Cuplock Scaffolding,Scaffolding System,Types of Scaffolding System

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
100000 kg/month
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8617190086776

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Cuplock Scaffolding,Scaffolding System,Types of Scaffolding System


Quick Details

Place of Origin:

Tianjin China (Mainland)

Brand Name:

JinSheng

Size:

as request

Material:

Q195-Q235etc

Surface Treatment:

black or galvanized

Brand:

JinSheng

Minimum Order Quantity:

25 Ton

Origin:

Tianjin China

Port of Loading:

XingGang,China

FOB Price:

USD 1-10 Per Piece

Delivery Time:

Within 30days

Packing Details:

Packed in woven bags or pallet. 25 pieces one bag.

Cuplock Scaffolding,Scaffolding System,Types of Scaffolding System

Cuplock Scaffolding,Scaffolding System,Types of Scaffolding System

Cuplock Scaffolding,Scaffolding System,Types of Scaffolding System

Cuplock Scaffolding,Scaffolding System,Types of Scaffolding System



Packaging & Delivery

Packaging Detail:

Packed in woven bags or pallet. 25pieces one bag.

Delivery Detail:

Within 30days after receiving your advance payment or L/C

Specifications

1.Material: Q195, Q235, etc 
2.Advantage: easy combination, safety, stable. 
3.Surface:black or galvanized


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Skin growing over my scaffolding bar?
Yes it is bad if I looks as if it has the skin growing around it. I would see your piercer about that.
Q:Why is there so much unnecessary scaffolding in NYC?
Must belong to someone's cousin. Buildings need cleaning too.
Q:Shear strength of steel tubular scaffold
Your scaffolding erection, steel pipe type and so on?Give you an exampleDouble scaffolding, set up a height of 25.1 meters, vertical pole with a single riser. The vertical distance of 1.50 meters, the vertical rod of the distance of 0.85 meters, within the framework of the distance from the structure of the structure of 0.30 meters, vertical rod distance of 1.80 meters
Q:Physics question! A man stands on a scaffold...?
Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED
Q:how much does a scaffold piercing cost?
Cost depends on where you go. Pain depends on your pain tolerance.
Q:Where is bamboo scaffolding used in the USA?
best I can do ...maybe to give you some leads..... I would say china would be a major importer...
Q:What is the bowl buckle scaffold operating layer
It is divided into single and double scaffolding, double row with landing and cantilever type. Single row are generally used for landing. Its main function is to protect. Specific reference to JGJ 1302011 "construction fastener type steel pipe scaffolding safety technical specifications" in the relevant instructions, and illustrations.
Q:Industrial piercing(scaffold)?
Well you definitely need to use more than just warm water to clean it. Try using something like Provon soap and do sea salt soaks at least twice a day to keep it clean.
Q:What are the requirements for the foundation and foundation treatment of bowl - shaped steel pipe scaffolding
Landing bowl-scaffold when erecting height H is less than or equal to 20m according to the ordinary routine shelf erection, erection of a height when H > 20m and ultra high, heavy and large span of the template support system must make special construction design and structural analysis and calculation.
Q:Calculation method of bearing capacity of bridge bowl buckle scaffold
Assuming that the web is N, the calculated load is P=1.2*N+1.4*n (n)That support is a layer of a layer of wood longitudinal transverseThen calculate vertical

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range
客服
live chat