• Scaffolding Accessories Pressed Swivel Coupler System 1
Scaffolding Accessories Pressed Swivel Coupler

Scaffolding Accessories Pressed Swivel Coupler

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Place of Origin:
Shandong China (Mainland)


Model Number:
KJ19
Type:
Scaffolding Parts
Scaffolding Part Type:
Scaffolding Couplers
surface:
painting
color:
custom made

Packaging & Delivery

Packaging Detail:Grates,Bags or As Customer's Requirements
Delivery Detail:20days

Specifications

1.name:scaffolding fixed coupler
2.category:scaffolding accessory
3.process:pressed
4.OEM service is available

1.name:scaffolding fixed coupler
2.category:scaffolding accessory
3.process:pressed

4.OEM service is available

5.application:fixed and connect scaffolding


Q:How to maintain the scaffold after use
The use of the end of the scaffolding (including the construction of accessories) should be returned to the library, classified storage. Open dumps, the site should be smooth, good drainage, under the support pad, and covered with a sheet, accessories, parts should be stored indoors. Wuxi Dongfang scaffolding scaffolding factory products strictly according to JOD-1999 and OD15001-1205 standards, a type of mobile scaffolding scaffolding, scaffolding, roulette scaffolding, scaffolding and scaffolding accessories.
Q:Room 29 meters outside the wall of the two rows of steel pipe scaffolding installation, demolition, joint protection measures in Wuhan, the price per square is how much money? A friend to help refer to Kazakhstan
With regard to the design and construction of floor type (double pole type) single and double row steel pipe scaffold for industrial and civil construction, and the design and construction of formwork support in the construction of horizontal concrete structure. National compulsory technical norms, because of its complexity, and you proposed "one square meter standard steel scaffolding the number of meters" is a vague and unclear description of the problem, considering the matter of security,
Q:What are the requirements for the construction of the scaffold eye in the building?
Calculation basisScaffolding input: for the template support part of the steel pipe material in accordance with the 1.5 layer of the amount of consideration: the amount of external scaffolding steel pipe in accordance with the full closed scaffolding consideration; safety net in accordance with the external scaffolding full consideration.
Q:Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q:Sweeping rod, large cross bar, small cross bar, scissors brace, vertical pole, right angle fastener, rotating fastener, butt joint fastener, even wall piece! If there is a cantilever frame, the main beam, steel wire rope, such as pull down support
Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components. The cross rod is also called the diagonal pull rod, and is a cross connecting rod which is vertically connected with the two door frames. The part of both ends of the rod part is punched with a pin hole, and the locking pin on the vertical rod of the door and the frame is locked when assembling.
Q:I sincerely ask you to help me, door scaffolding, build 30 meters high, without any reinforcement points of the construction program. Thanks, high marks!
1 in order to design and construct the steel pipe scaffold in the door, to carry out the relevant regulations of the state on safe production, and to realize the advanced technology, reasonable economy and safe application.
Q:I'm interested in a scaffold career in the oil rigs in the north sea
Sorry if I'm not serious, but go to Hong Kong as there they do scaffolding made of bamboo and 170 floors high ,2000mtrs above the sea level... Now that is serious...
Q:i already found the force in rope 2 but im not getting the force in rope 1.
The tension in the two vertical ropes must sum to 700N in order to balance the window washer. EDIT. In order to find the answer for each rope, I need to know how long the scaffold is and where the window washer is standing. EDIT. Taking moments about the end nearest to window washer. T1*3.044 = 298.6*1.522 + 700*1.51 ----> T1 = 496.54 N (2. d. p.) Taking moments about the other end. T2*3.044 = 298.6*1.522 + 700*1.534 ----> T2 = 502.06 N (2. d. p.) T1 + T2 = 496.54 + 502.06 = 998.6 = 700 + 298.6 as required.
Q:So im a guyAnd I might get oneAnyone had one before/got one?Any advice?How much do they normaly cost?if you answer this i will love you forever :)
okay, if you do end up getting it, make sure you get it on the side you DONT sleep on. dont let shampoo get on it. be really careful with it. if you have longer hair dont let your hair get caught in it cause it'll get tangled on it and it'll hurt and tug on the bar. it's usually around 40 dollars for it. this piercing requires a long time to heal and it has a high risk of infection. but if you take good care of it, you'll be good (: hope this helpedd.
Q:Bracket cast-in-place beam bracket must use bowl buckle scaffold, can not use fastener type scaffolding, there is no mandatory requirements, or specification file requirements!
No mandatory provisions.JGJ1622008 construction formwork safety technical specifications, is the latest specification

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords