Hot Dip Galvanized Joint Pin 36*1.5*235 for Scaffolding CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 300000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description of Hot Dip Galvanized Joint Pin 36*1.5*235 for Scaffolding.
Material :Q195 Steel
Size : 36*1.5*235
Surface treatment :galvanized
Color : silver
Diameter:36mm
Package: By pallet
Hot Dip Galvanized Joint Pin 36*1.5*235 for Scaffolding Futures:
Scaffolding joint pin connects rods up to down and make sure standard uniform stressed and structure stabilized.
Rods cost less steel with reasonable use of material. This stable structure is cost-saving in steel consumption and high in bearing capacity.
Standard size and reasonable structure
Beautiful and durable
Easy for assemble and dismantlement
We can offer the Joint Pins for Scaffolding as the following (OEM accepted also):
What are the advantages of your products?
Experience: over ten years in scaffolding manufacturing.
Quality: Certified by SGS, BS1139, EN74, Local Test Report.
Price: Moderate, Reasonable.
Service: Friendly and Responsible. OEM service is available.
- Q:I've wanted an industrial/scaffold piercing for ages! My mum is finally looking into letting me have it done. Any advice about it? How can I hide it for school? What's the healing time? :) thank you for any feed back.
- Healing time is generally 6 months. It doesn't hurt to get it pierced but it's very sensitive after its pierced, DO NOT roll the bar around cuz you can damage the cartilage that way, and keep it super clean
- Q:What are the requirements for the construction of the scaffold eye in the building?
- SelectionThe project uses 48 mm, 3.5mm wall thickness steel pipe and the corresponding fasteners, dense mesh safety net, big eyes, etc.. Among them, the specification of the steel pipe is from 0.5m to 6m, and the fastener mainly has a rotating shaft, a cross and a joint fastener. Bowl buckle scaffold also uses Phi 48, 3.5 wall thickness of steel pipe and the corresponding fasteners, mainly with 1 x 1.0m, 1.2 x 1.2m, 1.5 x 1.5m and other specifications. Foot board mainly 2M and 3M two.
- Q:Okay so i have one cartilage piercing already.plan a) i just get a scaffold piercing using already the cartilage piercing i haveplan b) i get another cartilage piercing then just wait for a while get a straight titanium barbell and stick it in threw bothI also need help convincing my mom.Help Me Out Please Thnk You
- i'm no longer saying you're too youthful. yet a place that pierces with out I.D. oftentimes isn't very sparkling. i could purely ask your mothers and dads to take you to get 2 cartilege piercings (in view that it somewhat is particularly what it is). as quickly because it heals, you are able to placed a bar in it later. i do no longer see why a parent could techniques extra ear piercings on their infant. If it somewhat comes right down to it, you're able to do it your self. purely verify which you do purchase a piercing needle on line (new and interior the equipment) and be sterile approximately it. Use wiped sparkling rings.
- Q:Cantilever beam type scaffolding can not exceed the maximum number of not married
- An overhanging canopy should be the pillars of the non overhanging balcony canopy may be concave balcony, may also be the pillars of support (pretty much before the home house) pick style balcony canopy should be the cantilevered balcony canopy is not that direct pick out in the post
- Q:scaffold, where to buy?
- northern tools . 1800-556-7885
- Q:scaffolding business?
- scaffold /, -f(@)ld/ · n. 1 a raised wooden platform used formerly for public executions. 2 a structure made using scaffolding. · v. attach scaffolding to. – DERIVATIVES scaffolder n. – ORIGIN ME: from Anglo-Norman Fr., from OFr. (e)schaffaut, from the base of catafalque.
- Q:When putting up old scaffolding, a mistake was made and it had to come down.Long story short, the connectors between the vertical and horizontal poles (which were hammered in) are stuck.Any ideas for getting them out?Thanks.
- WD 40, angle grind off what you can.
- Q:1.How does Pearl react when Dimmesdale calls Hester and herself to mount the scaffold with him?
- The answer can be found in the novel The Scarlet Letter by Nathaniel Hawthorne. Read that and you'll have the answer!
- Q:Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
- The relevant provisions of the demolition of the external wall scaffold:First, the removal of scaffolding before the accurate preparation work should meet the following requirements:1, should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system, etc. are in line with the requirements of the structure;2, should be based on the results of the inspection to improve the construction organization design of the demolition order and measures, approved by the competent authorities before the implementation;3, should remove the scaffolding on the debris and ground obstacles.
- Q:I couldn't believe it, but yes it happened...
- With God all things are possible.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Hot Dip Galvanized Joint Pin 36*1.5*235 for Scaffolding CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 300000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords