Product Description:

Structure of Construction Hoist Description

 

1. Quality raw material, strict production management and career responsibility to make the hoist with the highest safety control, and the advanced design make it with good vision to enhance the safety.

2. Simple structure and low cost

3. Convenient in installation, disassembly and maintenance.

4. Energy-saving, starting current is lower than the rated current.

5. Adjustable speed, the maximum speed could reach 96m/min.

6. Frequency conversion control system, stable starting and breaking and low mechanical wear

 

Packaging & Delivery of Construction Hoist 


Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Main Parts of Construction Hoist


● The gearing adopts imported bearing, enameled cable, and oil seal.

 

● The electric parts adopt products from world renowned manufactures such as Schneider, Siemens, and LG.

 

● The racks and pinion adopts special material and heat-treatment technique, which prolong the life of these parts.

 

● The steel structure uses quality steel from famous domestic manufactures.

 

● The surface of the structure can apply paint-spray, parkerozing baking finish or hot galvanizing processing according

    to users requirements,

 

● The cage can be produced and decorated by aluminum molded board, punched-plate or figured aluminm board.


 

Construction Hoist Specifiction


Construction Hoist SC250/250 Building Equipment

Construction Hoist SC250/250 Building Equipment

 

FAQ of Construction Hoist


Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.  

 

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & 

protection system, electrical top crane and safety device.  

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity 

is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our 

quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance

 & exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience.  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How many guides are in the construction elevator
1 guide frame is 1508cm, the highest can be 400 meters
Q:Does the new approach builder need a localizer test report
Need, not for safety device testing qualified report, inspection agency will not issue the inspection report, in the construction of elevator installation supervision and inspection report, there is a specifically for, for safety device must have testing qualified report, to be certified.
Q:6 layer of brick and concrete construction project, have tower crane still need construction elevator?
Tower crane is used for heavy lifting, long pieces, small machinery and materials must be used in the construction elevator.
Q:How to save the elevator accident
The elevator is an important vehicle in high-rise buildings, and if a failure occurs, passengers may be trapped, falling, and other hazardous accidents. Emergency point When the elevator is not normal, the legs are slightly bent and the upper body is tilted forward to cope with the possible impact. When the elevator is suddenly stopped, don't walk out the door easily, in case the elevator suddenly starts. When trapped in an elevator, stay calm and immediately use an elevator alarm bell, a walkie-talkie or telephone to contact with the relevant personnel and wait for outside help. If the alarm doesn't work, you can call loudly or intermittently tap the elevator door. If a fire broke out on the way, the elevator should stop at the nearest floor and escape quickly from the stairs.
Q:How does the construction lift fall without electricity
This is not calculated according to the distance, it is calculated speed, when the anti-pendant achieves the rated speed, the pendant should be held automatically. It can't go on.
Q:The construction elevator can only go up can't come down what happened
It hasn't risen yet, how it has fallen! Is it a brain teaser?
Q:What is the main function of the construction elevator safety guard
For safety device of construction hoist main effect is in the process of elevator used in times of emergency power, hit the brakes, let hoisting cage security attached on the guide rail frame, prevent the hoisting cage falling!
Q:The construction elevator is commonly used in the process of the project
The construction elevator is commonly used in the process of the project. It is best to give a time period You're just saying one of its USES, I want to know what is the stage of what is going on in the project
Q:What are the requirements for the construction elevator
So for safety device factory test is very strict, before delivery by the statutory inspection unit for torque measurement, critical speed measurement, measuring the amount of spring compression, each with the test report, after assembly to the construction lifter for drop test under rated load, and the site to use the elevator must be every three months to conduct a drop test. For safety device to the factory for two years for safety device (delivery date), must also be sent to the statutory inspection unit to carry on the test, after testing once a year.
Q:How does the construction elevator add up
You can use a ready-made high-altitude operating platform and a high-altitude working platform

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range