• Building Hoist  SC200/200BP Construction Hoist high Quality System 1
  • Building Hoist  SC200/200BP Construction Hoist high Quality System 2
  • Building Hoist  SC200/200BP Construction Hoist high Quality System 3
  • Building Hoist  SC200/200BP Construction Hoist high Quality System 4
Building Hoist  SC200/200BP Construction Hoist high Quality

Building Hoist SC200/200BP Construction Hoist high Quality

Ref Price:
get latest price
Loading Port:
Dalian
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
20 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of Construction Hoist Description

 

The construction hoist product  produced by Fangyuan has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And Fangyuan is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad

 

Main features of Construction Hoist

 

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system. 

 

Construction Hoist Specifiction  

 

SC series product also has special design, such as reinforced guide rail with cross-section of 800mm, inclined type, special for cooling tower, etc. All the double cage construction elevator can be changed into single cage type, such as SCD200.

Model

SC200/200

SC200/200BP

SCD200/200

SC200/200B

Configuration

Standard type

Frequency conversion

Counterweight type

Export type

Rated load

kg

2000/2000

2000/2000

2000/2000

2000/2000

Cage size L×W×H

m

3×1.3×2.2

3×1.3×2.2

3×1.3×2.2

3×1.3×2.2

Passengers

16/16

16/16

16/16

16/16

Max.lifting height

m

150

300

150

150

Max.height of free end

m

9

9

9

9

Lifting speed

m/min

33

0~60

33

33

Capacity of small hoist

kg

200

200

200

200

Std.section L×W×H

mm

650×650×1508

Electric motor

Type

Disc brake electic motor

Power

kW

11×3/11×3

11×3/11×3

11×2/11×2

11×3/11×3

Speed limiter

Action speed

m/s

1.2

1.45

1.2

1.2

Rated brake load

kN

40

40

30

40

 

Model

SCD200/200B

SC100/100

SCD200

Configuration

Counterweight type

No counterweight

Counterweight type

Rated load

kg

2000/2000

1000/1000

2000

Cage size L×W×H

m

3×1.3×2.2

3×1.3×2.2

3×1.3×2.2

Passengers

16/16

12/12

16

Max.lifting height

m

150

150

150

Max.height of free end

m

9

9

9

Lifting speed

m/min

33

33

33

Capacity of small hoist

kg

200

200

200

Std.section L×W×H

mm

650×650×1508

Electric motor

Type

Disc brake electic motor

Power

kW

11×2/11×2

11×2/11×2

11×2

Speed limiter

Action speed

m/s

1.2

1.2

1.2

Rated brake load

kN

30

30

30

The above parameters are subject to change without prior notice, please refer to the actual product.
Note: Both cage size of 3×1.3×2.2 and 3.2×1.5×2.4 are available for of each model (Excl. export type).

 

Images of construction hoist

 

 

 

 

FAQ of Construction Hoist

 

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.

 

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & protection system, electrical top crane and safety device.  

 

Q: What is the meaning of the building hoist’s code?

A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons.

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance& exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience.

Q:Can construction elevators be taken by people or by goods
According to GB 26557-2011, "a vertical guide for people with vertical navigation". 5.6 lift cage 5.6.1 general When the maximum number of passengers can be carried, the maximum amount of the ceiling shall be calculated according to the area of 0.2 square meters per person, and the weight should be calculated at 75 kg per person.
Q:Do the elevator need to be installed when the main project is in construction
The top brass usually need to install the construction elevator.
Q:How many meters is the wall of the construction elevator?
The height is greater than 60 meters every six meters.
Q:Helped wall bar how to set up, and several layers of set a, two width, wall rod need a few meters long, what shape is the embedded parts, how much of a steel bar, Angle and wall vertical or have?
According to drawings, find the embedded at the scene near the level of architectural axis positioning and high elevation line (50 wire or 1 m wire) location and double-check, axis dividing levels as much as possible in accordance with the size distribution. Find out after each axis, measuring building contour, and map measure the buildings, and building construction drawing contrast, timely transfer measurement results to the designer, designer analyze the error and make changes
Q:Why do you ask the construction elevator to be a certain distance from the structure? Is very close to if not you can not bother to do delivery channel security protection or something, out of the elevator out directly, and attachment should be able to get more easily, to solve. Thank you very much!!
The distance between the moving parts and the building and the fixed construction equipment shall not be less than 0.25 m. The main thing is to prevent the person from the point of view. For example, workers are on the third floor to look down, hanging cage, where is the result now hanging basket is go down from the fourth floor, if not the 25 cm, likely to brush "cut".
Q:How does the driver of the construction elevator do the search for a sudden power failure
When the elevator in the operation of the midway stop due to power outages or other reasons, the manual can be decreased, the end of a motor brake electromagnet manual release slowly shake handshandle pull outward, slowly slide down the ladder cage, ladder cage fall shall not exceed the rated speed, manually drop must be conducted by professional maintenance personnel.
Q:Construction elevator positioning should consider which problems
It is convenient to install the wall with the wall
Q:How many meters or how many layers should the construction elevator be installed?
Construction elevator is also called construction lifter, alias outdoor elevator or people dual-purpose ladder. The country is not clear how many meters or how many layer must be used, but in some coastal developed cities are now more than 30 meters using construction elevator, some cities also issued relevant rules more than 30 meters must use construction lifter, gantry and hoist is no longer used.
Q:When does the construction elevator take off?
Generally in roof waterproof thermal insulation engineering, interior decoration engineering basic completion, outdoor decoration project is approaching to the end, began to dismantle scaffold outside of time.
Q:The construction elevator always jumps
The construction elevator of our construction site always jump at the start of the building, always can't find the reason, the reason that can be so, have a person encounter this thing But it used to be normal, and sometimes it's jump, start, jump, start, and sometimes you can do it over and over again,

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches