Trailer Concrete Pump HBT80C-1813D

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
200 Units per Month unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Max. theo. output   m3/h      76/40

Concrete pressure MPa  13/7.4

Distributing valve style             S valve

Cylinder size: diameter stroke         mm  Φ200×1800

Hopper capacity×feeding height     L×mm       600×1400

Outlet diameter       mm  Φ180

Motor model             Y280M-4

Rated power    kW   90

Rated voltage  V       380

Rated speed    r/min        1480

circuit type       open circuit

Pumping system pressure       MPa32

Distributing system pressureMPa19

Mixing system pressure)          MPa12

Max mixing speed   r/min        32

Capacity of oil tank  L       300

Max.stuff.diametermm  Slick scree:50

scree:40

Inside diameter of delivering pipe   mm  Φ125/Φ150

Dimensions, length×width×height  mm  6400×2100×2300

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to deal with pumping concrete pump pipe pipe burst after the burst, the pump can not stop the situation?
More stupid, and if the replacement of more than an hour, it may be very unskilled.
Q:Winter concrete pump pipe Zeyang insulation Yeah?
Concrete winter preparation for the day when the minimum temperature below 0 ℃, should take the winter construction measures to prevent the construction of the construction work suffered frost damage
Q:How the concrete pump truck is fuel tank?
Concrete Piston Cylinder Piston / Piston Seal Ring No matter what material is used to create a total leakage due to wear, the main cylinder is designed and manufactured in the presence of the oil unit, ie, on each main cylinder,
Q:How to prevent concrete pump blockage
Partial Leakage: Conveying Pipe Fitting Seal Fasten or replace the seal; shrink the profiled bolt to adjust the eyeglass and cut ring clearance; the piston is intact; the delivery cylinder is intact.
Q:90KW concrete pump should be used in the number of generators?
To normal long running 90KW concrete pump, 150KW generator is not enough, because the device to start the current
Q:What are the requirements for the selection of concrete pump tubing and the setting of the bracket?
3 delivery pump pipe fittings should be tightly connected to the pipeline to the pipeline should be smooth;
Q:What is the pressure of a support leg when the concrete pump is operating?
Of course, different models, the brand of the specific parameters of the pump is not the same
Q:What is the concrete pump pumping technology?
The second generation of pumping technology: hydraulic commutation technology, completely rely on the main cylinder, the distribution of small fuel tank hydraulic signal changes to achieve action for the change.
Q:What is the difference between a concrete pump and a valve?
I suggest you buy S valve, I have six years in this industry, the concrete pump just when the production in China gate
Q:How to operate concrete pump
In case of obstruction of the delivery pipe, reverse operation should be carried out to return the concrete to the hopper and, if necessary, remove the blockage.

1. Manufacturer Overview

Location Chasha,Hunan
Year Established
Annual Output Value ¥80 billion
Main Markets China;Southeast Asia;Middle East;Russia;Africa;South America
Company Certifications ISO9001;GOST;CCC,CE

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Shanghai
Export Percentage 0.45
No.of Employees in Trade Department 300
Language Spoken: English,russian
b)Factory Information  
Factory Size: 2500acres
No. of Production Lines 30
Contract Manufacturing OEM Service Offered
Product Price Range high