CMAX Brand Building Hoist SC280/280

Ref Price:
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
50 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Power Source: Electricity Maximum Lifting Weight: 2800kg Maximum Lifting Height(M): 96m/min
Lift Speed: 96m/min

Product Description:

Different Driven System

High efficient & energy saving models: 

1. 2000kg load per cage can choose motor: 3x8.5kw, 2x11kw, 2x13kw with energy saving characters.  3x11kw with common character.  (With gearbox more than 90% energy usage rate) low speed type

2. 1000kg load per cage can choose motor: 2x8.5kw, 2x11kw with gearbox more than 90% energy usage rate.) low speed type

3. 1500kg load per cage can choose motor: 2x13kw, 2x15kw with gearbox or worm reducers. Low speed type

4. 2000kg load with mid-speed: 3x15kw,2x23kw and 2x26kw with high efficient gearbox.

Note: (SEW,NORD OR KOREA BRAND MOTOR COULD BE CHOOSE) 

 

Frequency inverter (VF) Type building construction hosit:

Characteristics

Model

Rated Loading

Lifting Speed

Motor Power

 

 

Double Cabin

 

Low-speed

SC200/200D

2×2000kg

0-33m/min

2×(3×11kw)

SC100/100D

2×1000kg

0-33m/min

2×(2×11kw)

Mid-speed

SC200/200Z

2×2000kg

0-55m/min

2×(2×11kw)

SC100/100Z

2×1000kg

0-55m/min

2×(2×11kw)

 

Single

Cabin

Low-speed

SC200D

2000kg

0-33m/min

3×11kw

SC100D

1000kg

0-33m/min

2×11kw

Mid-speed

SC200Z

2000kg

0-55m/min

2×11kw

SC100Z

1000kg

0-55m/min

2×11kw

Salient Features of Our products:

1. Mast section welded by welding Robot ensures reliable quality and elegant appearance.

2. All the steel structures are processed with blasting technology to remove rust. The adhesion of surface painting is outstanding.

3. Suspension cage guarding board adopts figured aluminum plate and numerical control punched aluminum plate. The suspension cage is lightweight and artistic in appearance. 

4. Transmission mechanism supplied by the professional manufacturer has high efficiency, long service life and stability in performance.

5. Complete set of overload protection devices, variety of limiters and mechanical chain devices ensure its reliability.  Anti-falling safety device, which restricts the excessive downward movement of the cage, preventing and eliminating accidents.

6. Frequency conversional construction hoist is safe, stable and comfortable. Starting electricity is smaller than working electricity, energy-saving and high efficient.


Descriptions of our building hoist:

The general building hoist manufactured by our company have the features as good quality, long life, wide application range and convenient for maintenance, the gering adopts imported bearing, enameled cable, and oil seal, the electric parts adopt products from world renowned manufactures such as Schneider, Siemens, and LG, the racks and pinion adopts special material and heat-treatment technique, which prolong the life of these parts. The steel structure uses quality steel from famous domestic manufacturers, the surface of the structure can apply paint-spray, Parkerizing baking finish or hot galvanizing processing according to users requirements, the cage can be produced and decorated by aluminum molded board, punched-plate or figured aluminum board.

 

Main Features of Building Material Hoist 

1. the recommended cage dimension(LXWXH):2.0X1.0X2.5, 2.5X1.0X2.5, 2.5X1.3X2.5, 3.0X1.5X2.5, 3.2X1.5X2.5, 3.8X1.5X2.5, 4.0X1.5X2.5, 4.2X1.5X2.5 etc, we can also manufacture cages of other size according to the user.

2. The cage and the door material can be aluminum molded board, punched-plate, figured aluminum board or other type according to your requirements.

3. The mast and the tie-in surface can adopt paint-spray, or hot galvanizeing processing.

 

Advantage of our building hoist:

1. Our own systems of production engineering.

2. Production design from the concept to the engineering details.

3. Technical experts with great experience in the sector.

4. Continuous development of new solutions and products adapted to the requirements of our clients.

5. Methodology and project procedure administration in compliance with current guidelines.

6. Extensive worldwide commercial network

 

CMAX Brand Building Hoist SC280/280


FAQ

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest stateowned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of variouskinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days. 

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the safety device for construction elevator?
A lot of 1, anti-drop safety device 2, upper and lower limit 3, extreme limit 4, buffer spring 5, line door limit switch Single line door limit switch 7, ceiling switch 8, enclosure door lock 9, single door lock The door lock is on and off There are also many electrical safety protections
Q:What is the meaning of double straps in the construction elevator?
One component of the elevator's drag system is the weight of the car. The other side of the car is connected to the top of the car by dragging a wire rope. It can be used for the energy saving of the elevator towing system, because the elevator load optimization is calculated by the theory calculation. The elevator should be calculated before the weight is weighed: the calculation principle is that the weight is equal to the weight of the car and half the load.
Q:When building tall buildings, the machine that USES to lift concrete to wait for tall building
It should be the construction elevator. Construction elevators are often called construction elevators, but construction lifts include a broader definition, and construction platforms are part of the construction elevator series. Simple construction elevator is by car, driving mechanism, standard section, attached to the wall, chassis, fence, electrical system and so on several parts, manned cargo construction machinery is a frequently used in construction, because of its unique enclosure structure make it take up both comfort and safety, construction elevator is usually used with tower crane on the construction site, the average load in 1-3 tons, running speed is 1 to 60 m/min. The construction elevator of our country is more and more mature, and gradually goes to the international.
Q:Safe use of construction elevator
In the case of passenger and carriage, the loading shall be uniformly distributed, and the overload shall be strictly prohibited. When the elevator runs to the top and lowest levels, it is strictly forbidden to stop at the collision or lower limit. 7. The driver for leaving hanging basket and while going off work, should be hanging basket fell to the ground, to cut off the total power supply, and the door is locked point, prevent other undocumented workers start the hoisting cage without authorization. Wind up above 6, should stop using the elevator and bring the cage down to the ground. There must be good protection on both sides of the transportation channel. Floor door should be in a normally closed state, its height should conform to the requirements of the specification, anyone shall not open or head out of the door, when the floor door open, the driver shall not start the elevator. Ensure that the communication device is in good condition and the driver should be able to start the lift after confirming the signal. The driver should immediately execute any emergency stop signal on the floor of the operation. The elevator should be installed on a separate ground protection and lightning protection device. It is strictly forbidden to do maintenance work under the condition of the elevator. If maintenance is required, the power supply must be cut off and the sign of "check in, shut off" will be hung in a prominent place.
Q:How does the elevator operate
Responsible for operating elevator, maintenance, maintenance and safety. See what kind of elevator and workplace you are working on.
Q:6 layer of brick and concrete construction project, have tower crane still need construction elevator?
Very cow! Six floors of brick and concrete construction projects have tower cranes. No construction lifts are needed.
Q:How many meters or how many layers should the construction elevator be installed?
In the guangdong area, the first installation and acceptance of the equipment will be below 7 levels, and more than 7 floors will be charged for the inspection. Another 9 meters per wall, the most suitable installation time is a building at least 12 meters, which can be installed at 21 meters in the evening.
Q:How to adjust the weight limit of the construction elevator
You're not going to be without a master You still look at the instructions
Q:How does the driver of the construction elevator do the search for a sudden power failure
When the elevator is running in an abnormal condition, it should stop immediately and take effective measures to bring the ladders down to the ground floor. When the electric is out of control in operation, the stop button should be pressed immediately. The stop button is not allowed until the failure is ruled out.
Q:What are the requirements for the construction elevator
So for safety device factory test is very strict, before delivery by the statutory inspection unit for torque measurement, critical speed measurement, measuring the amount of spring compression, each with the test report, after assembly to the construction lifter for drop test under rated load, and the site to use the elevator must be every three months to conduct a drop test. For safety device to the factory for two years for safety device (delivery date), must also be sent to the statutory inspection unit to carry on the test, after testing once a year.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range