Steel Galvanized Scaffolding Forged Formwork Nut

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
2000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

1.Steel Galvanized Scaffolding  Forged Formwork Nut 

What is  forged formwork nut  ?

Forged formwork nut  is accessories of the scaffolding productions , it is usually made of C45 steel material , The production technology can be forging or prssed  , With the development of the construction , the forged scaffolding formwork nut has become  more and more popular. 


Function of the forged formwork nut 

Steel Galvanized Scaffolding  Forged Formwork Nut  used to connect screw tie rod for conceret formwork buliding tower , It used in buliding construction   site  .The common size is 17mm   suitable for 17mm screw tie rod . It can bear pressure on horizontal and leverl direction 


Advantage of  forged formwork nut

Strong ability of resistance to deformation, for different manufacturing process, It can resistant deformation, ensure the product safety and effective use of repeated; Strong anti-sliding performance, joint area is large, fasteners and overcomes the cast iron steel tube a point or line defect of joint, remove of steel pipe slip hazard.


2.Main features of Steel Galvanized Scaffolding  Forged Formwork Nut 

 Reliable performance

 Corrosion resistance

 Durable finish standards   

 Strong anti-sliding performance

 Manugacture 

 Good service 


3.Steel Galvanized Scaffolding  Forged Formwork Nut    images 

Steel Galvanized Scaffolding  Forged Formwork Nut

Steel Galvanized Scaffolding  Forged Formwork Nut

Steel Galvanized Scaffolding  Forged Formwork Nut






4. Steel Galvanized Scaffolding  Forged Formwork Nut  Specification

 Raw Material: C45

 Size: 17mm 

 Weight: 1.75 kg

 Certifies:, Element

 Technology : Forging 

 Surface treatment: Electro galvanized, Hot DIP galvanized, or painted

 Brand Name:FF

 Useage: connecting the scaffolding pipe

 OEM service offered



5.FAQ of Steel Galvanized Scaffolding  Forged Formwork Nut 

Why you  choose  us ?

1)Highest quality -never use any equipment that is damaged or deteriorated in any way

2)Safety -inspect all equipment before using

3)Competitive price - factory suppler direct

4)We have strong engineering team that can give best solution for your project

5)Cutting -Edge product development

 Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances

 Our firm belief that our customer's success are the only guarantee of our success .

 


Package ?

All the products package are suit for the sea transportation, steel and wooden plate is usual,  if you need special   package, Pls contact me for detail, we will meet your demands.


Delivery Time ?

For one 20GP container, the delivery time is about 15-25 days,

For 1-5 20GP containers, the delivery time is about 15-50 days.

For more than 5 containers, pls contact me ,our engineer will give you a delivery plan.

 

Product Quality

1)  we can send you the samples for your checking our quality.

2)  If you have time ,we welcome your coming to visit our factory.

 




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Seeking for the safe construction scheme of mobile scaffolding!
Wall point setWhen the height is not less than 6.0m, you must set the uniform distribution of wall, its setting should meet the following requirements:Door type steel pipe scaffold: when height is less than or equal to 20m, less than 50m2 of a wall, and even the vertical spacing wall point should be less than or equal to 6m; when the frame of high >20m, not less than 30 M2 a point, and even the vertical spacing wall point should be less than 4m.The other floor (or bottom bracket) scaffolding frame: when high than 20m, a point of not less than 40m2, and even the vertical spacing wall point should be less than or equal to 6m; when the high frame >20m, a point of not less than 30m2, and even the vertical spacing wall point should be less than 4m.The free height of the upper wall of the scaffold is not more than 6m.
Q:Can anyone give a very brief description on all three scaffold scenes in The Scarlet Letter?
oh dang u have to read that story too ! man i had to read it and watch the movie ! so boring. What grade are u in ?
Q:Erection of scaffolding accessories
Scaffolding is the door frame, a cross support, connecting rods, hanging button scaffold or horizontal frame, etc. the basic structure of the lock arm, and then set the horizontal reinforcing bar, scissors, sweeping rod, sealing rod, bracket and the base, and the use of a standard wall connecting piece is connected with the main structure of the building standard steel pipe scaffold. Steel pipe scaffold can not only be used as an external scaffold, but also can be used as scaffolding or full scaffolding.
Q:The relevant provisions of the demolition of the external wall scaffold:
Three, discharge should meet the following requirements:1, the structure is strictly prohibited to throw to the ground;2, transported to the ground should be timely inspection of the construction parts, repair and maintenance, and according to the varieties, specifications at any time yard storage.
Q:How Long Will My Scaffolding/Industrial Piercing Take To Stop Being Sore?
No, actually, it takes 8-12 MONTHS to heal, by your 8-12 weeks I'm going to guess you went to the mall? Well, first of all, the gun uses blunt force trauma and a dull stud to rip a hole through your ear, plus that 'cleaning solution' is crap and will delay healing. There's a good chance it shattered your cartilage, so you could be in pain for months like I was (2 months of extreme almost constant pain, another 3 of dull aches with extreme pain when ever something brushed it and a final 6 of pain just when something touched it). So, yeah...get ready for the long haul.
Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-9, 5, GB/T3091-200
Q:What is the importance of the second scaffold scene in the Scarlet Letter?
It is less about Hester because she has accepted her punishment. It is more about Dimmesdale.
Q:looking for a scaffolding job in dubai can anyone help?
Hi okorder.com, we are Dubai based scaffolding contractor.
Q:What is the difference between Scaffolding and Zone of Proximal Development?
Taken from okorder: Vygotsky believed that when a student is at the zone of proximal development for a particular task, providing the appropriate assistance (scaffolding) will give the student enough of a boost to achieve the task. Once the student, with the benefit of scaffolding, masters the task, the scaffolding can then be removed and the student will then be able to complete the task again on his own.
Q:29 meters outside the walls of the house of the two rows of steel pipe scaffolding installation, demolition
Homework is two, while the long rod is 273m; small bar is 51; rectangular fastener 187; butt fastener 55; rotating fastener 17; a 7 foot board 14 square meters. You can use this to derive the amount per square meter. (average length of 5 meters).

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range