Concrete Pump Truck 37m Truck-Mounted (HB37A)
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Concrete Pump Truck 37m Truck-Mounted (HB37A)
Product Details
Basic Info.
Model NO.:HB37A
Type:Concrete Mixing Truck
Shotcrete Type:Semi-Dry
Machining Process:Hydraulic
Structure:Spiral Type
Productivity:150㎡/h
Feeding Height:1400mm
Vibrating Amplitude:2.6mm
Condition:New
Color:Yellow
Brand Name:XCMG
Export Markets:Global
Additional Info.
Trademark:XCMG
Packing:Suitable Package for Shipment
Standard:Standard Configuration
Origin:Jiangsu, China
Production Capacity:20 Sets/ Month
Product Description
Item | Parameter | ||
Outline dimensions (Length′ Width ′Height)mm | 12430×2500×3995 | ||
Fuel type | Diesel | ||
Engine emission standard | Euro III | ||
Displacement/Powerml/kW | 12100/279 | ||
Steering type | Steering wheel | ||
No. of axle | 4 | ||
Wheel basemm | 1793+4407+1370 | ||
No. of spring leaf (front/rear) | 2+3/9 | ||
Tire | 12.00R20 | ||
Track (front/rear) mm | 2029/1872 | ||
No. of tire (exclude spare tire) | 12 | ||
Total vehiclecurb weight | Total weightkg | 40870 | |
Front axle loadkg | 15870 | ||
Mid, rear axle loadkg | 25000 | ||
Total weight | Total weightkg | 41000 | |
Front axle loadkg | 16000 | ||
Mid, rear axle loadkg | 25000 | ||
Crew in cab | 2 | ||
Approach angle/Departure angle | 21°/10° | ||
Front overhang /Rear overhangmm | 1360/3500 | ||
Max. speedkm/h | 94 | ||
Min. ground clearancemm | 270 | ||
Max. grade-ability | 38% | ||
Fuel consumption of 100kmL/100km | 40 | ||
Chassis | Model | FM12 | |
Grade | II | ||
Manufacturer | VOLVO | ||
Engine | Model | D12 | |
Manufacturer | VOLVO |
- Q:What is the method of washing the concrete pump?
- If the cutting ring and eye plate wear is not serious, cutting ring and eye plate spacing <0.1mm, and no more than 1mm between the groove scratches, available direct water method.
- Q:How to determine the concrete pump truck blocking the site
- S pipe valve is blocked gradually formed, the main reason is that after pumping the finished product concrete, there is no timely use of high pressure water rinse, resulting in commercial concrete residue in the S tube, the course of time gradually thickening, accumulation consolidation, causing clogging.
- Q:What is the concrete pump pumping technology?
- The first generation of pumping technology: electric control for the technology, PLC control solenoid valve for the realization of pumping, S pipe distribution of alternating commutation.
- Q:How the concrete pump truck is fuel tank?
- Concrete Piston Cylinder Piston / Piston Seal Ring No matter what material is used to create a total leakage due to wear, the main cylinder is designed and manufactured in the presence of the oil unit, ie, on each main cylinder,
- Q:Can the tower crane be filled with concrete pump tube?
- (3) the weight of the hanging material is not clear or overload is not allowed to be suspended; (4) the bulk of the bundle is not strong or the material is not full of loading and unloading; (2)
- Q:What is the calculation of the unit price of concrete pump?
- Correctly formulating the unit price of construction machinery is an important aspect of controlling the project cost reasonably.
- Q:How to choose concrete pump concrete pump
- The main performance parameters of the commonly used concrete pump should be consistent with the construction requirements or slightly larger, if the capacity is too large, the utilization rate is low, too small, not only can not meet the requirements will accelerate the loss of concrete pump.
- Q:Winter concrete pump pipe Zeyang insulation Yeah?
- Concrete winter preparation for the day when the minimum temperature below 0 ℃, should take the winter construction measures to prevent the construction of the construction work suffered frost damage
- Q:Why does concrete pump truck need pipe?
- The concrete pipe is used to replace the concrete slurry before the concrete is pumped. It can be quickly dissolved in water at room temperature to form a lubricating film with countless micro-anions so that the surface of the pipe wall is sufficiently lubricated.
- Q:How to deal with pumping concrete pump pipe pipe burst after the burst, the pump can not stop the situation?
- More stupid, and if the replacement of more than an hour, it may be very unskilled.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Concrete Pump Truck 37m Truck-Mounted (HB37A)
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
New products
Hot products
Related keywords