Hot Dip Galvanized Ringlock Scaffolding/Construction/Scaffold Q235 CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Hot Dip Galvanized Ringlock Scaffolding/Construction/Scaffold Q235
Material:Steel
Construction Properties:
Lapping Form:
Framework:
Supporting Mode:
Erection Position:
Color:
Steel Grade:
Descriptions of Hot Dip Galvanized Ringlock Scaffolding/Construction/Scaffold Q235
Introduction
The revolutionary Ringlock System's node point ( Rosette) provide up to 8 connections in one place. The 4 narrow punched out holes automatically center the ledgers in correct dimensions and at right angles. The 4 wide holes permit alignment of ledgers and diagonal braces at angles required.
Standard
Use: Standards are the vertical members of ringlock scaffolding. They provide the
vertical support for scaffolding.
Material: High strength structural steel
Finish: Hot dipped galvanized
ledger
Use: Ledgers are the horizontal members of Ringlock scaffolding. They provide horizontal support for loads and planks. Ledgers can also be used as mid rail and top or hand guard railsMaterial: High strength structural steel Q235
Finish: Hot dipped galvanized
Base collar
Use: The base collar is designed to "base out" the Ringlock scaffolding system sitting on top of the screw jack creating a lower node point.
Material: High strength structural steel Q235
Finish: Hot dipped galvanized
Features:
1) Quick erection: Ringlock scaffolding are all pre-measured and just a hammer is required when erection.
2) Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening.
3)Versatility: The revolutionary node point- rosette provides up to 8 connections in one plane, allowing the system scaffold highly adaptable for straight as well as curved structures, such as ship yards, power generation stations, petrochemical plants.
4) Low maintenance: The dip galvanized finishing will greatly last the life of the products, no paint required, antirust and anticorrosion.
5) Convenient in storage and transportation: Individual scaffolding parts can be packed in bundles for easy storage and transportation.
The Parts of Hot Dip Galvanized Ringlock Scaffolding/Construction/Scaffold Q235
DESCRIPTION | MATERIAL | QTY. (PCS) | W. T. (KG/PC) | SURFACE |
3.00m standard | Q345 48.3*3.2mm | 1.00 | 15.3 | Hot-dipped Galvanized |
2.50m standard | Q345 48.3*3.2mm | 1.00 | 12.9 | Hot-dipped Galvanized |
2.00m standard | Q345 48.3*3.2mm | 1.00 | 10.5 | Hot-dipped Galvanized |
1.50m standard | Q345 48.3*3.2mm | 1.00 | 8.1 | Hot-dipped Galvanized |
1.00m standard | Q345 48.3*3.2mm | 1.00 | 5.7 | Hot-dipped Galvanized |
0.50m standard | Q345 48.3*3.2mm | 1.00 | 3.3 | Hot-dipped Galvanized |
2.00m ledger | Q345 48.3*2.5mm | 1.00 | 6.8 | Hot-dipped Galvanized |
1.80m ledger | Q345 48.3*2.5mm | 1.00 | 6.2 | Hot-dipped Galvanized |
1.50m ledger | Q345 48.3*2.5mm | 1.00 | 5.3 | Hot-dipped Galvanized |
1.20m ledger | Q345 48.3*2.5mm | 1.00 | 4.4 | Hot-dipped Galvanized |
0.90m ledger | Q345 48.3*2.5mm | 1.00 | 3.5 | Hot-dipped Galvanized |
0.60m ledger | Q345 48.3*2.5mm | 1.00 | 2.6 | Hot-dipped Galvanized |
2.00*2.00m brace | Q235 33.5*2.3mm | 1.00 | 7 | Hot-dipped Galvanized |
1.80*2.00m brace | Q235 33.5*2.3mm | 1.00 | 6.7 | Hot-dipped Galvanized |
1.50*2.00m brace | Q235 33.5*2.3mm | 1.00 | 6.4 | Hot-dipped Galvanized |
1.20*2.00m brace | Q235 33.5*2.3mm | 1.00 | 6.1 | Hot-dipped Galvanized |
2.00*1.50m brace | Q235 33.5*2.3mm | 1.00 | 6.3 | Hot-dipped Galvanized |
1.80*1.50m brace | Q235 33.5*2.3mm | 1.00 | 6 | Hot-dipped Galvanized |
1.50*1.50m brace | Q235 33.5*2.3mm | 1.00 | 5.6 | Hot-dipped Galvanized |
1.20*1.50m brace | Q235 33.5*2.3mm | 1.00 | 5.2 | Hot-dipped Galvanized |
0.90*1.50m brace | Q235 33.5*2.3mm | 1.00 | 4.9 | Hot-dipped Galvanized |
0.60*1.50m brace | Q235 33.5*2.3mm | 1.00 | 4.7 | Hot-dipped Galvanized |
2.00*1.00m brace | Q235 33.5*2.3mm | 1.00 | 5.8 | Hot-dipped Galvanized |
1.80*1.00m brace | Q235 33.5*2.3mm | 1.00 | 5.4 | Hot-dipped Galvanized |
1.50*1.00m brace | Q235 33.5*2.3mm | 1.00 | 4.9 | Hot-dipped Galvanized |
1.20*1.00m brace | Q235 33.5*2.3mm | 1.00 | 4.5 | Hot-dipped Galvanized |
0.90*1.00m brace | Q235 33.5*2.3mm | 1.00 | 4.1 | Hot-dipped Galvanized |
0.60*1.00m brace | Q235 33.5*2.3mm | 1.00 | 3.8 | Hot-dipped Galvanized |
2.00*2.00m brace | Q345 48.3*2.5mm | 1.00 | 10.2 | Hot-dipped Galvanized |
1.80*2.00m brace | Q345 48.3*2.5mm | 1.00 | 9.8 | Hot-dipped Galvanized |
1.50*2.00m brace | Q345 48.3*2.5mm | 1.00 | 9.2 | Hot-dipped Galvanized |
1.20*2.00m brace | Q345 48.3*2.5mm | 1.00 | 8.8 | Hot-dipped Galvanized |
2.00*1.50m brace | Q345 48.3*2.5mm | 1.00 | 9.1 | Hot-dipped Galvanized |
1.80*1.50m brace | Q345 48.3*2.5mm | 1.00 | 8.7 | Hot-dipped Galvanized |
1.50*1.50m brace | Q345 48.3*2.5mm | 1.00 | 8 | Hot-dipped Galvanized |
1.20*1.50m brace | Q345 48.3*2.5mm | 1.00 | 7.4 | Hot-dipped Galvanized |
0.90*1.50m brace | Q345 48.3*2.5mm | 1.00 | 7 | Hot-dipped Galvanized |
0.60*1.50m brace | Q345 48.3*2.5mm | 1.00 | 6.6 | Hot-dipped Galvanized |
2.00*1.00m brace | Q345 48.3*2.5mm | 1.00 | 8.3 | Hot-dipped Galvanized |
1.80*1.00m brace | Q345 48.3*2.5mm | 1.00 | 7.7 | Hot-dipped Galvanized |
1.50*1.00m brace | Q345 48.3*2.5mm | 1.00 | 7 | Hot-dipped Galvanized |
1.20*1.00m brace | Q345 48.3*2.5mm | 1.00 | 6.2 | Hot-dipped Galvanized |
0.9*1m brace | Q345 48.3*2.5mm | 1.00 | 5.6 | Hot-dipped Galvanized |
0.6*1m brace | Q345 48.3*2.5mm | 1.00 | 5.2 | Hot-dipped Galvanized |
0.88m board bracket | Q345 48.3*2.5mm | 1.00 | 9.5 | Hot-dipped Galvanized |
0.60m base collar down | Q235 38.1*4.5mm | 1.00 | 4.4 | Hot-dipped Galvanized |
0.60m base collar up | Q235 38.1*4.5mm | 1.00 | 5.2 | Hot-dipped Galvanized |
0.24*2.00m Plank | DX51D-Z80 | 1.00 | 8.2 | Hot-dipped Galvanized |
0.24*1.80m Plank | DX51D-Z80 | 1.00 | 7.5 | Hot-dipped Galvanized |
0.24*1.50m Plank | DX51D-Z80 | 1.00 | 6.5 | Hot-dipped Galvanized |
0.24*1.20m Plank | DX51D-Z80 | 1.00 | 5.5 | Hot-dipped Galvanized |
0.24*0.90m Plank | DX51D-Z80 | 1.00 | 4.5 | Hot-dipped Galvanized |
0.50*2.00m Plank | DX51D-Z80 | 1.00 | 15.3 | Hot-dipped Galvanized |
0.50*1.80m Plank | DX51D-Z80 | 1.00 | 14 | Hot-dipped Galvanized |
0.50*1.50m Plank | DX51D-Z80 | 1.00 | 11.9 | Hot-dipped Galvanized |
0.50*1.20m Plank | DX51D-Z80 | 1.00 | 9.9 | Hot-dipped Galvanized |
0.50*0.90m Plank | DX51D-Z80 | 1.00 | 7.9 | Hot-dipped Galvanized |
FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.
- Q: How to solve the problem of scaffold pipe repair
- Easy to move, straightening, derusting, ash removal, painting can be completed on the same machine at the same time, labor saving, labor-saving, easy to operate, can be adjusted 48mm Phi - Phi 51mm of all types of steel pipe
- Q: What are the characteristics of disc scaffolding
- Disc scaffolding and scaffolding, for manufacturers, construction units, rental units refer to a scaffold, just two different names. The same scaffolding.
- Q: Also what 2 cell populations in the body that don't routinely undergo cell division
- The first one is vague. The answer could be the mitotic spindle. It might be kinetochore microtubules. It might be talking about the kinetchores on the chromosomes instead of the microtubules that attach to the kinetochores. It could possibly even be talking about the centromeres, though to me that seems less likely. Neurons in the adult brain (and mature muscle cells?) do not routinely undergo cell division.
- Q: The classification of scaffolding and the relevant provisions of the provisions of the installation, please explain professional, thank you
- 2, scaffolding construction should be appropriate qualifications for safety in production permit in accordance with the construction of the scaffolding for the implementation of special case of Wu erection qualification prohibited the construction team to set up construction, 3 steel tubular scaffolding steel tube, fastener, wall fittings etc. shall be in accordance with the "construction of steel tubular scaffold Safety specifications" (JGJ130-2001) requirements and factory certification, inspection report inspection qualified components for 4 steel tubular scaffolding, scaffolding operations engineering supervisor should strengthen inspection found the construction according to the special case of the implementation of existing safety accidents should be in accordance with the relevant provisions of the written instructions and construction units ordered rectification or stop two, construction scaffolding technology standard 1 basic requirements, the pole base (base plate) a malleable cast iron manufacturing and welding base two erection scaffold Wooden plate paving base pole again put into the base plate in the bottom area of the calculation and should be less than 2 degrees, the thickness of 50mm to cross the wooden shim plate adopts steel plate 2, using plywood as cantilever scaffold cantilever beam layer cantilever scaffold with cantilever beam or cantilever frame with steel cantilever beam should be prohibited (I-beam, channel) made of cantilever frame made from steel tubes connected by the fastener 3, operation layer, protective railing railing ramps block baseboard shall be erected outside the pole inside; rail height should be 1200mm; the railing height should be 600mm; in 180mm4, the block foot height should be within the framework of closed scaffolding laying scaffold should be at least two layers. Operation layer protective layer operation layer protective layer of scaffold safety net fallback
- Q: A scaffold is constructed by placing two supports under a 13 ft, 9 in (a) board weighing 84 lbs. The supports are each 2 ft, 8 in (b) from their respective ends. Two painters stand on the board; one weighs 158 lbs and stands 4 ft, 11 in (c) from the left end of the board. Where must the 222 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)please help!! thanks(:
- Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
- Q: I had my scaffold done on friday, and it's still very sore and swollen. My boyfriend's accidentally caught it a couple of times but not badly and i was wondering if the pain and swelling is normal and if there's anything i can do for it. I've been cleaning it with savlon and have been careful with it x
- If it gets worse you should swear loudly at yourself for being so stupid.
- Q: i have some ?'s on the scarlett letterWhat effect has the 7=year interval had on Dimmesdale ?
- you can see how weak morally dimmesdale is, because he keeps his hand over his heart all the time, and is constantly beating himself up over his crime. he whips himself in the closet, and brands himself with a scarlett a to match hesters. hester... when she first walks out on the scaffold she can be seen as defiant, as if she isn't ashamed of the embellished letter a she wears. the cottage she lives in is on the edge of the town, bordering the forest. towards the end of the 7 years, her actions can be seen as repent maybe for her crime: she is a self ordained sister of mercy, helps the poor and homeless, sews... and the a turns from adultery to able
- Q: I had my scaffold pierced yesterday and now it is swollen and red. Its throbbing and painful. I have cleaned it and applied ice and antiseptic spray.I don't own any sea salt.HELP ME! I'M SO TEMPTED TO REMOVE IT.
- Antiseptics are too harsh for a healing piercing, the pain, swelling and redness is completely normal. Stop using antiseptic and go to the grocery store to get some non-iodized sea salt, its only a few dollars and you can find it in the spice aisle where the regular salt is.
- Q: What heights do u need a harness for(had to repost as didnt explain correctly in last 1)
- OSHA says that you need guardrails, safety nets or a fall-arrest system if you're working or walking near an unprotected surface more than 6' above a lower level.
- Q: Okay so I got a scaffold piercing about 5 days ago now. I've been cleaning it with Claire's piercing stuff. What I do is I pour it onto a little bit of loo roll and squeeze it all out on where the holes are. I have not been twisting it at all, but my friend told me that I should soak it in warm salty water and twist it twice a day. I have no idea what to do now as I have researched it and some people say that I shouldn't twist it because it will drag more bacteria into it and could get it infected. Also I have massive scabs around both ends of the bar, I've tried to pick them off as they are pretty uncomfortable, but it didn't work as they are rock solid, so how do I get these off? I have no idea what to do, my piercer didn't say anything about twisting it just cleaning it twice a day. Oh and if it helps I'm 13:) Thanks. X
- Why are you using Claire's crap? You need to be doing sea salt soaks twice a day for 5-10 minutes each soak with 1/4th of a teaspoon of non-iodized sea salt to 8oz of hot water. Don't twist them as that drags in crust and bacteria and tears up the inside of the piercing. Stop trying to pick stuff off from your ear and go have a reputable piercer check out the scabbing, it could be crust it could be something wrong. If your piercer didn't tell you to do sea salt soaks to keep it clean go to a better piercer.
Send your message to us
Hot Dip Galvanized Ringlock Scaffolding/Construction/Scaffold Q235 CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords