Truck-Mounted Concrete Pump Truck (HB37A)

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Truck-Mounted Concrete Pump Truck (HB37A)

Product Details

Basic Info.

Model NO.:HB37A

 

Type:Concrete Pump

Shotcrete Type:Wet

 

Machining Process:Hydraulic

Structure:Rotor Type

 

Productivity:150㎡/h

Feeding Height:1400mm

 

Vibrating Amplitude:2.6mm

Certification:ISO9001: 2000, CE

 

Condition:New

Color:Orange

 

Chassis Model:Cxz51q ( Japan )

Total Weight:28150 Kg

 

Engine Model:6wf1

Engine Power:287kw

 

Outline Dimensions (Lengthxwidthxheigh:11990 X2490 X3900 Mm

Export Markets:Global

Additional Info.

Trademark:XCMG

 

Packing:Nude

Standard:CE/CCC/ISO/GHOST/SGS

 

Origin:Jiangsu, China

HS Code:87054000

 

Production Capacity:300 Units/Month

Product Description



No.ItemUnitParameter
1Max. speedkm90
2Min. turning diameterm18.4
3Brake distancem7
4Approach angle°31
5Departure angle°12
6Chassis model
CXZ51Q ( Japan )
7Total weightkg28150
81st axle loadkg6780
92nd, 3rd axle loadkg21220
10Engine model
6WF1
11Max. Engine powerkW287
12Max. Engine torqueN.m1862
13Max. grade-ability%38
14Fuel consumption limitL/100km34
15Outline dimensions (Length´ Width ´Height)mm11990´2490´3900

Truck-Mounted Concrete Pump Truck (HB37A)

Truck-Mounted Concrete Pump Truck (HB37A)


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the advantages of concrete pump gate valve and S pipe valve?
Parabolic principle is used to design, so that the material is more reasonable, further reducing the resistance, and S pipe valve is currently the most widely used a concrete distribution valve.
Q:Winter concrete pump pipe Zeyang insulation Yeah?
Depending on the area and the temperature at the time of construction, if the temperature is not too low (such as minus 5 °), available straw bag (or multi-layer sacks) and plastic wrap.
Q:What is the pumpability of concrete
Under certain pump pressure, the farther or higher the concrete can deliver, the lower the chance of blocking, the better the pumpability of the concrete.
Q:Can the tower crane be filled with concrete pump tube?
(6) buried in the underground material are not allowed to hang; (7) safety device failure or sickness are not allowed to suspend; (8) live light dark can not see hanging objects up and down
Q:What factors will be taken into account when selecting the pump chassis?
Strong competition in the construction sector, most pump users will think that well-known brands of vehicles will give them the advantage of business bidding;
Q:When the concrete pump in the transport of concrete before the pipeline should be what lubrication
If you pouring a long time, you can pouring, as long as the vibration stick to keep up with nothing.
Q:How does the cement slurry solidify inside the concrete pump?
If the solidification is very serious, it is recommended to use ultra-high pressure water jet rinse, this water knife can be directly cut concrete, but the price is relatively large.
Q:What are the precautions for the operation of the concrete pump truck?
After the start of the concrete pump should be pumping the right amount of water to wet concrete pump hopper, concrete tank and pipe and other direct contact with the concrete parts.
Q:Building concrete pump is how to bulk cement (concrete) to the high
Repeatedly, the concrete in the hopper is continuously sucked in and out of the delivery tank, through the Y-pipe and outlet connected to the pipeline to reach the point of operation to complete the pumping operation
Q:How to install concrete pump
When the cylinder reaches the top dead center, it will automatically change.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range