Large UPS GP9335C 120-160KVA
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 2 Units pc
- Supply Capability:
- 60 Units per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specifications:
Model | GP9335C | ||||||||||
6p | 12p | 6p | 12p | 6p | 12p | 6p | 12p | 6p | 12p | ||
120KVA/108KW | 160KVA/144KVA | 200KVA/180KW | 300KVA/270KW | 400KVA/360KW | |||||||
380/400/415VAC 3-phase 4-wire | |||||||||||
50/60HZ | |||||||||||
±25% | |||||||||||
45Hz~65Hz | |||||||||||
0-100% 5-300settable | |||||||||||
>0.98(If harmonic filter is added) | |||||||||||
‹4.5%(If harmonic filter is added) | |||||||||||
-20%~+15% | |||||||||||
50/60HZ±10% | |||||||||||
380/400/415VAC 3-phase 4-wire | |||||||||||
±1%(Steady status),±3%(Transient status) | |||||||||||
50/60Hz | |||||||||||
±5% | |||||||||||
50/60Hz±0.01Hz | |||||||||||
0.9(Output 90kW per 100kVA) | |||||||||||
<5ms | |||||||||||
At 0.9 power factor, 110% for 1 hour, 125% for 10 minutes and 150% for 60s | |||||||||||
3ph 1.5ln for 5seconds,1ph 2.9ln for 5seconds | |||||||||||
1000% for 100ms | |||||||||||
With 100% balanced load | <1° | ||||||||||
With 100% imbalance load | <1° | ||||||||||
100% linear load | <1% | ||||||||||
100% non-linear load | <3% | ||||||||||
Up to 94% (inverter efficiency is up to 98%) | |||||||||||
1% | |||||||||||
≤1% | |||||||||||
0~40°C | |||||||||||
-25~70°C(Without battery) | |||||||||||
0~95% No condensation | |||||||||||
58-68dB | |||||||||||
IP20 | |||||||||||
Safety: IEC60950-1 IEC62040-1-1 UL1778 EMC IEC62040-2 CLASS C2 EN50091-2 CLASS A Design and Test IEC62040-3 |
- Q:How many power illuminator can 5Kva 36V transformer drive?
- By formula: P=UI COSAThat is, the transformer capacity is S=UI=5KVAHow big is the COSA?. Look, what kind of illuminator do you use?. Usually take 0.8-0.9It can be calculated that P is about 4KW-4.5KW (general lighting)
- Q:3 24V100W lights, I need to use a large capacity transformer (220V change 24V)?
- The bulb is used in the two luminescence tube combined type lamp holder, the calculation process is very complex. Different combinations, the secondary voltage is different. Because it is a DC ignition, but also consider the efficiency of rectification, but the total power is constant.
- Q:1000 square meters low voltage.36 volts lighting power supply with multiple transformers and wires
- You must know the quantity and power of the lamp to determine the transformer
- Q:How to calculate the rated capacity of small transformers for lighting purposes?
- If the flow of large capacity motor starting current and welding machine, large current flows in a short period of time in the load even when the power equipment capacity can withstand current flow in a short time, but due to a voltage drop excitation electromagnetic switch relief, the motor can not start, damaged or the undesirable phenomenon of welding. Therefore, the voltage drop rate should be calculated as less than 10% of the supply voltage, as calculated below.
- Q:Does the lighting work properly? Doesn't that power equipment start voltage unstable?
- The transformer that power supply company manages, it is to supply motive power and illumination generally, namely the lighting transformer that does not have special illumination to illuminate. Units of their own transformers, is generally the case. The utility model has the advantages that the transformer and other equipment can be fully utilized, the efficiency is high, and the external power supply circuit does not need to be divided into power transmission lines and lighting circuits, and is simple and orderly, and the cost is low. As for the price of electricity, it is usually negotiated a power and lighting each percentage of the electricity to calculate and receive.
- Q:Why is elevator lighting transformer installed?
- Is that the kind of 220V change 36V ah, if it is that kind of thing, I think it should be for security reasons. After all, 36V is a safe voltage. The damage to humans is slightly smaller than that of 220V.
- Q:What's the function of the lighting transformer?
- Applies to some requirements for safe voltage 24V - 36V lighting sites. Such as: basement, tunnel, dangerous goods warehouse and so on. Then there is the (mobile, temporary) safety lighting for the overhaul.
- Q:Please tell me how to calculate the transformer in the lighting circuit of elevator shaft in building electrical design
- Because of the brightness of the 36V safety voltage lamp brightness in the overhaul work is not enough, so now the well lighting design should not be 36V, and replaced by 220V, and only need to add a leakage protector on it.
- Q:How to use digital multimeter to detect the quality of 36 volt low voltage lighting transformer?
- General digital multimeter has a capacitor (some of the files with a million capacitance test table of Jack, some use pen)
- Q:Why the 21 lighting transformer must double winding type safety isolating transformers, prohibited the use of autotransformer.
- The self winding transformer is connected by all its windings, and depends on the position of the sliding contacts to change the magnitude of the voltage. Therefore, there is not only a magnetic connection between the primary winding of the autotransformer (the power circuit) and the two winding (the power supply circuit), but also the direct connection of the circuit. It forms a circuit with the earth, so it can not be used as the power source of the safety voltage
1. Manufacturer Overview |
|
---|---|
Location | Guangdong,China (Mainland) |
Year Established | 2006 |
Annual Output Value | US$10 Million - US$50 Million |
Main Markets | 9.09% North America 9.09% South America 9.09% Eastern Europe 9.09% Southeast Asia 9.09% Africa 9.09% Mid East 9.09% Eastern Asia 9.09% Western Europe 9.09% Southern Europe 9.09% South Asia |
Company Certifications | UPS CE UG/UX 1K; UPS CE (UG/UX) 2/3K; standards organisation of nigeria soncap; Soncap UX6K |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Shenzhen China |
Export Percentage | 61% - 70% |
No.of Employees in Trade Department | 11-20 People |
Language Spoken: | English, Chinese |
b)Factory Information | |
Factory Size: | 10,000-30,000 square meters |
No. of Production Lines | 10 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range | Low and/or Average |
Send your message to us
Large UPS GP9335C 120-160KVA
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 2 Units pc
- Supply Capability:
- 60 Units per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords