• Crane TC6016 Construction Equipment Wholesaler Sales System 1
  • Crane TC6016 Construction Equipment Wholesaler Sales System 2
  • Crane TC6016 Construction Equipment Wholesaler Sales System 3
  • Crane TC6016 Construction Equipment Wholesaler Sales System 4
  • Crane TC6016 Construction Equipment Wholesaler Sales System 5
  • Crane TC6016 Construction Equipment Wholesaler Sales System 6
Crane TC6016 Construction Equipment Wholesaler Sales

Crane TC6016 Construction Equipment Wholesaler Sales

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC6016 Description:

1.CMAX Tower Crane TC6016  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC6016 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC6016 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC6016  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC6016  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC6016  Parameter:

 Max. working range 60m, tip lifting weight 1.6T and Max. lifting weight 10T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50.5

Max height with attachment (m) 200

Working range can be adjusted (m) 48、54、60

Min working range (m) 2.5

Max lifting capacity (t) 10

Tip load @ 50m (t) 1.6


Tower Crane TC6016   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC6016 Diagram:

Crane TC6016 Construction Equipment Wholesaler Sales

Crane TC6016 Construction Equipment Wholesaler Sales

Tower Crane TC6016 Technical Sheet:

Crane TC6016 Construction Equipment Wholesaler Sales

Tower Crane TC6016 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC6016 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “16” means the tip load is :1.6 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q:I will soon have folded my 1000th paper crane. What should I do with them after I am done?
Set them on fire somewhere safe and controlled. The fireplace? String them together and make a long chain to use like garland or streamers. Hang them from the stairs.
Q:i need a list of materials and a step by step precedure
I am assuming you mean a low power, miniature crane. You will want to wrap a iron object (a nail should work for light objects) in electrical wiring, the more times the better. Make sure you have a long length of wire after wrapping it around the iron object. Now, attach a rope to the iron object, this will be used to raise and lower it. The length of the rope has to be less than the length of the wires. Now, inside the crane have a battery. The stronger the battery, the stronger the electromagnet. Now, after connecting one of the wires to the battery, connect another one to a switch, then connect then switch with more wiring to the battery. This will turn the crane's claw on and off. The next part is up to you. If you want to be able to raise and lower the magnet, attach the rope to an axel and spin the axel to raise or lower the magnet. If you want to turn the crane, you need to place the arm on a swivel axis. Finally, to bring the magnet closer or farther, you will need a way to raise the arm, bringing the tip of the arm closer to above the center of the crane. I suggest you google some picture of cranes to understand this better.
Q:Jon and Paul are folding origami cranes. If Paul works alone he can fold 100 cranes in 5hours. together they can do the same job in 3 hours. how much time would it take for Jon to fold 100 cranes alone? Please show your work. :)
1/5 + 1/x = 1/3 == x = 15/2 = 7.5 h answer : 7.5 hours ++++++++++++++++++++
Q:It seems like every time I turn on the news there is another crane collapse. I don't know if it is the same problem every time, but it seems awfully suspicious. Does anyone know why crane collapses seem so common lately? Has it always been this way?
You okorder .. This chart is not definitive, it leaves out many occupations (such as mining), it only considers fatalities (not loss of limbs, etc.) but it conveys the general picture. For hard data look at: www.bls /iif/
Q:How to select tower crane type according to the height of building? Seek explanation
The building cornice height within 20m, the building area of each floor within 2000m2 with 800KN.m tower crane 1 units, each increase of less than 1600m2 800KN.m 1 tower cranes;The building cornice height is less than 50m, the building area of each floor within 2500m2 with 1000KN.m self lifting tower crane 1 units, each increase of less than 2000m2 increased 1 1000KN.m self lifting tower crane;The building cornice height is less than 100m, the building area of each floor within 3000m2 with 1500KN.m self lifting tower crane 1 units, each increase of less than 2500m2 increased 1 1500KN.m self lifting tower crane;The building cornice height is above 100m, the building area of each floor within 3500m2 with 1 2000KN.m self lifting tower crane, each increase of less than 3000m2 increased 1 2000KN.m Jack 1 cranes;When the eaves height more than 25m below the 100m, according to each self lifting tower crane with 1 single cage construction elevator, eaves height above 100m with 2 single cage construction elevator;The podium when every floor area is too large, in accordance with the above standard auxiliary tower crane.
Q:Is the first entry into the construction project? Or direct access to fixed assets?
First in, in construction projects, and so on arrival booking use state, from the construction project into fixed assets. Increase in fixed assets, depreciation from the beginning of next month
Q:the part of the crane which balances the lifting arm.
What okorder /... Always wanted to see one erect itself, they just seem to spring up overnight. Wingman
Q:which is crane lift planning software free to download?
for spyware - download spybot 2008 (free n easy) for virus protection - download 'avast antivirus' (free n relatively easy) - both r good programs, just be careful with spybot - it is v. powerful, but luckily u can choose what to delete after it finds possible bad files, just dont let it delete any registry files (C/WINDOWS/System32) - these are important files - leave them alone unless problems persist - then get professional advice.
Q:What is the load moment of a crane?
Cranes are classified according to their tip load of capacity. Moment of a crane depents on its type. Usually moment is calculated by the lenght of its boom multiplied the tip load it carries.
Q:Why do you think children all over the world still fold paper cranes and send them to Hiroshima? Please answer c:
I think she died.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords