Scaffolding Cross Bar Accessories

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8618101089932

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Tianjin China (Mainland)


Model Number:
anjie
Type:
Scaffolding Parts
Scaffolding Part Type:
cross brace
material:
Q235
surface treatment:
galvanized
color:
silver or any color you need
quality:
competitive

Packaging & Delivery

Packaging Detail:packaged in bundle or as you like
Delivery Detail:Within 15-20 days after receiving the deposit

Specifications

cross brace tie bar
1.Competitive price
2.High quality.
3.Easy to operate.
4. OEM.

cross brace for gate frame scaffolding

cross brace
1Width:1219mm Height:610mm Length:1363mm  Diameter: 20.6*1.6mm
2 Width:1219mm Height:1219mm Length:1724mmDiameter: 20.6*1.6mm
3 Width:1829mm Height:610mm Length:1928mm  Diameter: 20.6*1.6mm
4 Width:1829mm Height:1219mm Length:2198mm  Diameter: 20.6*1.6mm
5  Width:1219mm Height:914mm Length:1524mm Diameter: 20.6*1.6mm
6  Width:1829mm Height:1219mm Length:2198mm  Diameter: 25*1.5mm
Diameter :20mm/25mm
Thickness:1.1mm/1.2mm/1.5mm/1.8mm/2.0mm/2.2mm/2.3mm
surface treatment:painting ,pre-galvanized , galvanized,HDG, painting with galvanized end
We could make as your requirement!

Main Business:
1. System scaffolding:
Include: Ringlock system scaffolding and accessories; Cuplock system scaffolding and accessories
2. Couplers/Clamps:
We can also sell all kinds of drop forged or pressed couplers, include: British type couplers, Italian type couplers, German type couplers, American type couplers, and many other kinds of couplers as per your drawings.
3. Frames
Mainly include: Mason (Ladder type) frames and walk through (door type) frames, we can also manufacture as per your drawings.
4. Shoring Props
Quality shoring props of different specifications can be manufactured in our factory.
5. Planks/ Toe Board:
Both aluminum and steel planks can be manufactured in our factory.

NO.DescriptionUnit Weight
KG
Surface Treating
1Head tube1.75Hot galvanizing
20.5M Ring type post3.05Hot galvanizing
31.0M Ring type post5.4Hot galvanizing
41.5M Ring type post7.8Hot galvanizing
52.0M Ring type post10.1Hot galvanizing
63.0M Ring type post14.85Hot galvanizing
70.75M Ring type cross bar3.35Hot galvanizing
81.0M Ring type cross bar4.35Hot galvanizing
91.5M Ring type cross bar6.11Hot galvanizing
102.0M Ring type cross bar7.85Hot galvanizing
112.5M Ring type cross bar9.8Hot galvanizing
123.0M Ring type cross bar11.85Hot galvanizing
131.5MX2.0M Diagonal bar11.2Hot galvanizing
142.0MX2.0M Diagonal bar12.2Hot galvanizing
152.5MX2.0M Diagonal bar13.35Hot galvanizing
163.0MX2.0M Diagonal bar14.95Hot galvanizing
173.0MX0.3M Plank19.2Hot galvanizing plate
182.5MX0.3M Plank17Hot galvanizing plate
192.0MX0.3M Plank13.2Hot galvanizing plate
2038x4x600mm Base jack3.2Electrogalvanizing


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I know it's soon, but my piercings swollen and quite sore when knocked slightly.I've only had it three or four days, but there's a swollen round lump right next to one pierced hole and I was worried it could be an early sign of a keloid. But I don't know if it's too soon to tell yet.I know they can take up to 6 months to heal, if not more, but I'm kinda paranoid about it.I've rinsed it after showering, used salt water on it every day and apart from that just washed it with water on a cotton bud.Any advice?
1. go and see the piercer... 2. go to a doctor 3. kepp doing what your doing
Q:He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
Q:Who has external scaffolding construction program
See the following table for permissible deviation of steel pipe:Item deviation check tool1 welded steel pipe size (mm) outer diameter 48Wall thickness 3.5-0.5 vernier caliperThe 2 ends of steel tube shear oblique deviation 1.7 feeler, corner rulerThe corrosion of 3 steel tube outer surface depth of less than 0.50 vernier caliper4 kinds of rod end bending L = 1.5m = 5, steel ruler5 pole bending 3m
Q:Calculation method of complete scaffold
No matter where we are, we all have time to go with us. It's an eternal departure
Q:I'm interested in a scaffold career in the oil rigs in the north sea
Sorry if I'm not serious, but go to Hong Kong as there they do scaffolding made of bamboo and 170 floors high ,2000mtrs above the sea level... Now that is serious...
Q:A 520 kg box sits 1.4 m from the left end. What is the tension in the right hand side wire? (g = 9.8 m/s2) ____________ Newtons
Because the scaffold is not moving, we can assume that the net Torque acting on the scaffold equals zero. Net Torque = 0 torque = Force x distance (d) Use the left end of the scaffold as the center point. This will eliminate the Torque caused by the left wire (d = 0, so torque = 0) There are now three forces creating torque on the scaffold. There is the weight (m x g) of the scaffold, at 3.5m from the left end. m1 x g x 3.5m There is the weight of the crate, located 1.4m from the left end: m2 x g x 1.4m These two torques are countered by the torque caused by the Tension (T) of the right wire, located 7m from the left side. T x 7m The sum of these torques is zero. (T x 7m) - (m1 x g x 3.5m) - (m2 x g x 1.4m) = zero solve for T T = ((m1 x g x 3.5m) + (m2 x g x 1.4m)) / 7m T = ((115kg x 9.8m/s^2 x 3.5m) + (520kg x 9.8m/s^2 x 1.4m)) = 1.58 x 10^3 N Hope this helps.
Q:Where to use scaffolding in construction
5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.
Q:Electric basket accessories are generic
Electric basket full name is called electric gondola, the construction of electric basket is mainly suitable for high-rise buildings on the electric power from the electric hoist special basket, basket accessories have what those:
Q:Fastener type steel pipe scaffold composed of which components?
3.3 foot plate3.3.1 foot plate can be made of steel, wood, bamboo materials, the quality of a single foot board should not be greater than 30kg.3.3.2 stamping steel feet of the material should be consistent with the existing national standard carbon structural steel GB/T700 Q235Class steel provisions.3.3.3 wooden foot plate material should be consistent with the current national standard "wood structure design code" GB50005 IIaMaterial requirements. Foot plate thickness should not be less than 50mm, both ends should be set to the diameter of not less than 4mm platingZinc wire hoop two.3.3.4 bamboo scaffold board shall be adopted by bamboo or bamboo bamboo string plate, bamboo; bamboo string amphipodsshouban shouldIn accordance with the existing industry standards "construction of wood Scaffolding Safety Technical Specifications" JGJ 164 of the relevant provisions.3.4 adjustable support3.4.1 adjustable support screw outer diameter shall not be less than 36mm, diameter and pitch should be in line with the current national standard "ladder"Type screw thread GB/T 5796.2, GB/T 5796.3 provisions.
Q:Can anyone give a very brief description on all three scaffold scenes in The Scarlet Letter?
oh dang u have to read that story too ! man i had to read it and watch the movie ! so boring. What grade are u in ?

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range
客服
live chat