Concrete Pump Truck SYG5310THB43

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
200 Units per Month unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Truck-Mounted Concrete Pump

Type: 6 Cylinders,4 Strokes, Water Cooling, Electric Ignition

Chasis: ISUZU CYZ51Q or BENZ

Max Concrete Output:120 M3/H

Max Power:265kw/1800rpm

Displacement:14256 Cc

Diameter Of Conveying Pipe:125mm

Dimension(L*W*H):11690×2500×3870mm

Exhaust Standard:Euro Ⅲ

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What kind of driver's license does the concrete pump need?
According to the "People's Republic of China Road Traffic Safety Law" Chapter II, Article XI: driving motor vehicles on the road, should be hanging motor vehicle number plate, placed inspection signs, insurance signs, and the vehicle to carry motor vehicle driving permit.
Q:How to deal with pumping concrete pump pipe pipe burst after the burst, the pump can not stop the situation?
In the shortest possible time to deal with, replace the burst out of the elbow, or straight tube is the best way, in fact, as long as the workers skilled, command properly, for a tube that is 10 minutes,
Q:Is it easy to use fine stone concrete pump?
It is used for the construction of warm and warm concrete and other concrete construction engineering problems. It is suitable for the filling area of the fine concrete or the mortar filling area ,
Q:What is the difference between a concrete pump and a concrete pump
Under normal circumstances, the concrete pump delivery distance, along the horizontal direction can reach 200 ~ 300m, along the vertical direction up to 100m or more.
Q:What is the pumpability of concrete
Under certain pump pressure, the farther or higher the concrete can deliver, the lower the chance of blocking, the better the pumpability of the concrete.
Q:How to choose concrete pump concrete pump
Different, the choice of models in addition to considering the amount of concrete pouring, should also consider the type and structure of the building, construction technical requirements, site conditions and the environment.
Q:What are the drawbacks of concrete pump gate valve and S pipe valve?
In addition to the use of gate valve delivery, but also requires the vertical transport pipeline in front of the installation of a horizontal transmission pipe section, the length of concrete lifting height of 1 /
Q:What is the treatment of concrete pump block
Into the hopper into the 15 ~ 30L cement slurry, repeated, forcing the channel to open.
Q:What factors will be taken into account when selecting the pump chassis?
Pumps special use of the environment on the after-sales service requirements are very high, after-sales service is timely and even decide whether the user contract construction contract can be successfully completed.
Q:How much concrete can the concrete pump deliver for one hour
Large volume compression to 60-80M3 / h, small volume pouring speed in the basic 40m3 / h.

1. Manufacturer Overview

Location Chasha,Hunan
Year Established
Annual Output Value ¥80 billion
Main Markets China;Southeast Asia;Middle East;Russia;Africa;South America
Company Certifications ISO9001;GOST;CCC,CE

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Shanghai
Export Percentage 0.45
No.of Employees in Trade Department 300
Language Spoken: English,russian
b)Factory Information  
Factory Size: 2500acres
No. of Production Lines 30
Contract Manufacturing OEM Service Offered
Product Price Range high