• Factory supply professional scaffolding ringlock system System 1
  • Factory supply professional scaffolding ringlock system System 2
Factory supply professional scaffolding ringlock system

Factory supply professional scaffolding ringlock system

Ref Price:
get latest price
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
500 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Material:
Carbon steel
Application:
Bridge,stage,boat,oil&gas
Surface:
Hot dipped galvanized
Feature:
mul-ti function,big capacity

 Factory supply professional scaffolding ringlock system

 

Product info:

Ring lock system is a typical formwork scaffolding system, consist of support part and operaion forwork. Since born of German LAYHER company in 80’s designs, it has been improved many times by scaffolders. Now it has been the most widely used and most trusted scaffolding products in construction field.

 

Feature

Ring lock system has lots of advantages basing its simple deisgn and structions.The more essential it is, the easier it is.
1.Fast. The connect parts are using plug pin to fit in, one hammer can complex all parts erection, erect fast and dave time, simple struction make erection is easy copy and trainned, after project finish or build another level forwork, also save time and manpower.

make bearing capacity can pass on. Strongen system capacity and stability. In the same capacity,ring lock use less material than other systems. Simple struction, easy errect, also easy trained ,save many manpower and time and costs.
2.Ring plates are in horizen lines,make bearing capacity can pass on. Strongen system capacity and stability, reduce the formwork fail rate.In the same capacity,ring lock use less material than other systems. Save project costing.
3.Solder points are fixed and high-precision, so this will make enterprices must run a set of standard included income material till finish products, use trained workers and automation machine to keep products in a good quality.Use standard service to lead standard products.
Welcome inquiry us for more detials.

 Product specification:

Part descriptionThicknesssThicknessLengerSteel GradeSurface
Standardφ48.3/φ603-3.25mm500-2500mmQ345Hot dipped galvanized
Ledger/Horizontalφ48.33mm600/900/1200/1500/1800/2100Q235Hot dipped galvanized
Level diagonalφ48.33mm\Q235Hot dipped galvanized
Brace/diagonalφ48.3/φ422.5mm\Q235Hot dipped galvanized

 

 Production applications:

Our this ringlock system is produce by us Gainford, got good control from income material to end products. Whole product system has big load capacity and multi function benifits, suitable for many usages, such as bridge  construction,boat building,outlook frame for building,railway construction,oil and gas projects and so on.

With it fast erection and good convinient, it could be use for stage, show platform, outdoor AD landmarks and so on.

Factory supply professional scaffolding ringlock systemFactory supply professional scaffolding ringlock systemFactory supply professional scaffolding ringlock system

 

Welcome send inquiry to us for more info, we glad to support you !

Q: There is a 5.0 kg pail of paint to one side, as shown. How close to the end can he approach safely? Express your answer using two significant figures. If there is more than one answer, separate them by commas.
I am looking for as shown, as I am not psychic.
Q: Will the equipment based on the beam column and other structures, can not be poured once completed, should be set up civil construction or fixed?
The following model for your reference, the project budget is to determine the project cost and work, material consumption of the document, is the basis for assessing the economic investment
Q: How to carry out fire inspection at construction site construction site (including information and site)
How to carry out fire inspection at construction site construction site (including information and site)
Q: Would like to ask you under the construction of the rainy season, what measures ah? Teach the next sprinkle
reasonable organization of construction arrangements, so that sunny day to pay attention to outdoor work, rain arrangements for indoor work
Q: Two painters are standing on a 5.0 mg long scaffold. Each painter weighs 833 N. 1 painter is standing 2.0 mg from the left end and 1 is standing .50 mg from the right end. The scaffold weighs 285 N. What is the tension in the 2 cables supporting the scaffold?
Summing torques at the left cable T2*5-833*2-285*2.5-833*4.5=0 T2=1225 N Summing torques at the right cable T1*5-833*3-285*2.5-833*.5=0 T1=726 N Check 833*2+285-(1225+726)=0 It checks j
Q: for 10 sq. meters = ? h/sq. m. and how many person need to do the job?
It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
Q: Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
A) Speed of falling brush = at =9.8 x 3.39 = 33.22m/sec B) Vertical distance Y = Vo x t - 0.5 x at^2 0 = Vo x 2 - 0.5 x 9.8 x 4 Initial Velocity = Vo = 9.8m/sec^2 Vertical height = Vo^2/2g = 9.8^2/2 x 9.8 = 4.9m
Q: Renovation of construction guidance? (Refers to the carpentry, painters, mud and other approach to the entry. Tooling)
First, into the construction site personnel safety production notes
Q: Seeking real estate development project emergency rescue plan, the word asked a little more. Thank you
In order to prevent the occurrence of production safety accidents at the construction site, improve the emergency working mechanism, in the event of the accident occurred in the project, the rapid and orderly emergency rescue work to carry out the accident, rescue the rescue project, the construction of the project site safety accident emergency plan The wounded, reduce the loss of the accident, the development of this plan
Q: Will the concrete cloth machine and the tower crane is different, long quite like Please explain the structure of the application, 3Q
Forearm (long horizontal part) with more than 125mm of the pipe, and there is drooping hose (a bit like elephant nose, huh)

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches