Reinforced Concrete Hollow Core Slab Production Line

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
5 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Reinforced Concrete Hollow Core Slab Production Line

 

1.   Structure of Reinforced Concrete Hollow Core Slab Production Line:

 

Products of this series (non-circular and circular cored) are the ideal machines for making building materials on constructions of large span and heavy load bearing in factories, schools, hospitals, shopping centers, office building and homes.

 

Our hollow core slab machines have the advantages of reasonable design, easy operation, convenient maintenance and long working life. Slab length can be achieved to 4.2m to 18m; width of 600mm, 900mm and 1200mm; thickness of 120mm, 150mm, 180mm, 200mm, 250mm, 300mm, 380mm.

 

The hollow core slab machines are working on the long-line table, tensioning the high-strength and low-relaxation steel strand first, and using the pushing work method to form the concrete hollow core slab. The slabs which being formed have the advantages of smooth surface and high-density structure.

 

 2.   Main Features of Reinforced Concrete Hollow Core Slab Production Line: 

 

• One machine can make one slab lower cost, high Wear-resistant, long service life.

• In case of quality problem the company provide free replacement.

• Provide technical support for free.

• Provide consumers with regular visits

• Simple structure, easy operate, less wear parts

 

3.  Reinforced Concrete Hollow Core Slab Production Line Images:


Reinforced Concrete Hollow Core Slab Production Line

Reinforced Concrete Hollow Core Slab Production Line

Reinforced Concrete Hollow Core Slab Production Line

 

4.  Reinforced Concrete Hollow Core Slab Production Line Specification:

 

Type

Aperture & diameter

Number and diameter of wires

Max span

Total power

Productivity

(m/min)

Max. Load

(KN/m2)

Overall dimension

(mm)

Weight

(kg)

GLY180-1200

11/ peach

12/9.5or12.7

9

18.5

1.1-1.3

16.16

2900X1500x1200

3300

GLY200-1200

8 /peach

10/9.5or12.7

10

22

1.1-1.3

13.22

3700X1550X1550

5300

GLY250-1200

8/ peach

10/12.7

12.6

33

1.1-1.3

11.1

3700X1550X1500

6200

GLY300-1200

6 /peach

8/12.7

15

40

1.1-1.3

10.83

3700X1550X1500

6900

GLY380-1200

8 /rhomb

8/12.7

18

39.2

0.8-1.0

12.27

4600X1850X1600

7500

  

Production Process

 

Rebar tensioning

Reinforced Concrete Hollow Core Slab Production Line

 

Raw materials preparing

Reinforced Concrete Hollow Core Slab Production Line

Molding

Reinforced Concrete Hollow Core Slab Production Line 

 

5. Packing & Delivery

 

•  Wire cables are used for fastening the machine on the trailer or inside the container.

•  Machine covered with plastic film.

•  Machines can be packed in tarpaulin or wooden case according to customer’s needs.


Reinforced Concrete Hollow Core Slab Production Line

 

6. FAQ:

 

We have organized several common questions for our clients, may help you sincerely

•  What information we need to confirm with you before send a formal offer?

What kind of slab you want to make, wall panel, roof panel, lintel or something else?

Do you have exact slab size (slab thickness and width)? If not, please tell us the slab span, we will give you suggestion.

•  Have you use this kind of machine before? 

Our machine is totally different from European machine. Please don’t follow their instructions.

•  How long can we receive the product after purchase?

In the purchase of product, within 20 working days we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 35 working days can be served.

•  What kind of machine do you have?

Our main products: large span GLY concrete hollow core slab machine, light - weight wall panel machine, lintel machine, column machine, hollow core slab cutting machine, concrete feeding dumper, high-strength steel wire tensioning machine, which amount to more than the types and more than four hundred standards. We can provide the whole plan and technology supporting for concrete precast component. 

 

7. Why choose us:

 

•  30 years manufacturing experience.

Constitutor of the

•  More than 10 patents.

•  Passed ISO9001:2000 quality system certificate.

• More than 10 types of machine and over 100 models for choose.

 Supply complete set of technology and equipment solution.

• We can design and manufacture all kinds of concrete forming equipment according to customers' demands. Meanwhile we can even more provide our customers a complete set of technology and solution for all producing flow.

 

8. Our Service:

 

•  We supply the technical supporting all the time.

•  We supply one year warranty for whole machine.

•  We supply free quick wear parts. 

•  We supply low charge continue maintenance when warranty is expired.

•  We supply free training to end-users


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Presented here are selected transactions for Snow Company for 2012. Jan. 1 Retired a piece of machinery tha?
Jan. 1 Retired a piece of machinery that was purchased on January 1, 2002. The machine cost $66,300 on that date and had a useful life of 10 years with no salvage value. After 10 years the machinery is fully depreciated. Dr Accumulated Depreciation--Machinery 66,300 Cr Machinery 66,300 June 30 Sold a computer that was purchased on January 1, 2009. The computer cost $31,200 and had a useful life of 5 years with no salvage value. The computer was sold for $12,480. Six months of depreciation has accumulated since the beginning of the year. 31,200 / 5 x 6/12 = $3,120 to update depreciation Dr Depreciation Expense--Computer 3,120 Cr Accumulated Depreciation--Computer 3,120 31,200 / 5 x 3 1/2 = 21,840 total accumulated depreciation at time of sale Dr Cash 12,480 Dr Accumulated Depreciation--Computer 21,840 Cr Computer 31,200 Cr Gain on Sale of Computer 3,120 Dec. 31 Discarded a delivery truck that was purchased on January 1, 2007. The truck cost $53,000 and was depreciated based on an 8-year useful life with a $6,300 salvage value. (53,000 - 6,300) / 8 = $5,837.50 to update depreciation Dr Depreciation Expense--Truck 5,837.50 Cr Accumulated Depreciation--Truck 5,837.50 5,837.50 x 6 = 35,025 total accumulated depreciation at time of sale Dr Accumulated Depreciation--Truck 35,025 Dr Loss on Disposal 17,975 Cr Truck 53,000
Q:Have you ever driven heavy machinery like a fork lift?
I never have personally, but I work with people who drive them everyday. I work in manufacturing. There's a little tug machine I drive sometimes but its simple and more like driving a car than a forklift.
Q:Why might the machinery of war, set in motion by the assassination of Archduke Ferdinand, have been difficul?
one major reason was the complex net of political and military alliances . the actual antagonists. Austria and Hungry drew in all of Europe Wilson and America wisely wanted to stay out the British tricked USA with the 'zimmerman telegram' and the sinking of the civilian ship the Lusitania, which was carrying forbidden military suppies ( ammunition) to Britain. About the same time a relevolution was taking place in Russia, communists were involved and the West was terrified of anything like communism. America actually sent troops to fight in Russia AFTER WW I.
Q:Must everything be machinery?
Actually, very little is machinery. After a certain amount of time, even machinery is not machinery. No one can predict when a tractor will stop running. As soon as chaos is introduced, the machine metaphor becomes moot.
Q:Accounting Help! What is the acquisition cost for the machinery?
Acquisition Cost Accounting
Q:What equipment and machinery do you need for a printing on t-shirts business?
Well, it is possible you have chosen one of the most difficult businesses to theorize. Printing on t shirts can be done digitally, or using silk screens, or myriad other ways all of which have their benefits and drawbacks. Doing digital printing requires a machine that looks pretty much like a giant inkjet printer where the design is printed much like printing on paper with a few other details. I could go on and on but the homework is yours...
Q:I was wondering if a license from another country (say Ecuador) is valid here in the United States for operating heavy machinery?
Nope. Depending on where you live determining what u can do
Q:why are larger fields needed for machinery such as combine harvesters,tractors and ploughs?
Efficiency.
Q:I want to know information on beverage machinery !!?
hh
Q:What are the main considerations when choosing mechanical parts?
Heat treatment conditions, there is no heat treatment conditions and no heat treatment conditions of the election of different materials; the weight requirements, often mentioned in the hands of the parts require light, to meet the mechanical strength conditions can choose a small proportion of material, life requirements

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range