• Hollow glassInminated Glass A float hollow glass. Two. Hollow toughened glass Three coated hollow glass. Four.LOW-E hollow glass System 1
  • Hollow glassInminated Glass A float hollow glass. Two. Hollow toughened glass Three coated hollow glass. Four.LOW-E hollow glass System 2
Hollow glassInminated Glass A float hollow glass. Two. Hollow toughened glass Three coated hollow glass. Four.LOW-E hollow glass

Hollow glassInminated Glass A float hollow glass. Two. Hollow toughened glass Three coated hollow glass. Four.LOW-E hollow glass

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
200000㎡ m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

we introduced the advanced production lines (with automatic coating removing, automatic sealing system) and equipped with reverse osmosis deionized water preparation and storage equipment, automatic aluminum spacer bending equipment, low-e glass coating removing equipment, which is able to produce all kinds of specifications of insulating glass for customers. The production lines that are equipped with automatic vertical sealing system, abandon the disadvantages of traditional horizontal sealing (there will be no patch phenomenon), make the processed insulating glass more flat and smooth..

Insulating glass size specifications:

Maximum processing size: 2440 mm * 3500mm

Minimum processing size: 200 mm * 200 mm

Aluminum spacer specifics: 6 mm, 9 mm, 12 mm, 16 mm

Glass thickness: 3 mm to 19 mm


Insulating Glazing

A.  All glass can be processed before assembly




B.  Glass transfer onto the glass loading machine



C. Edge coating removing of coated glass


D.  Wash and clean strictly


E.  Automatic bending for air spacer


F.  Automatic molecular sieve filling

G. Automatic butyl rubber applying



H. Automatic framing


K. Automatic scanning positioning

L.  Automatic double sealing

M. Transfer by sucking disc


N. Conner finishing

O.  Glass on the shelves till solidification



P. Customized wooden cases according to the size of glass

Q. Transfer the glass into the specific wooden cases

R. Leading Time:10 days for an average area of 1000 square

   meters tempered glass

S. Trade terms: FOB and CIF.

T. Payment Terms: By TT, 30% deposit to start producing,

  full amount balance paid before delivery.

U. The container loading after the package checking


Q:Find the role of several new glass features, to concentrate a little Hurry Short point, a little concentration, tomorrow to use acridine!
Flat glass is not processed by other flat glass products, also known as white glass or clean glass. According to the production method is different, can be divided into ordinary flat glass and float glass. Flat glass is the largest in the building glass, the most used one, mainly for doors and windows, from lighting (visible light transmission than 85% 90%), enclosure, insulation, sound insulation and other effects, but also further processed into other technical glass The original film.
Q:I have been laid off my job of 26 years doing exactly this. I would like to look into teaching at a community college passing my skills onto others. Any advice?How much do you think I could expect to get paid?Thanks in advance!
For quickest assessment of opportunities, check out your future competitors. Find shops that now teach stained glass classes. See their brochures, ads and prices. Take from the best from several...then advertise around town using a simple 8 1/2 X 11 inch flyer placed everywhere...supermarkets, library, in free paper racks (stuff the copy into the Weekly) and on windshields. I went to a class a few years ago, and loved the course work. It was once weekly for 6 weeks. If you need help with ideas on advertisements that pop, go to Barnes & Noble and browse the slick AD trade Mags. Brevity and flair with harsh color contrast will likely click. Start a stained glass info-blog. Write an article about yourself, and this will be picked up by a Features Editor who realizes that the source for endless living beauty is found in stained glass. If you need forever-fuel to propel you...visit Florence, Italy. You'll probably stay there. Good luck!
Q:what is an ideal roof for a steel framed building with glass cladding?
The glass cladding choice has nothing to do with the kind of roof chosen for a steel framed building. I am assuming that when you use the term "cladding" it has a specific meaning to architects and engineers. It does not mean that the roof has glass skylights. Cladding is the siding along the vertical face of the building. The roof materials and framing system chosen has absolutely no bearing on the the cladding system chosen.
Q:I do building glass exports, do not know how to find customers, do architectural glass, the target customers should be what? I am talking about the target customer! Trouble
Shandong Province to do professional curtain wall doors and windows glass, indoor glass partition, safety fire glass
Q:What is the principle of self-cleaning of self-cleaning glass? Why is it called self-cleaning glass?
Broadly speaking, self-cleaning glass is the ordinary glass in a special physical or chemical treatment, so that the surface of the unique physical properties, so that the glass is no longer through the traditional manual scrubbing method to achieve the effect of cleaning glass. The surface of the glass like a lotus leaf, the water on its surface will form a drop of water down, so dirty is not easy to attach up to achieve self-cleaning function of the glass. This type of cleaning nano-technology self-cleaning agent is a typical representative: ECOFRIEND-ING4 nano glass self-cleaning products! Glass self-cleaning technology in the developed countries has been very popular in Europe and the United States on the market almost all of the glass must be self-cleaning type.Therefore, with the development of cleaning technology wave, ECOFRIEND-ING4 nano glass self-cleaning agent this cleaning revolution "leader "Came to China, to the Chinese bath room to bring environmental protection, health and safety of the new concept of scientific development!
Q:Building glass curtain wall energy-saving projects using the material re-inspection requirements
Curtain wall energy-saving projects in addition to the general requirements of the curtain wall for re-inspection of the material, but also should increase the performance of the following materials for re-inspection: thermal insulation material thermal conductivity, density; curtain wall glass visible light transmittance, heat transfer coefficient, Insulating glass dew point; insulation profiles of the tensile strength, shear strength.
Q:What is the main part of the safety glass used in the building?
The location of the building requires the use of safety glass: "Regulations for the management of glass for building safety" (as of January 1, 2004) enumerated the use of safety glass in the following parts where the building requires glass as a building material. (A) 7 and 7 above the building outside the window. (B) a window glass or glass bottom (area) larger than 1.5 m2 (the glass is assembled in the frame, the light transmission part of the glass and the glass installation material covered by the opaque part of the line) from the final decoration surface less than 500mm floor window. (3) curtain wall (except for the whole glass screen). (D) tilt the installation window, all kinds of ceiling (including skylights, lighting roof), ceiling. (5) sightseeing elevator and its outer Wai Wai. (6) indoor partition, the screen. (7) Stairs, balconies, platform corridors and midday guardrail panels. (8) Floor panels used to withstand pedestrian walking. (9) the entrance of the public building, foyer and other parts (including 1, door glass 2, installed in the door above the glass 3, installed on both sides of the door glass, close to the door opening of the vertical side and the door opening distance is less than 300mm). (10) vulnerable to impact, the impact of other parts of the body caused by injury
Q:What is the material of the protective film in the middle of the glass
Tempered glass film with the raw materials are generally Japan's Asahi pin and domestic Los glass, The production process is: 1: open material, the whole glass is cut into larger than the size of 0.6mm small pieces. 2: CNC carved, will open a good piece of gold with steel sand grinding head down, drilling (or slot), CNC carved after the glass was formed 3, flat grinding, mainly dealing with open materials and CNC caused by surface scratches. 4: cleaning, with ultrasonic cleaning machine will be washed, while the glass drying. 5: steel, with potassium acid to strengthen the glass, so that the glass stress, strength, resistance to meet certain requirements. 6: cleaning: the tempered glass into the ultrasonic cleaning. 7: posted AB glue 8: Packaging finished product
Q:Why does the heated glass burst?
Building Rewan glass is mainly used for building interior and exterior decoration, lighting roof, sightseeing elevator, arched corridor, etc. Civil Rewan glass is mainly used for glass furniture, glass aquarium, glass ...
Q:Worried about the bathroom glass will blew, paste the security film can be resolved?
Generally can not burst, if you worry about the ordinary transparent tape can be posted, and very useful. Safety film and the role of ordinary tape is not much difference.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords