• Scaffolding  heauty double coupler System 1
  • Scaffolding  heauty double coupler System 2
Scaffolding  heauty double coupler

Scaffolding heauty double coupler

Ref Price:
get latest price
Loading Port:
Nanjing
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
50000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

SPECIFICATIONS:

1 MATERIAL:Q235

2 SWIVEL AND DOULE RIGHT ANGLE COUPLER

3 DROP FORGED AND PRESSED

4 BS1139 AND EN74 STANDARD

5 SIZE:48.3*48.3MM

6 PRESSED AND DROP FORED SWIVEL AND FIXED COUPLER/PUTLOG COUPLER/SLEEVE COUPLER/INNER CONNECTOR/BEAM COUPLER ETC.

Pressed swivel coupler 1.02kg  galvanized/ hot dipped galvanized

Pressed fixed coupler  0.85kg  galvanized / hot dipped galvanized

DROP FORGED SWIVEL COUPLER   0.98kg       galvanized / hot dipped galvanized

DROP FORGED SWIVEL COUPLER   1.12kg  

DROP FORGED PUT LOG COUPLER  0.62KG    galvanized / hot dipped galvanized

DROP FORGED SLEEVE COUPLER     1.1KG    galvanized / hot dipped galvanized

DROP FORGED  FIXED BEAM COUPLER     1.45KG    galvanized / hot dipped galvanized

DROP FORGED SWIVEL GRINDER COUPLER     1.5KG    galvanized / hot dipped galvanized

7  SUITABLE FOR PIPE DIAMETER:48MM,48.3MM,60.3MM

8 Payment terms:30%TT deposit, balance against BL copy or LC at sight

9 FOB .CIF.C&F ,CFR acceptable

10 Delivery time;20-30days after receiving deposit


Q: Whats a scaffold in ac brotherhood?
Wrong category. Post under Video and Online Games.
Q: Exterior wall scaffold construction plan?
Vertical pole:Double row scaffolding pole, pole top high eaves 1.5m structure. Single tube base for vertical rod bottom. The vertical rod joint is connected with a butt fastener, and the vertical rod and the large cross bar are connected by a right angle fastener. When the joint is staggered, the two adjacent column joints are avoided to be in the same span, and the distance between them is not less than 50cm; the distance between each joint center and the main node is not greater than 60cm.
Q: Room 29 meters outside the wall of the two rows of steel pipe scaffolding installation, demolition, joint protection measures in Wuhan, the price per square is how much money? A friend to help refer to Kazakhstan
When the double row scaffolding longitudinal distance 1.5m, horizontal distance 1.2m, step 1.8m, as per 100 square meters of double row scaffolding rod parts
Q: For the current stage of China's construction should not strengthen the specific meaning of scaffolding and support by way of the scaffolding and support the specific distinction and significance
At the present stage Chinese people-oriented, building a harmonious society, especially the importance of safety in production site, in addition to constantly modify the security specifications and technical documents issued by a variety of real-time safety, strengthen safety measures, compulsory accident insurance and so on. JGJ130-2011 is the new version of the construction of steel tubular scaffolding safety technical specifications should be strengthened scaffolding construction management. The current JGJ162-2008 is the safety technical specification for the construction of fastener type steel pipe formwork support.
Q: A scaffold is constructed by placing two supports under a 13 ft, 9 in (a) board weighing 84 lbs. The supports are each 2 ft, 8 in (b) from their respective ends. Two painters stand on the board; one weighs 158 lbs and stands 4 ft, 11 in (c) from the left end of the board. Where must the 222 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)please help!! thanks(:
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q: Cells from an animal's muscles are processed with chemicals and they grow. The cells are transferred to a metal scaffold and are stimulated physically. In a few months, you have a big block of meat which can be ground and cooked. What do you have to add? Does this innovation mean the price of meat will become a very minor expense?
Sounds weird. When eaten I wonder how this experiment would affect the human body. It just might turn normal people into Liberals. If that's the case then I don't want anything to do with it.
Q: What is a bar in the scaffold
Scaffolding (scaffold) refers to the construction site for the workers to operate and solve the vertical and horizontal transport and erection of various stents. The general term of the construction industry, refers to the construction site used in the external walls, interior decoration or high level can not be directly construction. Mainly in order to work or work on the construction of the perimeter of the safety net enclosure and high altitude installation components, etc., is put on the shelf, scaffolding materials are usually made of bamboo, wood, steel or synthetic materials, etc.. Some projects also use scaffolding as templates.
Q: I got my scaffold piercing 6 days ago, with titanium, and it was fine until yesterday.I had a couple of nights out and might have knocked it a few times, but yesterday it was swollen, red, throbbing and very painful. There is no liquid coming from it. It seems to have got worse today.I have been following the aftercare advice and cleaning it several times a day with rock salt solution and (up until yesterday) savlon antiseptic spray. Is it just irritated or is it infected? How long should I wait before I go to the doctor? If it is infected, will I have to take it out or just take antibiotics?Thanks!
it sounds like it's just irritated, if it's infected it will be secreting puss. Have you tried to soak it in the rock salt solution? Soak two cotton balls and put one on each side on the piercing and keep it there for 10 minutes a day. And make sure the antiseptic spray has zero alcohol in it because that can irritate it and prolong healing. Try this for a few days and if it's not getting better then go see your doctor.
Q: ...and I'm not really sure what to expect. I know that everyones healing time and pain tolerence is different but just some personal storys would be nice. And before you say it I am aware that there are risks as there are risks with any piercing. so I'm 17 from London and wondering:How old do you have to be to get it done?Does anyone know a reputable place i can get it done?How much will it be?any experiences to share?
Hi I got it done a few months ago I love it! Its really not that sore at all just a slight nip and then bit warm afterwards lol! Only thing annoyed me was couldn't sleep on it for a while and that was always the side I slept on! I live in Belfast and you can get it done from about 16. I just went to a well known tattoo parlour and had no problems what so ever. Go for it looks great Good luck :D
Q: Was thinking of getting one. How much do they cost?
Only a professional piercer can decide if your ear can handle and industrial piercing. Consultations are free and I highly recommend booking one before you get the piercing. Mine was $70, but my regular piercer does them for $50. It just depends on what shop you go to.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords