Polyurethane Foam Sandwich Panel(width 950mm,100mm)

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m²
Supply Capability:
1000000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specifications

polyurethane foam sandwich panel 
1.Fireproof 
2.Heat Insulating 
3.Density:30-50kg/cbm 
4.Anti-corrosion

Polyurethane Foam Sandwich Panel

 

Roof PU sandwich panel
Wall PU sandwich panel

Name: PU(Polyurethane) sandwich panel;
Surface: Color coated or without color paint;
Material: Galvanized steel, galvalume steel, pre-painted steel, and aluminum;
Steel thickness: 0.2~0.8mm,
Total panel thickness: 30~100mm;
Cover Width: 950mm;

If you want to buy PU sandwich panel,please tell us


1. Thickness of steel, and thickness of total panel,
2. Color on the surface, or no color paint,
3. Zinc(AZ) coating of gavanized/ galvalume steel,
4. Density of PU material, (normally 40kg/m3)
5. Length to one piece,
6. Roof panel or wall panel,
7. Quantity of order,
8. Other requirements.

FAQ:

  1. Could be changed the size of panel?

    Yes, we could product according to the requirement of the costumers.

  2. What is the Minimum Production?

    4000 m2 x 1 day x8 hours.

  3. With whom we could contact directly?

    You could call or email to Ms.Carla Wang:

    Email: carlawang@okorder.com

    Mobil Nomber: +86 18511808895


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Color steel sandwich panel price table color steel sandwich board how much money a square meter
Sandwich panels, composed of two layers of metal panels (or other material panels) and directly in the middle of the panel foam, mature molding of the polymer core insulation composition, easy to install, light and efficient
Q:What kind of manual sandwich panels can be done? What is the difference between a manual sandwich panel and a mechanism sandwich panel?
Pipe pressure deformation, pressure relief pipe is not restored, the clamp inside the leather pad is not restored, there may be water seepage
Q:Air conditioning year after the addition of Calvary is not the reason for refrigeration
The system after spraying the rigid foam polyurethane insulation layer in the wall to form a continuous seamless overall, winter can avoid the heat bridge, greatly reduce the indoor heat loss; summer can greatly reduce the sun due to the external walls of the heat conduction, and then So that heating, air conditioning, energy consumption, energy saving effect is obvious, can reduce energy consumption, protect the theme structure, to extend the life of the building
Q:General color steel foam sandwich panels. How much a square is flat
Plywood is made of three or more layers of 1mm thick veneer sheet made of hot pressing Plywood is generally divided into 3mm, 5mm, 9mm, 12mm, plywood buy plywood by multi-layer single The plates are arranged in a crisscross arrangement The outermost front panel is called a panel, and the back is called a backplane The inner board is called the core plate Ask the question? The They said that the use of the shoe cabinet, wardrobe with a sandwich panel answer:
Q:Caigang sandwich panels do the roof ~ wall joints with how to do waterproof ~
The wall is relatively smooth, the external wall insulation per square meter with the mortar 4-foot often end of the shop to the whole shop 6 kg foot; wall is the wall, more mortar, a square need 7-9 kg
Q:50mm thickness of color steel foam sandwich board how much money a flat
To strengthen safety education, training and safety technology. Article 4 Special operations personnel shall, after obtaining the Special Operations Operation Certificate, carry out the corresponding work; the construction unit shall not arrange for the operating personnel who have not obtained the "special operation operation certificate" to engage in special types of work. Article 5 Special operations personnel shall strictly implement the special operating procedures and the relevant safety rules and regulations, according to the chapter operation, refused to illegal command. Article 6 special operations personnel should carry their own documents, consciously accept the employer, the safety management department of the supervision and inspection. Article VII of the special operations personnel operations, the accident hidden or insecurity factors, should be to the site safety management and the relevant person in charge of the report.
Q:Sun room roof was originally glass, so hot, want to add a layer of foam in the above sandwich panels, what sticky more solid anti-aging!
Polyurethane sandwich panel insulation good insulation, good overall stiffness, high bearing capacity, suitable for clean room, warehouse, commercial buildings, indoor and outdoor gymnasium, cold storage, indoor partitions and so on. Rock wool sandwich panels fire superior performance, sound-absorbing effect is significant, thermal insulation slightly inferior to polyurethane, but the price is cheaper than polyurethane, suitable for steel structure plant, simple activities of the roof or wall, air clean room ceiling and partition The
Q:What is the quota of the demolition of the color steel plate?
Answer: safety production laws and regulations, including safety in production (BE) A
Q:Color steel room life in general how many years
Safety information complete directory directory Chapter 1 construction site safety technical data management of the main content and requirements Section I construction site safety technical information management of the meaning of Section II of the construction site safety technology management system Section III construction site safety technology The establishment of the data Section IV of the construction site safety technical information classification The second chapter of the construction site safety management information Section I in progress construction safety supervision and related documents (the first file box) Section II safety production responsibility system (second file Box) Section III of the target management (the third file box) Section IV of the safe construction of the organization design (the fourth file box) Section V Division (sub-project) Safety Technology to the end of the (fifth file box) Section VI security check (The sixth file box) Section VII of the safety education (the seventh file box) Section VIII of the pre-class security activities (eighth file box) Section IX special operations certificates (ninth file box) Section X accident ( The eleventh section of the security box (the eleventh file box) Section XII security equipment and machinery and equipment related to the management of documents (tenth File box) Section XII mechanical equipment, facilities acceptance test records (thirteenth file box) Section XIV construction of temporary electricity (the fourteenth file box) Section fifteenth civilized construction (fifteenth file box) trade union Labor protection information
Q:What is the weight per unit area of 100 thick rock wool sandwich panels?
The development of safe electricity technical measures and electrical fire prevention measures. ⒋ construction site temporary electricity safety technology files: ⑴ temporary electricity construction organization design and modify the construction organization design all the information. ⑵ technology to the end of information. ⑶ temporary electricity inspection inspection table. ⑷ grounding resistance measurement records. regular inspection (complex) look-up table (site monthly, the company once a quarter). ⑹ earthen worship of the cut of the irrigation pipe tax japonica maintenance work records. ⒌ installation, repair or removal of temporary electricity projects, must be completed by the electrician, electrical grade should be consistent with the degree of engineering and technical complexity to adapt. Second, the electrician: ⒈ electricians must go through professional and safety technical training, by the (city) labor department examination issued a certificate of operation, the prospective independent operation. ⒉ electrician should grasp the basic knowledge of electricity safety and all equipment performance. ⒊ before the job as required to wear personal protective equipment. slightly....

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range