Concrete Slab with Iron Wires Making Machine
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 5 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Concrete Slab with Iron Wires Making Machine
1. Structure of Concrete Slab with Iron Wires Making Machine:
Precast Floor Tile Panels Forming Machine works on the long-line table, using the high-strength low-relaxation steel strand as the guide, using the pushing work method to forming the concrete hollow-core slab. The slab have the advantages of smooth surface, high-density structure, capable of making construction slabs of 4.2m to 18m. The GLY series concrete hollow-core slab mainly used on the larger bay workshop, school, hospital, shopping mall, office building, bulk storage plant etc.
2. Main Features of Concrete Slab with Iron Wires Making Machine:
• One machine can make one slab lower cost, high Wear-resistant, long service life.
• In case of quality problem the company provide free replacement.
• Provide technical support for free.
• Provide consumers with regular visits
• Simple structure, easy operate, less wear parts
3. Concrete Slab with Iron Wires Making Machine Images:
4. Concrete Slab with Iron Wires Making Machine Specification:
Type | Aperture & diameter | Number and diameter of wires | Max span | Total power | Productivity (m/min) | Max. Load (KN/m2) | Overall dimension (mm) | Weight (kg) |
GLY180-1200 | 11/ peach | 12/9.5or12.7 | 9 | 18.5 | 1.1-1.3 | 16.16 | 2900X1500x1200 | 3300 |
GLY200-1200 | 8 /peach | 10/9.5or12.7 | 10 | 22 | 1.1-1.3 | 13.22 | 3700X1550X1550 | 5300 |
GLY250-1200 | 8/ peach | 10/12.7 | 12.6 | 33 | 1.1-1.3 | 11.1 | 3700X1550X1500 | 6200 |
GLY300-1200 | 6 /peach | 8/12.7 | 15 | 40 | 1.1-1.3 | 10.83 | 3700X1550X1500 | 6900 |
GLY380-1200 | 8 /rhomb | 8/12.7 | 18 | 39.2 | 0.8-1.0 | 12.27 | 4600X1850X1600 | 7500 |
Production Process
Rebar tensioning
Raw materials preparing
Molding
5. Packing & Delivery
• Wire cables are used for fastening the machine on the trailer or inside the container.
• Machine covered with plastic film.
• Machines can be packed in tarpaulin or wooden case according to customer’s needs.
6. FAQ:
We have organized several common questions for our clients, may help you sincerely:
• What information we need to confirm with you before send a formal offer?
What kind of slab you want to make, wall panel, roof panel, lintel or something else?
Do you have exact slab size (slab thickness and width)? If not, please tell us the slab span, we will give you suggestion.
• Have you use this kind of machine before?
Our machine is totally different from European machine. Please don’t follow their instructions.
• How long can we receive the product after purchase?
In the purchase of product, within 20 working days we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 35 working days can be served.
7. Why choose us:
• 30 years manufacturing experience.
• Constitutor of the
• More than 10 patents.
• Passed ISO9001:2000 quality system certificate.
• More than 10 types of machine and over 100 models for choose.
• Supply complete set of technology and equipment solution.
• We can design and manufacture all kinds of concrete forming equipment according to customers' demands. Meanwhile we can even more provide our customers a complete set of technology and solution for all producing flow.
8. Our Service:
• We supply the technical supporting all the time.
• We supply one year warranty for whole machine.
• We supply free quick wear parts.
• We supply low charge continue maintenance when warranty is expired.
• We supply free training to end-users
- Q: I'm specifically looking for training on heavy machinery such as bulldozers, backhoes cranes etc. The courses are given in montreal but there's a 10 year wait. If you know of any sort of training course of the sort in the 613 area code, please let me know. Thanks
- Try okorder /
- Q: Jan. 1 Retired a piece of machinery that was purchased on January 1, 2001.The machine cost$62,000 on that date. It had a useful life of 10 years with no salvage value.June 30 Sold a computer that was purchased on January 1, 2008.The computer cost $40,000. Ithad a useful life of 5 years with no salvage value.The computer was sold for $14,000.Dec. 31 Discarded a delivery truck that was purchased on January 1, 2007. The truck cost$39,000. It was depreciated based on a 6-year useful life with a $3,000 salvage value.InstructionsJournalize all entries required on the above dates, including entries to update depreciation,where applicable, on assets disposed of. Ingles Company uses straight-line depreciation. (Assumedepreciation is up to date as of December 31, 2010.)
- Interesting arguments, but I am not 100%
- Q: I remember a famous economist said that. Poor countries are economically advantaged to use manual labor instead of advanced technology so that they can employ everyone.
- I don't know who said it, but it sounds logical. It's better than taking out loans from the IMF.
- Q: Please include your reference. Thank you.
- E26:O26
- Q: Can you convert Auto Cad drawings not Inventor drawings to use with CAM & CNC software & Machinery?
- yes you can i took a AutoCad class and the teacher showed us how to convert AutoCad drawings to mastercam
- Q: What is the processing of materials?
- High temperature heat distortion temperature, high melting point).
- Q: find impeller for model 09576 central machinery pump(12 volt)?
- Check out this site
- Q: what are working men and women who oporate machinery called?
- Machine operators
- Q: When a virus takes over the machinery of a cell, it forces the cell to manufacture:a. more mitochondria to provide energy for the virus b. more lysosomes for digestion c. more food particles d. more virus particles
- D. Look up the experiment done by Hershey and Chase. In their experiment, they used bacteriophages - viruses that attack bacteria.
- Q: Like only 90 or 120 degrees, but it's precisely controlled.Thanks!
- Agitator on a washing machine. Garage door opener. Vibrations on a vibrator. So on and so forth.
Send your message to us
Concrete Slab with Iron Wires Making Machine
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 5 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords