Product Description:

Quick Details

Model Number:
MJJ01-ZT
surface:
galvanized

Packaging & Delivery

Packaging Detail:one meter per piece, or six meters per piece
Delivery Detail:20days

Specifications

material pressed steel
surface galvanized
strength high grade
professional sales team in factory
weight 5.25kg

1.surface finished galvanized
2.OEM service

3.size custom made

4.material pressed steel or ductile iron

5.Process:  Pressed & Casting &Assembly

6.Application: To support and fix the formwork

7.weight 5.25kg

Our main products involve the Wing Nut, Formwork Clamp,  Nut, Base Jack Nut,   Slope Plate, Walter Plate, Pressed Plate,  Tie Rod, Scaffolding Coupler, Round Coupler, Pins, Washers, Steel Cone, Iron Cone, Concrete parts, Lock Nut, Flanged Wing Nut, Anchors, Lifting Anchors, Sockets, Lifting Clutch, Recess Former and other casted and pressed Formwork Accessories, Scaffolding Accessories etc.

Our selling network spread all over the world, the current main customers come from the Europe, the Middle East, the America and the Africa.

1. We are one of the biggest factory on formwork and scaffolding accessories.

2. We have more than 10 years experience on manufacturing and exporting.

3. We have the advanced equipment and process flow and excellent quality control.

4. We have the competitive price.

5. We have the completed sales and service team so that we can offer the best service



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the functions and requirements of the masonry wall
security1, set up a high-level scaffolding, the various materials used must meet the quality requirements.2, the foundation must be firm, before the erection of the calculation, to meet the load requirements, and according to the construction code set up, do drainage measures.3, scaffolding erection technical requirements shall comply with the relevant provisions of the code.
Q:Specification and type of scaffold erection
technical requirementThe materials used for steel pipe scaffold shall meet the following requirements:1 steel pipe diameter should be 48 ~ 51mm, wall thickness of ~ 3.5mm, length of 2.1 ~ 2.8m and 4 ~ 6.5m is appropriate, there are serious corrosion, bending, cracks, damage shall not be used.
Q:scaffolding piercing.. do they hurt? and how much are they in england? thanks x?
Yes they hurt but like all piercings if you look after them then it wont hurt for long. If you don't like pain don't get them. I can't tell you what they cost in England as you posted your question in the Australia section.
Q:How to calculate the vertical force of scaffolding
The calculated data include the following three values:1 uniform load value calculation,2 bending strength calculation: the maximum bending moment is considered as the moment under the uniform load3 deflection calculation: the maximum deflection is considered as the deflection of simply supported beam under uniform load
Q:Latch type disc scaffolding accessories is a national patent product
Pankou scaffolding is a new scaffold, the products imported from Europe in the last century in 80s, is the product after bowl-scaffold upgrade
Q:How old do u have to be to get a Scaffolding piesrcing ?
I have one and im 12. Im from Tennessee.
Q:male scaffolders only if i was swinging on the scaffold would ya stomp on my fingers with ya workboots on?
No, I would use my hammer while I had my workboots on.
Q:Painters on a scaffold physics help!!?
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q:A window washer is standing on a scaffold supported by a vertical rope at each end.. . .?
Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484
Q:Specification for construction steel pipe scaffolding and construction safety rules?
48mmX3.0mX6m is a national standard, but you can pay attention when you buy the shelf, generally said that they are 3 thick, but the pipe is under the difference, but the number of questions. There are 2.5 under the difference also has a difference of 111 layers of this standard is certainly enough, most of the South with a cover of 20 layers of it, they are basically the same price

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range