• Forged Formwork Nut with Square Plate System 1
  • Forged Formwork Nut with Square Plate System 2
  • Forged Formwork Nut with Square Plate System 3
  • Forged Formwork Nut with Square Plate System 4
  • Forged Formwork Nut with Square Plate System 5
Forged Formwork Nut with Square Plate

Forged Formwork Nut with Square Plate

Ref Price:
$5.00 / pc get latest price
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
1000 pc
Supply Capability:
2000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Forged Formwork Nut with Square Plate Plate

Forged formwork nut  is accessories of the scaffolding productions , it is usually made of C45 steel material , The production technology can be forging or prssed  , With the development of the construction , the forged scaffolding formwork nut has become  more and more popular. 

 

Strong ability of resistance to deformation, for different manufacturing process, It can resistant deformation, ensure the product safety and effective use of repeated; Strong anti-sliding performance, joint area is large, fasteners and overcomes the cast iron steel tube a point or line defect of joint, remove of steel pipe slip hazard.

2.Main features of Forged Formwork Nut with Square Plate Plate

 Reliable performance

 Corrosion resistance

 Durable finish standards   

 Strong anti-sliding performance

 Manugacture 

 Good service 


3.Forged Formwork Nut with Square Plate Plate Images

Steel Galvanized Scaffolding  Forged  Formwork Nut with Square Plate

 

Steel Galvanized Scaffolding  Forged  Formwork Nut with Square Plate

4.Forged Formwork Nut with Square Plate Plate Specification

 Raw Material: C45

 Size: 17mm 

 Weight: 1.75 kg

 Certifies:, Element

 Technology : Forging 

 Surface treatment: Electro galvanized, Hot DIP galvanized, or painted

 Brand Name:FF

 Useage: connecting the scaffolding pipe

 OEM service offered

5.FAQ of Forged Formwork Nut with Square Plate Plate

Why you  choose  us ?

1)Highest quality -never use any equipment that is damaged or deteriorated in any way

2)Safety -inspect all equipment before using

3)Competitive price - factory suppler direct

4)We have strong engineering team that can give best solution for your project

5)Cutting -Edge product development

 Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances

 Our firm belief that our customer's success are the only guarantee of our success .


 

Package ?

All the products package are suit for the sea transportation, steel and wooden plate is usual,  if you need special   package, Pls contact me for detail, we will meet your demands.


Delivery Time ?

For one 20GP container, the delivery time is about 15-25 days,

For 1-5 20GP containers, the delivery time is about 15-50 days.

For more than 5 containers, pls contact me ,our engineer will give you a delivery plan.

 

Product Quality

1)  we can send you the samples for your checking our quality.

2)  If you have time ,we welcome your coming to visit our factory.

Q:Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
It is widely used in bridge engineering, tunnel engineering, workshop, elevated water tower, power plant, oil refinery... Support design and special plant, is also applicable to overpass span scaffolding, storage shelves, chimney, water tower and indoor and outdoor decoration, large concert stage, the background frame, stands, balcony frame, stairs, other party system, stage setting, sports watch station project.
Q:What are the safety requirements for the dismantling of construction scaffolding
(1) prior to the dismantling of the scaffold, the work instructions for the removal shall be prepared and submitted for approval according to the design approval procedure of the scaffold. No work instructions or safety measures are not implemented, it is strictly prohibited to dismantle the work.(2) prior to the removal of the work, the approved work instructions and construction plans shall be made to the site construction personnel. And should check the implementation of site safety measures.
Q:For the current stage of China's construction should not strengthen the specific meaning of scaffolding and support by way of the scaffolding and support the specific distinction and significance
The scaffold is outside the frame, it is characterized by relatively large height, shape, wind load and gravity load is; while the template bracket shape because the concrete component varies, the total height, gravity load, improper placement to lose stability, no need to calculate the wind load, etc..
Q:How to calculate the double wall scaffolding
The adjustment coefficient of the bearing capacity of the foundation: KC = 0.400;The average pressure of the bottom of the vertical rod foundation, P = N/A =84.900 kN/m2;Among them, the superstructure to the top surface of the axial force design value: N = 7.641 kN;Basal area (M2):A = 0.090 m2.P=84.900 = fg=200.000 kN/m2. Calculation of bearing capacity of foundation!
Q:Where can I source scaffolding steel/aluminium planks with rubber end caps?I am having much difficultly finding anything, can you assist?Thank you in advance.
Maybe something like a window washers scafolding planks...?
Q:Okay so I want to get either done, I just want to know which one is more painful. Not felling that nervous because I have had my nose and tongue done. I want to know which one is more painful and how to clean each of them. And also with the lip, is it more like the tongue with what foods you can eat and how hard it is to eat?
Everyone is different as far as what piercings they think hurt more or less, but based on my own experience, I'd say the scaffolding hurt more by far. Now, I've never had my lower lip pierced, but I had my upper lip area (I used to have angel bites), so I'd image it would have to be similar to the lower lip as far as pain, care, healing. As far as cleaning them, it's like most other piercings, where the best thing for you to use is warm sea salt water. But although everyone's different, the lip is going to be the faster healing of the two I'd say for basically anyone. The scaffolding takes up to a year to fully heal. The lip heals relatively fast;usually anything involving your mouth area heals quicker than other areas of the body-I'm sure you noticed how your tongue healed fast. Or even if you accidentally bite or cut anything involving your mouth, tongue, inside of your cheeks, etc., it heals faster than other areas. As far as the foods other aftercare with it, it is somewhat similar to your tongue in caring for it-just follow your piercer's instructions you'll be fine. Good luck!
Q:hi, i already have my cartlidge pierced on my right ear and thinking about getting a scaffold piercing on my left ear. will a scaffold piercing hurt more than my cartlidge piercing,,less,,or about the same???thanks answers apprecietedhope =] xx
Several people have told me it hurts about the same. I do not have one, sorry couldn't be more help than that.
Q:Was thinking of getting one. How much do they cost?
your okorder /... and they usually cost about 40$
Q:I plan to have a scaffolding or industrial piercing soon, but don't know where to go.Any suggestions and could you include the prices?x
Cost depends on the studio. It ranges from 20 to 45 pounds for each piercing, most common price is 25 pounds for each piercing, high quality titanium or stainless steel jewelry included. The industrial is 2 piercings in one so : 25 + 25 = 50 pounds, jewelry included.
Q:I couldn't believe it, but yes it happened...
yea I can believe that. There have been people who have survived jumping out of planes at ten thousand feet. One guy landed in a snow bank and I think another hit a tree and I guess it was some kind of pine and the branches slowed him down.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords