Ring Lock Scaffolding System for Formwork Shoring Systems

Ref Price:
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
1000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Introduction:

 

Ring-lock scaffolding consists of cup-lock connector,post,cross bar,diagonal brace,base and top brace.Safe and convenient to operation,fast to assemble and dismantle,widely used in scaffolding construction,such as formwork scaffold and fitment construction.

 

Specifications:

 

 materialQ235,Q345

 tube size48.3*3.2mm 

 surfacinghot-dip galvanized

 the usual size0.5-3m

 

Main Features of the Ring Lock Scaffolding

 

  - Using less pipes

 - Easy to install

 - It can be used again and again for nearly 20years 

 - Easy to storage and transportation 

 - High degree of standardization

 - Easy and quick erection

 - Excellent stability and bearing capacity



Why choose us?

 professional scaffolding manufacturer

 timely delivery

 authorty certification

 one-stop technical support

 decades of years' experience

 strict quality management


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How can i use pump jack scaffolding on top of a pitch roof?
At that height you need support beams, scaffolding alone won't cover it.
Q:Scaffolding tube – How strong with a straight coupling?
The problem with your proposal is that you realise that the wind/rain could have an effect but chose to ignore the consequences if it occurs. 'Proper' scaffolding is designed and such an unsupported span would never occur in a 'normal' scaffold so the standard calculations would not work. There is also the possible effect on the walls, could they take an abnormal load? I would look at theatrical or music stage hire using trussed beams.
Q:Should I get a Scaffolding Piercing?
You can get one and to prevent it you have to clean the piercing with listerine a girl i know named myra she got a cauliflower because she cleaned it with alcholo and it looks so nastyyou need to clean it with listerine.
Q:Can you shorten the steps of the bowl buckle scaffold
The step distance of the bowl buckle steel tube frame must be determined through calculation; for example, the vertical distance of the vertical rod is 120
Q:Scaffold piercing question..Please help?
Mine really hurt, but I didn't scream. For the first few days I couldn't sleep on it, I noticed bubbles forming around the ends but, that's normal with piercings with cartilage. Make sure you go somewhere who uses the tube for the needle. When I went, since my ears were small, he used two different needles it lasted too long. But it wasn't worse than my tragus so, I was able to accept the pain.
Q:why is steel used in scaffolding?
The reason is simple.....Bamboo will bend in the event of a typhoon and is thus safer than steel scaffolding.
Q:What is a new type of scaffolding?
principleSocket type steel pipe scaffold with novel and beautiful, solid plug and socket welding steel as the connecting piece, Q235 steel shots component, the vertical rod is in a certain length of the rigid pipe at regular intervals on a socket welding (as shown below, the top structure) with 57 cylinder connecting rod. The cross bar is welded at the two ends of the steel pipe. The vertical rod is a vertical force member, and is composed of a horizontal rod and a tie. Connection point of the support, can withstand the bending moment, shear and torque, so as to form a space support structure is good overall stability.
Q:Which is faster and more convenient for the construction of the scaffold and bowl buckle scaffold
Wheel buckle scaffolding, the use of the scope of its current mainly used in the construction of the internal support template, belonging to the internal support frame, the use of bowl buckle scaffold is more widely used in some of the housing construction, bridge engineering has its figure
Q:Shear strength of steel tubular scaffold
The rail is made of steel plate, the load is 0.11kN/m, the safety net load is 0.0050kN/m2. Under the foot of the small cross bar on the top of the big bar, and a small bar between the main node. Basic wind pressure 0.35kN/m2, height variation coefficient 1.2500, shape coefficient of 1.1280. The standard value of bearing capacity of foundation is 190kN/m2, the basal area is 0.250m2, and the coefficient of bearing capacity is 1.
Q:Physics question! A man stands on a scaffold...?
Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range