• Concrete Machinery-Concrete Pump (Model:SP80.16.110E) System 1
  • Concrete Machinery-Concrete Pump (Model:SP80.16.110E) System 2
  • Concrete Machinery-Concrete Pump (Model:SP80.16.110E) System 3
  • Concrete Machinery-Concrete Pump (Model:SP80.16.110E) System 4
  • Concrete Machinery-Concrete Pump (Model:SP80.16.110E) System 5
  • Concrete Machinery-Concrete Pump (Model:SP80.16.110E) System 6
Concrete Machinery-Concrete Pump (Model:SP80.16.110E)

Concrete Machinery-Concrete Pump (Model:SP80.16.110E)

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
500 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Detailed Description

  1. The valve for change-over from high pressure to lower pressure is designed to be easily controlled, which can adjust the condition of the pump easily in accordance with the requirement of job site. Dismantle the tube is not necessary so that it can avoid the pollution.
    2.Advanced hydraulic system which change direction hydraulically can run without electrical part.
    3.Concrete piston can run back to washing tank, which can easily change the piston and be convenient for maintenance.
    4.Tungsten steel glasses shaped plate and cutting ring guarantee long using life.
    5.Hydraulic outriggers make easily positioning.
    6.Pump can be easily washed.

  2.  

  3. Max concrete conveying capacity81
    Max output pressure 16
    Max delivery distance(horizontal/vertical)1500/350
    Concrete slump range 160-250
    Feeder capacity 0.8
    Feeding height 1400
    Concrete delivery cylinder 200*1600
    Main oil cylinder Φ125*Φ80*1600
    Motor power 110
    Main hydraulic pump Rexroth
    Main hydraulic pump delivery capacity 260
    Main hydraulic pressure 32
    Hydraulic tank volume580
    Max trailing speed 8
    Remarks S-valve
    Outside demesion(L*W*H) 6800*2150*2300
    Weight 

 

Q:What is the performance characteristics of concrete pump
Optimized design of the hopper, easy to clean, better suction performance.
Q:Whether the concrete pump can pass the height of 3.75 meters
The use of pressure to transport the concrete along the pipeline.
Q:What factors will be taken into account when selecting the pump chassis?
In the fuel prices continue to rise today, pump fuel consumption is also a factor that customers have to consider.
Q:What is the purpose of concrete pump truck?
Adapt to the urban construction, residential quarters, recreation venues, overpasses, airports and other construction of concrete construction.
Q:How the concrete pump truck is fuel tank?
Concrete Piston Cylinder Piston / Piston Seal Ring No matter what material is used to create a total leakage due to wear, the main cylinder is designed and manufactured in the presence of the oil unit, ie, on each main cylinder,
Q:How to wash the concrete pump with a ball
First in the pump tubing in the concrete residue washed 1-2 side, then put the ball into the feed port, add water to open the pump, the pump will be with the water through the pipeline, the pipe wall
Q:How to operate concrete pump
(9) When the pumping system is pressurized, do not open any piping and hydraulic piping.
Q:What is the cause of concrete pump blockage?
When the above two methods can not rule out the plug, the concrete pump can be removed after the removal of the plugging parts of the pipe, discharge concrete blockage, and then take over the pump.
Q:What is high and low pressure switching and hydraulic gear ratio on concrete pumps?
Concrete pump on the high and low voltage switch and hydraulic transmission ratio means:
Q:Is it easy for small concrete pumps?
If it is the function of the device itself, you can responsibly tell you that it is already very mature

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords