Crane TC7050 Construction Equipment Building Machinery Distributor Sales

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC7050 Description:

1.CMAX Tower Crane TC7050  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7050 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7050 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7050  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7050  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7050 Parameter:

 Max. working range 70m, tip lifting weight 5T and Max. lifting weight 20T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、70

Min working range (m) 2.5

Max lifting capacity (t) 20

Tip load @ 50m (t) 5


Tower Crane TC7050 Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7050 Diagram:

Crane TC7050 Construction Equipment Building Machinery Distributor Sales

Crane TC7050 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC7050 Technical Sheet:

Crane TC7050 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC7050 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7050 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “50” means the tip load is :5 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Can you use a cymbal stand as a camera jib/crane?
The angle of the cymbal on the stand determines the amount of vibration being transferred to the stand. A cymbal on a boom arm verses a straight stand, a heavy tripod verses a lightweight base sounds drastically different. Boom stands can make some cymbals rumble. When boom cymbals stands are somewhat close to staight stands, arm placed close to 180 degree, the cymbal will rumble less.
Q:English Help Contrast the Effects of the War in Cranes, Thoughts of Hanoi, and Tokyo.?
I could not find Tokyo on the internet...I will look for it later because the first two selections were so good. I did find and read Cranes and Thoughts of Hanoi. The thing that struck me most was that they both had in the back of their minds, in their memories, the thoughts of childhood in their home countries, all its mysteries and beauties...and as well all the regular, daily life going-ons of the communities. It was all still alive to them in their mind, and indeed, in real life. Those same trees they climbed as children still grew. farmers still grew crops. Birds were still birds, wild and free, or caught and sold. War is so awful, so much death, I think you are astonished to find that life still goes on. Much changes yet much remains unchanged. The great wheel of life turns.
Q:Do you think that crane fly is still alive?!?
Crane flies are totally harmless. Don't worry about it.
Q:If you got the chance, would you buy paper cranes?
no why not justr learn how to make one its free
Q:Tower crane 5610 why is it called QTZ63?
Q is reusable, T is tower, Z is jack up, and combined is jack up tower crane. (this is the earliest known China, now the various manufacturers have their own name, some close to the French take, such as F0/23B, the tower jib 50 meters, a maximum weight of 10 tons, 2.3 tons of weight lifting arm tip)80 is the moment, the unit is t * m, (should say is the force multiplied by distance, 800kn.m) for 5613 cranes, the maximum lifting capacity of 8 tons, the boom length is 56 meters, arm tip lifting weight 1.3 tons, maximum weight in the range of 2.5 meters ---13 meters, calculation of 8 * 13=104, so the name is QTZ104, now the provisions should be a QTZ104, but before, people think is 8 tons of weight, so called QTZ80, is now available.
Q:How do they get the cranes and counterweights down off the top of buildings when finished?
Dereks, which are built along side of the buildings, actually take themselves apart. There is a jacking system which attaches to the segment that is 2nd from the top. This lifts the bussiness end of the crane off the top segment which can then be unfastened and lowered to the ground. The jacking system then replaces the crane on the new top, travels down one more segement and the process is repeated. It is actually cool to watch.
Q:How about the installation and disassembly of the tower cranes?
Authorized by the national security inspection department, the local special operations training school or the technical quality supervision bureau, after the study, assessment, qualification and graduation permit, will give you special operations installation, removal operation certificate.
Q:A crane lifts a 2.75x10^3N bucket containing 1.20 m^3 of soil (density = 2.00 x10^3 kg/m3)to a height of 6.95m?
Crane work = weight to be lifted x 6.95 m Weight to be lifted = 2.75x10^3 N + 1.20 m^3 (2.00 x 10^3 kg/m^3) (9.8) = 2750 + 23520 = 26270 Therefore, Crane work = 26270 x 6.95 = 182576.5 J
Q:How and where do they add parts to the crane to get it higher in order to make taller buildings?
search for others, animation and video of process more edit Some cranes actually climb the structure of the building and are taken apart when the building reaches its full height.
Q:Have you heard of Crane Coffee?
It won't expand if Starbucks have their way. They have driven all their competiton out of business. I hope Crane Coffee can survive.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range