Cup-lock Scaffolding System for Shoring Formwork
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 50 m²
- Supply Capability:
- 1000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Cup-lock Scaffolding System for Shoring Formwork
Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.
It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.
2. Main Features of Cup-lock Scaffolding System for Shoring Formwork
Equipment of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.
Avoid using bolt in assembly and low down labor intensity
Reliable bending, shearing, torsional strength of dentition &cup-lock connection, the overall of it is more stable than normal
Not easy to lose fastener, portable firm and easy to maintain and transport
3. Cup-lock Scaffolding System for Shoring Formwork Images
4. Cup-lock Scaffolding System for Shoring Formwork Specification
5. FAQ of Cup-lock Scaffolding System for Shoring Formwork
1) What can we do for you?
We can ensure the quality of the Cup-lock Scaffolding System for Shoring Formwork and avoid extra expenses for customers.
We can provide you the professional technical team.
We can provide professional building proposal for your project.
Please feel free to customize.
2) What promises can be done by us?
If interested in Cup-lock Scaffolding System for Shoring Formwork, please feel free to write us for any QUOTE.
If need any technical and building assistance, we could provide on-site professional staff for instruction.
Please DO check goods when courier knocks your door and contact us asap if any issueS.
3) What about of our after-sale services?
Response will be carried out in 24hours after receiving any complain or request.
Any formwork cost can be refund after order is confirmed.
If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
Packing: wood package and adhesive tape
Shipping: by sea
Shipping time: Normally small orders just takes 7 business days to arrive your hand;. When it comes to the customs declaration, it may need 2weeks.
- Q:What kind of scaffolding used in engineering construction
- For construction and erection of the load borne by the fastener and steel pipe, such as the composition of the scaffolding and support, collectively referred to as (fastener) scaffolding.
- Q:What does it mean in the phrase that one can have toxic people in their life and still maintain stability as long as we build a scaffolding?
- As long as you have a firm structure of friends and family around you (like scaffolding round a construction site or building) you can withstand the presence of harmful, toxic people.
- Q:Standard Specification for bowl type scaffold steel pipe diameter
- According to the specification requirements of every three vertical and horizontal cross set with scissors support; height of more than 8 meters in the low to vertical, vertical and horizontal set of scissors. Generally speaking, the technical requirements of the roof beam, the coupling beam parts are independent support, whether the existence of suspension.
- Q:Fastener type steel pipe scaffold wall parts of the lateral spacing is less than the number of
- Should be less than or equal to 3 times the vertical pole of the scaffolding.
- Q:does it hurt more than just getting your lobes pierced or the same?i just got a my ears pierced (so now i have two lobe piercing on each ear) it didn't hurt.i'm not sure if i should get it or not.
- It is one of the more painful ear cartilage piercings and, as such, hurts more than getting your lobes pierced. It's also much more difficult to take care of. BTW: I love your Andy Warhol avatar. He's my favorite artist.
- Q:Attached to the lifting scaffolding installation site how to write
- The actual strength of concrete at the attachment structure has reached the design requirements of scaffold.
- Q:It's indoor. A night-job in a mall so it should be easily assembled/disassembled. What we use is the thin piped one which is too dangerous for 12 meters high.
- I don't know what you have to do and with how many people, but in case of easy assembly/disassembly, I'd recommend an Aerial work platform.
- Q:I got it done MONTHS ago and the bar is so tight on it,i have space in it, like i can move the bar up and down..just i cant get it out and its beginning to hurt me if i sleep on the side its on.. advice please?
- Stop sleeping on it and stop trying to pull it out - you're just going to irritate it doing that. If you feel you need new jewelry, go to your piercer. They can help you out.
- Q:Why the scaffolds need to be inspected within the preceding 7 days and after adverse weather condition?
- So you don't fall. The reason you want the inspection to be recent is that people change things when you're not looking. Or, the wind could move something that you're not expecting.
- Q:Bowl buckle scaffold is not a steel pipe scaffolding
- Bowl buckle scaffold with steel scaffolding is different
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Cup-lock Scaffolding System for Shoring Formwork
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 50 m²
- Supply Capability:
- 1000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches