Q345 Ringlock Scaffolding Standard / Q345 Standard Scaffolding

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
50 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Q345 Ringlock Scaffolding Standard / Q345 Standard Scaffolding


Product description:

1.suitable for buildings like bridges, tunnels, large-scale construction projects, water conservancy project ,ship buildings, and so on.

2.latest wedge lock system is easy assembly and time saving. Due to its high stability and bearing capacity ringlock scaffolding is popular in the world.

3.made by high-strength welded pipe (48X3.0-3.5mm),which is durable and ensures the workers' safety.


Surface finishing: 

Hot Dipped Galvanized ( HDG) or zinc plate


Application:

Exhibition setup

Interior refurbishing

All the towers can be connected together for multi-purpose


Specification:

LengthWeight(KG)Material
330mm2.29Q345

500mm

3.20Q345
1000mm5.70Q345
1500mm7.85Q345
2000mm10.11Q345
2500mm12.80
Q345
3000mm14.70Q345
4000mm19.33Q345


Others Accessories:

Ledger, Standard( Vertical), Base Collar,  Steel Plank, Screw Jack etc. (Click to quick view).


Q345 Ringlock Scaffolding Standard / Q345 Standard Scaffolding

Q345 Ringlock Scaffolding Standard / Q345 Standard Scaffolding

Q345 Ringlock Scaffolding Standard / Q345 Standard Scaffolding

Q345 Ringlock Scaffolding Standard / Q345 Standard Scaffolding

Q345 Ringlock Scaffolding Standard / Q345 Standard Scaffolding

Q345 Ringlock Scaffolding Standard / Q345 Standard Scaffolding

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:a paintbrush falls from a scaffold takes 3 sec to hit the ground. How high is the scaffold? Explain pls!?
1) In three seconds the paintbrush accelerated to a speed of 96 feet/sec (ignoring air resistance) at a acceleration of 32 feet/sec/sec. 2) It started at a speed of zero, so the average speed for those three seconds was 48 feet/sec. 3) 3 seconds times 48 feet/sec. equals 144 feet.
Q:A 54.5 kg painter is on a uniform 23.0 kg scaffold supported from above by ropes .?
I am looking for as shown, as I am not psychic.
Q:What is the most important safety hazard at the construction site?
2 Closed management some of the site door does not set the corporate logo to enter the construction site staff wearing a work card is not complete
Q:significance to Hester viewing the crowd from atop the scaffold in the beginning (ch. 2) of the scarlet letter
maybe because her partner in crime was in the crowd and she didnt give- that takes some big balls
Q:what do you call a place of great significance? such as the scaffold in the Scarlet Letter?
Historical a place with alot of history attached to it Landmarks
Q:What is the distance from the external walls of the scaffolding and scaffolding?
Under normal circumstances, horizontal horizontal bar extension does not exceed 300mm
Q:What rights do I have as a tenant in regards to the scaffolding outside my window?
explain to your land lord the problems you are facing because of the old windows. i hope he understands you otherwise vacate the house and search for a new one. some companies also insurance for renters.go for it. i hope my answer helps you. all the best!
Q:How to do a good job of typhoon during the mass transfer mobilization work
Such as: all kinds of dangerous housing, plant, shed, temporary buildings (such as walls, etc
Q:2 painters are standing on a 5.0 mg long scaffold. Each painter weighs 833 N.?
Summing torques at the left cable T2*5-833*2-285*2.5-833*4.5=0 T2=1225 N Summing torques at the right cable T1*5-833*3-285*2.5-833*.5=0 T1=726 N Check 833*2+285-(1225+726)=0 It checks j
Q:Seeking real estate development project emergency rescue plan, the word asked a little more. Thank you
2 Hazard Analysis 21 Project Overview (omitted) 22 Hazard Source According to the characteristics of the project engaged in the project, the following projects are mainly mechanical equipment, electrical welding, aerial work and other construction

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range