OEM Kwikstage System Kwikstage Scaffold Galvanised Kwikstage Standard Hot DIP Galvanised CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of OEM Kwikstage System Kwikstage Scaffold Galvanised Kwikstage Standard Hot DIP Galvanised
Type:
Material:
Construction Properties:
Lapping Form:
Framework:
Supporting Mode:
Erection Position:
Scaffolding Part Type:
Move Method:
Structural Style:
Place of Origin:
Surface:
Material.:
Thickness:
Descriptions of OEM Kwikstage System Kwikstage Scaffold Galvanised Kwikstage Standard Hot DIP Galvanised
Kwikstage Scaffolding is a multi-purpose modular scaffold system which can be used for all forms of access and support structures in the building and construction industries, ship buliding, offshore construction and industrial maintennace.
Details of Metal kwikstage Scaffolding
1. Metal kwikstage scaffolding system is a new type of selflock scaffolding which is very popular in Oceanian,African construction.
2. Metal kwikstage scaffolding System is suitable for both inside concrete slab supporting and outside masonry Construction multi-purpose for construction.
3. Metal kwikstage scaffolding systemstandard is weld with a plate every 600mm which can join ledgers at 90 degree.
4. Metal kwikstage scaffolding system ledger is a horizontal member with a blade at each end for insertion into the standard plate.
5. kwikstage scaffolding system is quick to erect and strip which has completely replaced other scaffolding.
The Accessories of OEM Kwikstage System Kwikstage Scaffold Galvanised Kwikstage Standard Hot DIP Galvanised
STEEL STANDARD
Material: steel tube φ48.3x3.25mm
Surface finish: hot dipped galvanized
Standard with normal length 3.0m, 17.02kg
Standard with normal length 2.5m, 14.32kg
Standard with normal length 2.0m, 11.64kg
Standard with normal length 1.5m, 8.94kg
Standard with normal length 1.0m, 6.26kg
Standard with normal length 0.5m, 3.56kg
Topper Standard, 1.72kg
Material: steel tube φ48.3x4.0mm
Surface finish: hot dipped galvanized
Standard with normal length 3.0m, 19.48kg
Standard with normal length 2.5m, 16.38kg
Standard with normal length 2.0m, 13.28kg
Standard with normal length 1.5m, 10.18kg
Standard with normal length 1.0m, 7.07kg
Standard with normal length 0.5m, 3.97kg
Topper Standard, 1.93kg
STEEL LEDGER
Material: Made of steel tube φ48.3x3.25mm
Surface: hot dipped galvanized
Ledger of 3.00m, 13.00kg
Ledger of 2.44m, 10.67kg
Ledger of 2.39m, 10.60kg
Ledger of 1.95m, 8.87kg
Ledger of 1.83m, 8.29kg
Ledger of 1.78m, 8.20kg
Ledger of 1.47m, 6.97kg
Ledger of 1.22m, 5.98kg
Ledger of 1.05m, 5.31kg
Ledger of 0.71m, 3.97kg
TRANSOM (ANGLE)
Material: Made of steel 5# angle
Surface: hot dipped galvanized
Transom 2.39m, 17.71kg
Transom 1.78m, 13.60kg
Transom 1.27m, 10.19kg
Transom 1.22m, 9.85kg
Transom 1.05m, 8.70kg
Transom 0.813m, 7.12kg
Transom 0.71m, 6.42kg
Transom 0.60m, 5.75kg
Transom 0.51m, 5.08kg
L/A Transom 1.8m, 11.78kg
L/A Transom 1.2m, 9.56kg
BRACE
Material: Made of steel tube φ48.3x3.25mm
Surface: hot dipped galvanized
Brace 3.6m, 15.33kg
Brace 3.2m, 14.00kg
Brace 2.7m, 12.25kg
Brace 2.0m, 9.33kg
Brace 1.6m, 7.99kg
STEEL PLANK
Material: Made of 1.8mm thickness pre-gal.steel sheet
Surface: hot dipped galvanized
Size: 229mm(W)x 66mm(H)
Steel Plank 4.00m, 25.30kg
Steel Plank 3.00m, 18.90kg
Steel Plank 2.44m, 15.37kg
Steel Plank 2.00m, 12.52kg
Steel Plank 1.81m, 11.42kg
Steel Plank 1.25m, 8.20kg
Steel Plank 1.05m, 7.05kg
Steel Plank 0.736m, 5.25kg
FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.
- Q:A 67.0- painter is on a uniform 21- scaffold supported from above by ropes. There is a 3.8- pail of paint to one side. The ropes are 1m inside the scaffold on each side. The pail is 1m away from the left rope and 3m from the right rope. The scaffold is a 6m. How close to the right end can he approach safely? How close to the left end can he approach safely?
- First of all...no units, no answer. Second of all...according to OSHA (Occupation Safety and Health Administration), NO ONE can walk on a scaffold beam outside the support ropes OR SET ANY OBJECT DOWN outside the support ropes. Hence the answers for both questions are 1 meter. It doesn't matter what a calculation will yield...NO ONE can walk on the beam outside the support ropes safely. Even if a torque balance yields that it will not put the ropes in compression and buckle them...it still isn't considered to be safe by OSHA if the painter is outside the ropes.
- Q:I've wanted an industrial/scaffold piercing for ages! My mum is finally looking into letting me have it done. Any advice about it? How can I hide it for school? What's the healing time? :) thank you for any feed back.
- Healing time is generally 6 months. It doesn't hurt to get it pierced but it's very sensitive after its pierced, DO NOT roll the bar around cuz you can damage the cartilage that way, and keep it super clean
- Q:Find the demolishing scheme of scaffold
- Removal methodThe development of the demolition plan, the program should include the removal of the steps and methods, safety measures, etc.. Demolition order should be observed from top to bottom, the first after the demolition, after taking the first demolition principle. That is, first remove the railings, scaffolding, scissors support, diagonal bracing, and then small beams, large cross bars, vertical poles, etc., and according to the principle of one step clear in order to be prohibited from top to bottom at the same time the demolition work. Remove the shelf of the high-altitude personnel should wear safety helmet, safety belt, wear soft shoes on the shelf, at the same time, around the railing or set up a warning sign and a special command, in order to avoid casualties.
- Q:Who has external scaffolding construction program
- Construction preparation1.1 parts1.1.1 pipe1 scaffolding steel pipe with Phi 48mm, wall thickness of 3.5mm; horizontal horizontal bar maximum length of 2200mm, the maximum length of other rods 6500mm, and the maximum quality of each steel pipe should not be greater than 25kg.2 the size and surface quality of steel pipe shall meet the following requirements:1 new steel pipe should have quality certificate, quality inspection report; steel surface should be straight and smooth, should not have cracks, scarring, stratification, dislocation, hard bend, burr, indentation and deep way;
- Q:What is rolling scaffolding?
- well rolling scaffoled is just what it says,its rolling scaffold.Some scaffold is set up in a way it is not movable,its ushally attached to a structure ,for safty.a rolling scaffold although its not as stable as attached ,its movable,it can be rolled along the area needed to be worked,often with men staying on it while its rolled.
- Q:Im hoping to get an industrial/scaffold piercing done at the very beginning of the summer holidays.Is it possible that they can be pierced with 2 separate pieces of jewellery rather than one bar.Also would it be healed in time to take it out once the holidays are over (6 weeks)??Please help??!?Thanks x
- Yep, some piercers prefer to do it that way. Just make sure you let them know that that's what you want when you go into the shop and they can accommodate you. No cartilage piercing is healed enough to remove in 6 weeks. Cartilage piercings can take anywhere from 6-12 MONTHS to fully heal.
- Q:Calculation method of complete scaffold
- Poetry cannot walk unless it is on the edge of the abyssNo matter where we are, there is always the earth, that is the eternal meeting;
- Q:I'm a civil engineering student and we were asked to submit a paper about designing a simple scaffolding. I just want to see a sample paper so that I would know what details should I include.
- can't draw here, but it's just an x with a flat board on top in 3 dimensions.
- Q:Standard Specification for bowl buckle scaffold
- A new type of scaffold developed in China
- Q:On Wednesday day I'm planning to get this done (the top piercing). I've been thinking about it for a while now really want it.What problems can I have with this piercing?How long does it take to heal ect?Thanks =)
- i've not had scaffolding but i've got a wide range of cartilage piercings and they take about 12weeks to heal... i would just say be careful not to catch it and keep it clean. good luck :)
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
OEM Kwikstage System Kwikstage Scaffold Galvanised Kwikstage Standard Hot DIP Galvanised CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords