Scaffolding Accessories Cuplock Scaffoldings Quality High

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
40 m.t
Supply Capability:
10000 m.t/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Scaffolding System Accessories Cuplock Scaffoldings High Quality

Product pictures:

Scaffolding Accessories Cuplock Scaffoldings Quality High

Scaffolding Accessories Cuplock Scaffoldings Quality High

Scaffolding Accessories Cuplock Scaffoldings Quality High

Product description:

Name:

Ringlock Scaffolding accessories

Category:

Scaffolding System

Material:

Steel (Q235/Q345)

Size:

D48*3.25mm, etc

Surface:

Electro Galvanized, Hot   Dipped Galvanized, Painted, Powder Coated

Component: 

Standard, Ledger, Diagonal   Brace, Bracket, Base Jack, U Head Jack, Etc.

Application:

Slab Support, Staircase,   Stage Plateforms, Bridge Support, Mobile Tower, etc.

Manufacturer:

OEM is Available

Items or goods can be   manufactured according to your standards.

Advantage

* Good loading capacity

* Easy to assemble and dismantle

* Excellent quality for formwork & scaffolding with wide choices

Other scaffolding & formwork products:

(1)   Scaffolding System

(2)   Scaffolding Frame & Accessories

(3)   Scaffolding Couplers/Clamps

(4)   Formwork System Scaffolding & Accessories

Company introduce and advantages:

1. A state-owned company, prestige fi rst.
2. One of Fortune 500 companies in the world. No. 5 in the building material fi eld.
3. Six Sigma strategy , which means no more than 3.4 defects existing among one million of error
possibilities.
4. We are highly recognized by our business partners and clients all over the world and has obtained rapid
development under the spirit of win-win.

FAQ

Why Us?

We are one of the largest construction materials suppliers in China.

We own professional manufacturers with powerful producing capacity.

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Advice to anyone thinking about getting an industrial/scaffold piercing?
Most piercings need 6 months to fully heal. Industrial will take up to a year to do so. You have to keep the jewelry in and do not take it out ( not even once ) for the whole period of 1 year. This means that you can't hide it for school. You can't put a retainer on also, cause only titanium or stainless steel material are proper for an open wound aka a new piercing. This piercing is not easy to heal and can stay irritated for long. It goes through cartilage and you have to be really careful with the aftercare and the piercer's info if you want to keep the piercing and yourself healthy. You have to be careful and not touch it or play with it and twist it or take it out. You clean this piercing with sea salt soaks or non alcohol antibacterial soap 2-3 times a day. You dry it with paper towels. If you can do the above daily and be extra careful go get it done. Gluck
Q:Industrial / scaffold piercings - pierced with rings?
yeah that is a better idea. it prevents the bar from getting ripped out, rejecting, and generally makes it less likely to get caught up in your hair while it's still sore.
Q:What is the difference between Scaffolding and Zone of Proximal Development?
Zpd And Scaffolding
Q:Do I twist my scaffold piercing?
Why are you using Claire's crap? You need to be doing sea salt soaks twice a day for 5-10 minutes each soak with 1/4th of a teaspoon of non-iodized sea salt to 8oz of hot water. Don't twist them as that drags in crust and bacteria and tears up the inside of the piercing. Stop trying to pick stuff off from your ear and go have a reputable piercer check out the scabbing, it could be crust it could be something wrong. If your piercer didn't tell you to do sea salt soaks to keep it clean go to a better piercer.
Q:Standard for inspection of portal scaffolding
The inspection results are summarized in table NO:2008JW1658 serial number of inspection items and standard units of measurement test results 1# 2# single judge 1 Materials: 1.1 qualified door frame and accessories in addition to special requirements, the material should be consistent with the provisions of the Q235 according to GB/T 700
Q:What is a bowl buckle scaffold?
The utility model has the advantages of reasonable structure, simple manufacturing process, easy operation and wide application range, and can fully meet the construction requirements of buildings, bridges and culverts, tunnels, chimneys, water towers and other buildings
Q:How old do you have to be to get a scaffold piercing in washington?
I'm pretty sure it's 16-17 with parental permission. I suggest looking up some of the shops in your area and seeing what they say. There usually isn't a set rule for it, every shop is different. Like some shops may refuse seeing, say, a 14 year old, whereas another shop might do it with the parent's permission. Then of course, once you hit 18, you can do whatever you want, lol.
Q:What are the common rules for calculating the amount of scaffolding works
According to the wall masonry scaffolding (single) vertical projection area calculation with square metre.Scaffolding, without deduction of door and window opening, air ring, vehicle channel, deformation joint area. At the same time, the height of the same building is different, according to the vertical height of the building.
Q:When scaffolding is erected on the base of the permanent structural concrete
. Among them, the specification of the steel pipe is from 0.5m to 6m, and the fastener mainly has a rotating shaft, a cross and a joint fastener. Bowl buckle scaffold also uses Phi 48, 3.5 wall thickness steel
Q:Seeking for the safe construction scheme of mobile scaffolding!
Double pole scaffolding and scaffold for decoration of the vertical distance rod step distance should be less than or equal to 2.0m. peaceFrom the operation layer (floor) scaffold surface height is over 2.0m, the width of working layer deck should not be less than: scaffold for 750mm in scaffolding for the clearance of 500mm. edge of the plank and wall should be more than 300 mm, and blocking foot clearance should be more than 100mm. when the side board is not close to the pole, should with reliable fixation.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range