scaffolding Prop parts plate,pin,screw,nut

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
50万套 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Steel Prop's Part / Accessories for Scaffolding(Factory)

Main Specification :

Meterial:Q235 ,Casting iron ,etc.

Surface treatment:pre-galvanised, electro galvanized or hot dip galvanised,Painted,Poewder coated

Color:Self-color(Black) , Silver

Quality:good bearing capacity,durable & stable

Pls kindly pick out the suitable size(Customized size available.), and then contact me for the price.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Industrial / scaffold piercings - pierced with rings?
yeah that is a better idea. it prevents the bar from getting ripped out, rejecting, and generally makes it less likely to get caught up in your hair while it's still sore.
Q:What's the difference between scaffold and industrial piercing?
Nothing... The piercer will use an extra long barbell, most likely a 14 gauge.. too.
Q:examples of scaffolding?
As long as you're on the internet, why not just Google examples of scaffolding rather than expecting someone on YA to do your homework for you?
Q:What scaffold courses do i need to do to work offshore?
Sorry if I'm not serious, but go to Hong Kong as there they do scaffolding made of bamboo and 170 floors high ,2000mtrs above the sea level... Now that is serious...
Q:Cantilever beam type scaffolding can not exceed the maximum number of not married
Cantilever scaffold cantilever beam fixed method is as follows:1, the floor in the rebar at the same time, the embedded two door shaped clamp, each clamping hoop is composed of 2 14mm grade steel made a root diameter, the first door shaped clamp from the wall 450mm, second door shaped clamp from the other end of the 350mm, the door shaped card hook stirrup slab reinforcement, to meet the requirements of the anchorage the cantilever beam, door shaped clamp is inserted in the middle, but also with a fixed electric welding.
Q:Painters on a scaffold physics help!!?
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q:Introduction of external scaffolding
2 the size and surface quality of steel pipe shall meet the following requirements:1) the new steel pipe should have quality certificate, quality inspection report; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth of steel pipe; allowable deviation table item allowable deviation inspection tool 1 welded steel pipe size (mm) diameter 48 wall 3.5 -0.5 thick 2 vernier caliper at two ends of the steel tube shear diagonal deviation 1.7 corner ruler feeler, the outer surface of the steel pipe 3 corrosion depth is less than or equal to 0.50 bar 4 vernier caliper end bend L = 1.5m = 5, 5 pole bending steel ruler 3m
Q:what is common cause of formwork and scaffolding failure during construction?
I believe that you have covered it all. Improper handling covers my first thought; workers carelessness by not following safety guidlines
Q:What are the requirements for acceptance of external scaffolding? Want to know before
Hello, this has the following specifications: safety 1, set up a high level scaffolding, the various materials used must meet the quality requirements. 2, the foundation must be firm, before the erection of the calculation, to meet the load requirements, and according to the construction code set up, do drainage measures. 3, scaffolding erection technical requirements shall comply with the relevant provisions of the code
Q:29 meters outside the walls of the house of the two rows of steel pipe scaffolding installation, demolition
Homework is two, while the long rod is 273m; small bar is 51; rectangular fastener 187; butt fastener 55; rotating fastener 17; a 7 foot board 14 square meters. You can use this to derive the amount per square meter. (average length of 5 meters).

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range