolding shall comply with the following requirements:11.2.1 removal operations must be carried out from top to bottom, prohibited from top to bottom operation at the same time;11.2.2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the dismantling of scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the 2 step, should be added to strengthen the wall;
Q:How to set up the temporary structure of the external structure of the balcony on the two structure
Construction scheme and technical measuresAccording to the actual situation of the 1.1. design drawings and combined with the content of the project construction site, the project arrangement of small water method construction work construction, construction division order: positioning line - based project main project - - - Roof Engineering Decoration Engineering hydropower installation engineering - completion of cleaning, acceptance, delivery. Positioning of engineering survey according to the plan and the total construction plan.
Q:What are the advantages and disadvantages of the fastener type steel pipe scaffold and bowl buckle steel tube scaffold
(4) the bearing capacity is large: the vertical rod connection is a coaxial core socket, and the cross bar is connected with the vertical rod by a bowl buckle joint. And the axial line of each member is placed at one point, and the node is in the plane of the frame. (the entire frame bearing capacity, about the same clear fastener type steel tube scaffold condition is improved by more than 15%,)
Q:Question about ΣF=0 on a scaffolding (Mechanical Equilibrium)?
You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
Q:A painter and a scaffold?
First of all...no units, no answer. Second of all...according to OSHA (Occupation Safety and Health Administration), NO ONE can walk on a scaffold beam outside the support ropes OR SET ANY OBJECT DOWN outside the support ropes. Hence the answers for both questions are 1 meter. It doesn't matter what a calculation will yield...NO ONE can walk on the beam outside the support ropes safely. Even if a torque balance yields that it will not put the ropes in compression and buckle them...it still isn't considered to be safe by OSHA if the painter is outside the ropes.
Q:What is a bar in the scaffold
Scaffolding in the cross section of the large cross bar, small cross bar.Large cross - vertical horizontal bar, which is located along the vertical axis of the scaffolding rod.A small transverse rod, a horizontal rod, which is horizontally arranged along the scaffold.
Q:Scaffolding/Industrial piercing?
I have two lobe piercings on both ears, two cartilage piercings and an industrial that i got five months ago. I was expecting my industrial to be very painful but it wasn't that bad (i have a high pain tolerance though) its a bearable pain. Like all other piercings the healing process is the worst part and still when i bump it (like when im doing my hair) it hurts like a B****! lol. And don't play with it alot when you first get it, it causes scar tissue bumps. Use H20cean spray or you can do 1/4 tsp of sea salt and 1 cup of water to help heal it. The healing time is long, 4 months to a year. I paid $65 dollars in the us idk how much that is UK. It was definitely worth it though! Go for it :)
Q:What is the mobile scaffolding materials
The overall life of cold galvanized mobile scaffolding accessories for about 5 years, the surface does not require maintenance, moderate cost. The main processing technology: the welding of the scaffolding parts and then galvanized, the surface of each part, are galvanized
Q:29 meters outside the walls of the house of the two rows of steel pipe scaffolding installation, demolition
With regard to the design and construction of floor type (double pole type) single and double row steel pipe scaffold for industrial and civil construction, and the design and construction of formwork support in the construction of horizontal concrete structure. National compulsory technical norms, because of its complexity, and you proposed "one square meter standard steel scaffolding the number of meters" is a vague and unclear description of the problem, considering the matter of security,
Q:Bracket cast in situ beam bracket must use bowl buckle scaffold
3.1.2, clearly defined the quality requirements of fasteners, so you can use fasteners

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing